Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2009, 12-07 Permit App: 09003903 Pole Bldg
Project Number: 09003903 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/7/2009 Page 1 of 2 Project Information: Permit Use: 40 X 72 POLE BLDG Setbacks: Front Left: Right: Rear: Site Information:neA MEA Plat Key: Name: VALLEY VIEW ADD Contact: Address: C - S - Z: Phone: Group Name: Project Name: QUALITY STEEL BLDGS 7810 N MARKET ST SPOKANE, WA. 99217 (509) 468-1606 MEMENNOMMOSERMENEMENATM District: East Parcel Number: 55181.3203 Block: SiteAddress: 1020 N GREENACRES RD Location:: CSV Zoning: R-3 SF Res District Lot: Owner: Name: THOMASON, KATHY Address: PO BOX 19134 SPOKANE, WA 99219 - Water District: 134 CONSOLIDATED ID #19 Area: 30,422 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Depth: 0 Hold: ❑ Right Of Way (ft): 0 Review Building Plan Review Released`, By: Septic Sys Review Originally Released: 12/7/2009 By: tmelbourn Released By: Originally Released: 12/7/2009 By: LHALSEY Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 12/7/2009 By: mharnois Operator: jmm Printed By: jmm Print Date: 12/7/2009 Project Number: 09003903 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/7/2009 Contractor: Address: QUALITY STEEL BUILDINGS INC 7810 N MARKET ST SPOKANE, WA 99207 Description Grp Type POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes PLAN REVIEW FEE Building Permit Page 2 of 2 Firm: QUALITY STEEL BUILDINGS INC Phone: (509) 468-1606 This Application: Total Project: St Ft Valuation Su Ft Valuation 2,880 $54,720.00 2,880 $54,720.00 Totals: 2,880 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT $54,720.00 2,880 $54,720.00 Fee Amount $678.75 $4.50 $271.50 Permit Total Fees: $954.75 Notes,...... Dry storage building only. Please advise me when a building permit is issued for an accessory structure for this parcel. Route (1) copy of all site plan proposals to: Gordon Hurt Li Transportation Engineer 3 Project Manager 509-921-2403 hurtg@wsdot.wa.gov Cell: 509-220-2071 Eastern Region 2714 North Mayfair Street Spokane, WA 99207-2050 Payment Summary Permit Type Building Permit Fee Amount $954.75 Invoice Amount $954.75 $954.75 $954.75 Amount Paid $271.50 $271.50 Amount Owing $683.25 $683.25 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 12/7/2009 Spokane .0Valley® For City Use:OnL e, PLUS Project Number I Project Address ,' 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 SPOKANE REGIONAL HEALTH DISTRICT Environmental Health Division 1101 W College, Rm 402, Spokane WA 99201 (509) 324-1560 SEWAGE SYSTEM VERIFICATION FORM Since our office does not have information on file showing the location and size of your system, please provide the following information in order for us to review your proposal. 3z Project address: \ 0;t0© (�1• fee -rt PtC-Q.c?S -(PC7 Property owner: Address: Phone: ymp Existing property use: residential ( ) multi -family If a business, name and nature: If a business, approximate metered water consumption: gallons per Type of wastewater fixtures connected to sewage system(s): 1 toilets / showers/tub off, sinks 1 laundry car wash sprinkler system hot tub/spa swimming pool dishwasher (� Year structure built: 1R 3% Year sewage system installed: ( ` 5 g ? Number of bedrooms: Has existing sewage system(s) been reconstructed or repaired? ( ) Yes No No If yes, when: Reason: Location and size of the system: Please make or submit a drawing showing location, dimensions, and measurements of your lot, structure, sewage system(s), water wells, waterline, driveways, direction "north", etc. IDENTIFY WHAT IS DRAWN. I ce at th Sig atu of he p 01/99 :-'"ion is true to the best of my knowledge. perty owner date _i_ ave 2z k g 140 QUALITY STEEL BUILDINGS, INC. 361 SANDY SHORES RD. NEWPORT WA. 99156