Loading...
2012, 06-11 Permit: SW-12001509 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT • Application Number: SW -12001509 Permit Issued Date: 06/11/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: SOUTH GREENACRES Permit Type: SEWER Primary Contact: ACME EXCAVATING Applicant: ACME EXCAVATING Address: 6808 S LINKE RD GREENACRES, WA 99016 Phone: 509-251-8058 Email: SITE INFORMATION: Site Address: Parcel Number: 1903 N GREENACRES RD 55074.1138 Subdivision: PLAT A Assessor's Description: Inspection Area: GRNACRS IRR DIST A B24 W130FT OF E150FT OF S77.5FT OF N 310FT Owner: Address: Phone: Email: MATHEWS, BRUCE A & BRENDA K 1903 N GREENACRES RD GREENACRES, WA 99016-8500 Water District: Fire District: Spokane Valley Fire Consolidated Irrigation District #19 Zoning: Land Area: 0.2298 acres / 10010 sqft CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT & SEWER BORING CO 6808 S LINKE RD GREENACRES, WA 99016 509-228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 06/11/2012 08:18:55 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT • Permit Issued Date: Application Number: SW -12001509 06/11/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/11/2012 08:18:55 Printed by: IIS APPPOOL\ASP.NET v4.0