2012, 09-28 Permit: SW-12002290 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002290
Permit Issued Date:
09/28/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
CRONK
SEWER
Primary Contact
Applicant:
Address:
Phone:
Email:
ACME EXCVT & SEWER BORING CO
ACME EXCVT & SEWER BORING CO
6808 S. LINKE RD.
GREENACRES, WA 99016
(509)228-0691
SITE INFORMATION
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area.
Zoning:
1426 N GRADY RD
55172.0605
CORBIN ADDITION
MISSION VISTA ADD L5 B2
Water District:
Consolidated Irrigation
District #19
Owner:
Address: 1426 N GRADY RD
GREENACRES, WA 99016-9444
Phone:
MILLER, PEGGY ANN
Email:
Are District: Spokane Valley Fire
Land Area: 10865 Square Feet
CONTRACTOR INFORMATION'
General Contractor
ACMEEES963LD
ACME EXCVT & SEWER BORING CO
6808 S. LINKE RD.
GREENACRES, WA 99016
(509)228-0691
DETAILS:
Class
Type
Quantity Unit Charge
Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00
$125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS'
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed' 09/28/2012 11.10.37
Printed by: IIS APPPOOLIASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002290 - 09/28/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER 15 RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES
Date Printed 09/28/2012 11:10:37
Printed by: 115 APPPOOLWSP.NET v4.0