Loading...
2014, 04-15 Permit: SW-14000419 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000419 Permit Issued Date: 04/15/2014 Expiration Date: 04/15/2015 Project Description: SEWER CONNECTION Project Name: S GREENACRES Primary Contact: H & S CONSTRUCTION Phone: 509-926-8964 Applicant: H & S CONSTRUCTION Address: 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 Phone: 509-926-8964 Email: SITE INFORMATION: Site Address: 1624 N GREENACRES RD Owner: EASTMAN, NORMA J Parcel Number: 55074.1582 Address: 1702 N GREENACRES RD GREENACRES, WA 99016-8533 Phone: Assessor's Description: TR "B" OF SP 90-616 (AFN #9007030309); BEING Email: A PTN OF GREENACRE IRR DIST PLAT "A" TR 40 IN SE1/4 (50% UNDIV INTEREST) Inspection Area: : (509)-477-3675 Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Zoning: Land Area: 14700 Square Feet CONTRACTOR INFORMATION: HSCON**123KF, Exp. 05/08/2015 H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 $125.00 CONDITIONS: Possible Shoreline On Site Possible FEMA Flood Zone Inside Public Transit Benefit Area Possible Floodplain Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 04/15/2014 14:15:05 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000419 Permit Issued Date: 04/15/2014 Expiration Date: 04/15/2015 SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/15/2014 14:15:05 Project Coordinator: Dawn Dompier