Loading...
2012, 10-09 Permit: SW-12002350 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002350 Permit Issued Date: 10/09/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: SOUTH GREEN ACRES Permit Type: SEWER Primary Contact: POUL CONSTRUCTION Applicant: POUL CONSTRUCTION Address: 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 Phone: 509-979-5872 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: 1720 N GREENACRES RD 55074.1558 PLAT A GRNACRS IRR DIST A B40 N132FT OF E165FT OF W330FT Water District: Consolidated Irrigation District #19 Zoning: Land Area: 21780 Square Feet Owner: Address: Phone: Email: LAMMON, CHRISTINA A & DEL R 1720 N GREENACRES RD GREENACRES, WA 99016 Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor POULCC*932BQ POUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-979-5872 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 10/09/2012 09:34:35 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT • Permit Issued Date: Application Number: SW -12002350 10/09/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/09/2012 09:34:35 Printed by: IIS APPPOOL\ASP.NET v4.0