Loading...
2015, 01-08 Duct TestingPermit #: Duct Leakage Affidavit (New Construction) House address or lot number: 1 q ()32,+ _ri (lake City: Cond. Floor Area (ft2): G132— Zip: Ci i12 Source (circle one): Estimated Measured 0 Duct tightness testing is not required. The total leakage test is not required for ducts and air handlers located entirely within the building thermal envelope. Ducts located in crawl spaces do not qualify for this exception. Air Handler in conditioned space? 0 yes / Circle Test Method: Leakage to Outside Tptal Lea age Maxlmum duct leakage: Post Construction, total duct leakage: (floor area x .04) = C5 CFM©25 Pa Post Construction, leakage to outdoor: (floor area x .04) = CFM@25 Pa Rough -In, total duct leakage with air handler installed: (floor area x .04) = CFM©25 Pa Rough -In, total duct leakage with air handler not installed: (floor area x .03) = CFM@25 Pa no Air Handler present during test? 0 yes Test Result: kthl CFM©25Pa Ring (circle one if applicable): Open Duct Tester Location: 2 Pressure Tap Location: I certify that these duct leakage rates are accurate and detennfned using standard duct testing protocol. 'l Company Name: clefr Technician Signature: Date: I-4 — IS Phone Number: Technician: r "• i r( R. r . tilt(• iii_P 1/10.P I, i/1 rai,�`��%�, u r u ,7 r dr „iv Itn rfr5 f i yn !! I ,,,�! ;�T j i bit 3 --w! 1 �.2' F rJ'r ��y^' ..4 i . � `t Mitt { dq {',u t)i� i 'I ter ;?' -i` r , �r� I@� L yv JA tit iw . ` r . `�lf'y } r 'Sk- '.ilP Sa.�ai`Fi. �?t" ' �'�i:�Sa, Permit #: Duct Leakage Affidavit (New Construction) __ _Houseaddress-cr_lotnuflb -_-j 9 %- CJB AkE Cny: 5 atikk \1^��^•^' / Zip: Gond. Floor Area (ft"): 034b Source (circle one): P Estimated Measured ❑ Duct tightness testing is not required. The total leakage test is not required for ducts and air handlers located entirely within the building thermal envelope. Ducts located in crawl spaces do not qualify for this exception. Air Handler in conditioned space? 0 yesCEd no Circle Test Method: Air Handler present during test? Oyes ❑ no Leakage to Outside To e Maximum duct leakage: q� p Post Construction, total duct leakage: (floor area x .04) = V�• v4 CFM@25 Pa Post Construction, leakage to outdoort: (floor area x„)4).= CFMC25,Pa Rough-tn, total duct leakage with alr handler installed: (floor area x .04) = CFM@25 Pa Rough -In, total duct leakage with air handler not Installed: (floor area x .03) = CFM@25 Pa Test Result; C ; -i, —t0 CFM@25Pa Ring (circle one if applicable): Open 1 2 3 Duct Tester Location: Pressure Tap Location: I certify that those duct leakage rates are accurate and determined using standard duct testing protocol. Company Name: {ti ' ‘ Technician: tylOC Technician Signature Date: LS- 11- Phone L Phone Number: Duct Testing Calculator (New Construction) House address or lot#: Conditioned Floor Area: Duct tester location: Pressure tap location: Ring (if applicable): /903a E 6P4CP Ade - Calculated Volume (cubic feet) A04/6,x9-2, 4 if/i0 8/3q 76 0 = V74 -A 18 ` 1(c— Pete-'n(eUt ( Calculated Test Result (ACH50) <5.0 ACH50 (CFM5OX 60 � conditioned Volume) Frani- 9Y1r- 3-7& Open • 1 2 • 3 ■ .4 At Rough -In or Post Construction Test Method Standard' Calculated Target Test' CFM25 Air Handler Present (Leakage to Exterior or Total Leakage) 5 4 CFM25 per 100 sf of CFA Air Handler not Present < 3 CFM25 per 100 sf of CFA (Leakage to Exterior or Total Leakage) 1. Test CFM25 must be equal to or less than the calculated target. Air Leakage testing Calculator (Blower Door Test) Conditioned Floor Area: Ceiling Hieght (ft) / S'9& Calculated Volume (cubic feet) T 0 Standard Tested CFM50 Calculated Test Result (ACH50) <5.0 ACH50 (CFM5OX 60 � conditioned Volume) 0-5-6 �y f'�/ ' z T3 66 %s./S70 36,0—' 3-7& Glossary Rough -In: After installation of the complete air distribution system but before installation of insulation and sheet rock. Allows for access to all duct seams and connections for re-evaluation of seal integrity if standard is not met in intitia! test. Post Construction: At or near final inspection. The home must be complete enough to pressurize the home to 25 pa. Total Leakage: Aggregation of the entire systems duct leakage in a duct test. Leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test. Pascal (pa): Unit of pressure CFA: Conditioned floor area in square feet CFM25: Cubic feet per minute of air leakage at 25 pascals of pressure CFMs0: Cubic feet per minute of air leakage at 50 pascals of pressure Conditioned Volume: Volume of conditioned space (CFA X ceiling hieght) ACHso: Air changes per hour at 50 pascals of pressure 7/90 Gale Contractor Services, a Masco Company 400 S Worthen St Wenatchee, WA 98801-3086 Blaine elton, BIo*fDoorTechnician (509) 387-7097 Duct Testing Calculator (New Construction) House address or lot #: ConditionedFloor Area: Duct tester location: Pressure tap location: Ring (if applicable): % ibaa t Gree AJ-e---- J-e./Conditioned /0.),<8 Ja nY J3,0 ---y...: 702 =d c 3 s( fi i25 V g 0 Open • 1 Z 2 0 3 • Tested CFM50 Calculated Test Result (ACH50) At Rough -In or Post Construction Test Method Standard) Calculated Target Tests CFM25 Air Handler Present (Leakage to Exterior or Total Leakage) 5 4 CFM25 per 100 sf of CFA Air Handler not Present < 3 CFM25 per 100 sf of CFA (Leakage to Exterior or Total Leakage) �1. Test CFM25 must be equal to or less than the calculated target. Air Leakage testing Calculator (Blower Door Test) Conditioned Floor Area: Ceiling Hieght (ft) 0133c I Calculated Volume (cubic feet) g 0 Standard I�5.OACH53 Tested CFM50 Calculated Test Result (ACH50) (CFM5ox conditioned Volume) 74ir7 /; 3333 .. /(YD 7?&O .> &( 7Ya/y.60a I SS" Glossary Rough -!n: After installation of the complete air distribution system but before installation of insulation and sheet rock. Allows for access to all duct seams and connections for re-evaluation of seal integrity if standard is not met in intltia! test. Post Construction: At or near final inspection. The home must be complete enough to pressurize the home to 25 pa. Tota! Leakage: Aggregation of the entire systems duct leakage in a duct test. Leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test. Pascal (pa): Unit of pressure CFA: Conditioned floor area in square feet CFM25: Cubic feet per minute of air leakage at 25 pascals of pressure CFMso: Cubic feet per minute of air leakage at 50 pascals of pressure Conditioned Volume: Volume of conditioned space (CFA X ceiling hieght) ACH50: Air changes per hour at 50 pascals of pressure 7,435 Gale Contractor Services, a Masco Company 400 S Worthen St Wenatchee, WA 98801-3086 /333 Blaine Skelton, Blower DaofTechnician (509) 387-7097