2012, 06-11 Permit: SW-12001509 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
•
Application Number: SW -12001509
Permit Issued Date:
06/11/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: SOUTH GREENACRES
Permit Type: SEWER
Primary Contact: ACME EXCAVATING
Applicant: ACME EXCAVATING
Address: 6808 S LINKE RD
GREENACRES, WA 99016
Phone: 509-251-8058
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1903 N GREENACRES RD
55074.1138
Subdivision: PLAT A
Assessor's Description:
Inspection Area:
GRNACRS IRR DIST A B24 W130FT OF E150FT
OF S77.5FT OF N 310FT
Owner:
Address:
Phone:
Email:
MATHEWS, BRUCE A & BRENDA K
1903 N GREENACRES RD
GREENACRES, WA 99016-8500
Water District: Fire District: Spokane Valley Fire
Consolidated Irrigation
District #19
Zoning: Land Area: 0.2298 acres / 10010 sqft
CONTRACTOR INFORMATION:
General Contractor
ACMEEES963LD
ACME EXCVT & SEWER BORING CO
6808 S LINKE RD
GREENACRES, WA 99016
509-228-0691
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 06/11/2012 08:18:55
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
•
Permit Issued Date:
Application Number: SW -12001509 06/11/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/11/2012 08:18:55
Printed by: IIS APPPOOL\ASP.NET v4.0