2012, 08-07 Permit: SW-12001925 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001925
Permit Issued Date:
08/07/2012
Expiration Date: 08/08/2012
Project Description: SEWER CONNECTION
Project Name: CORBIN (ROYAL EST)
Permit Type: SEWER
Primary Contact: MYNER, DEBRA
Applicant: MYNER, DEBRA
Address: 21 N GRADY LN
GREENACRES, WA 99016
Phone: 509-793-5207
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
21 N GRADY LN
55173.3002
Subdivision: CORBIN ADDITION
Assessor's Description: ROYAL ESTATES LOT 2 BLK 1
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 12116 Square Feet
Owner.
Address:
Phone
Email:
MYNER, DEBRA
21 N GRADY LN
GREENACRES, WA 99016
509-793-5207
Fire District Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
OWNER
OWNER
NOT KNOWN AT TIME OF ENTRY
UNKNOWN, UK 00000
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 08/07/2012 11.18:52
Printed by: 115 APPPOOLVISP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001925 08/07/2012
Expiration Date: 08/08/2012
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES..
Date Printed: 08/07/2012 11:18:52
Printed by: IIS APPPOOL\ASP.NET v4.0