Loading...
2013, 12-11 Permit App: BLD-2013-2517 Storage BldgDevelopment Department *nnmunity rmit Center *Wane 11703 East Sprague Avenue, Suite B-3 Spokane Tel: (509) 720-2540 Spokane Valley, WA 99206 Valley Fax: (509) 688 0037 permitcenter@ sookanevallev.orq r(Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 0 NEW CONSTRUCTION 0 ADDITION/REMODEL $ ACCESSORY BUILDING 0 DECK 0 OTHER SITE ADDRESS: f 10 tN Gee.eu.Qcr-es Qdl. S pow UA 1 Q%( Qi0 I to ASSESSORS PARCEL NO.: S5"o7-1 . 103 9 LEGAL DESCRIPTION 54- a BUILDING OWNER NAME: NAME: ADDRESS: 1,J l I I .rte t b rte. k CAA/Y) 7q a o v\/ Core -e ice!. CITY: C;p:) Q 7 An.Q V k.J PHONE: 5� / %� f 7I /d 2, CONTACT NAME: STATE: FAx 7 g, /�% /S- CELL: ZIP: 0 PHONE: SQ 46 4L0 (�i_ FAX: CONTRACTOR NAME: CELL: MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ,mow O d .L -V.)045/ s Iry pcfA.,td -pe i%SOL4 c 1.E9 4; "e! P lac710 y_a ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: /% Dimensions: v2L4 ' X 45 No. of Stories: ) Total Habitable Space: 02gis SS AL Main Floor SQ FT: /0 *lO 51 Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area:ai/AX 4sI 30% Slopes on Property: No. of Bedrooms: /V//4 Construction Type: 5#,c(. Heat Source: 1.4.x.. Sewer or Septic: s.e!v . TOTAL COST OF PROJECT: $ /O/lOO. DO DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsuently approved before this application can be processed. Signature c/4 Date: ,/// /3 Updated 1-11-11 http: //www. spokaneva I ley.org/fi lestorage/ 124/938/210/948/ 1496/2743/Res_Permit. doc Page 1 of 1 •SOlaneValleye Target Date sheet ForCity Use Only? -� --r PLUS Project , '>C_ '� v. '. Project Address rLFEJLJACI2F 9 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 S2C62sS "'% 3. FND 60D SPIKE (R -1)(R -3)(R-4) FND 1/2" REBAR'W/ CAP MARKED 9518076' R-6 IRRIGATION EASEMENT AF 89002C - 20' 20' -- 0 — — Z INDIANA L FINAL SHORT PLAT SHP--23-04 PORTION OF SEI/ OF SECTION 7, T,25N, R15L, KIK CITY OF SPOKANE WIRY, IYASHINGTON SHEET I of z - RID 1/2" FEW W/ CM WAKED 1518076" R-6 AVENUE Ni9.5059 E 34145' 230.45' (R-6) 12412 2QJp 148.00' 5' IITARYJ EASEMENT LOT 3 20,054 SO FTA 1 1920 1 10' UIR11Y ElS01FN' 148.00' 10400' Y � 660' (P) 65870(8-6) 658.63'(1-1) N 97.45' � 12612 P) 125858' (-1) LOT 2 8 22,210 SO FTA 1184021 119950'59"f 12' BORDER EA41810 WEST UNE OF EAST 3 ACNES � v b g R-1 114.07' N9950'$9'5' 10.00' A __ILO / N995059 E c /5.00' ..� 12.5' 12.5' -1- 11.97"30 591" AF 518736 AF 5087 6 5FASEM€NT— LOT 4 40,453 50 FTA 1910 1 1 I l ado l I=1�1 • II 161.A0' I' I 230.79' (R-6) +9')'"- I LOT 1 38TA 994 50 F h (4,9 t(tP 1184101 178.00' 146.79' 889'50".71 1" 20' 20' t- 849 1/2 6E818 W/ CAP ....slain 9518078' g °: R-6 � N LEGEND FND 60D SPIKE (R -3)(R-6) YL5570N A!'EM/A N 69'59'59" E • 0 171221 FOUND MONUMENTS AS NOTED SET 1/2" REBAR W/ CAP MARKED "L5 18076" SECTION CORNER 1/4 SECTION CENTER SECTION LOT ADDRESSES PROPERTY LINE ADJOINING PROPERTIES RIGHT OF WAY CENTER LINE EASEMENTS N\Lend 2004\04199 -ABRAHAM dw9\04199-PSP-D.DVG 7/26/2005 40.79 FW 1/2" W/ 000 Nee 9318016" 0 8011# 509° 161 CISC REFERENCES: R-1 a PLAT, SIMPSON'S 1ST ADD TO GREENACRES, VOL 14, PG 79. R-2 ROS 800K 6 PAGE 35, SIMPSON PLS R-3 SP 616-90, FLAGAN PLS R-4 R05 BOOK 3, PAGE 15, SIMPSON PLS 11/74. R-5 PLAT "A" GREENACRES IRRIGATION DISTRICT R-6 ROS BK. 110, PG 64 BASIS OF BEIRJNCS:• NO'15'441V N -S CENTERLINE OF GREENACRES (ASSUMED) 1242,36 PH PST 9 680' 659.0 658.9' 1300.21' (P) 1300.18' (R-1) ABBREI7ATIONS 0740 - FOUND PR = PROPORTIONAL PRO 4. PROPORTION IP 44 IRON PIPE M - MEASURE Jl, EQUD7d(ENT & PROCEDURES THE SURVEY PERFORMED HEREON WAS 8Y USE OF A 5 SECOND THEODOUIE, DISTANCE METER, SURVEY TAPE AND PLUMB BOBS. THE PROCEDURE WAS BY FIELD TRAVERSE CLOSURE WAS WITHIN LEGAL UNITS. 9Cf ( `--CLv LI elle ti FND BRASS CAP AS PER (5-6) AUDITORS CBRTIFICA Filed for record this 7 day of r 2005 at 3t6l •M 0 bbno5��'k_2.9__of short plots at page JL31:1i of the request of RAX.LS, LLC. S Cl6tNTITOR - a4rA.,xy CITY OF SPOKANE WHY DEPARTIENT OF C0kWUNITY DEYELOPAIENT Examined and approved this %day of 2005. A1GP DIRECTOR, SPOKANE VALLEY DEPARTMENT OF COMMUNITY DEVELOPMENT CITY OF SPOKANE VALLEY CITY ENGINEER G Exarjyned and Approved this 19 +s—qday of �'iwu04in� , 2005. OF SPOKANE VALLEY CITY ENGINEER SPOKANE COUNTY. DII'SION OF UTIUl7YE5 Examined and approved this 2.2—_day of 4.(/6//67" 2005. r44,SPP%ANE UTILITIES DIRECTOR SPOKANE REGIONAL REALM DISTRICT Exomin d and approved this�day of p4f11s� /�►'(�( t`,/j2'005. 4, SPOKANE10.440444k REGIONAL IOHEALTH OPPICER SPOKANE COUNTY TREASURER I, Treasurer of Spokane County, Washington, do hereby certify that all taxes which have been levied and become chargeable against the land shown within this map and described In the dedication of this date, hove been fullyulpaid, satisfied and discharged. Dated this._ L.f_day offa8..(� 4 �V2005. 1 IA)041 POKANE COUNTY Y TRE URE QR BY DEPUTY4 /j? SPOKANE COUNTY ASSESSOR Exined anypproved lhis�doy of ii y 2 '4 /e: SPO COUNTY ASSESSOR BY DEPUTY SURVEYORS CERTIFICATE THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER MY 8 DIRECTION 114 CONFORMANCE WITH THE REQUIREMENTS OF THE CITY OF SPOKA VALI05\SUBDIVISION ORDINANCE. 0 25' 50' 100' MIS SC4LIC• 3" = 50' WRENCE E. BENSON, L.S. (J18076 THIS STAMP 15 N07 VALID UNLESS SIGNED BY AN ORIGINAL SIGNATURE AND DATE CITY OF SPOKANE VALLEY SHORT PLAT SHP-23-04 PORTION OF SE1/4 OF SECTION 7, T25N, R45E, W.M. SPOKANE COUNTY, WASHINGTON 111Vr Rani 0( cG" edkkocsaleof 2�Pi. 10 CML ENGINEERS AND AMID SURVEYORS 14 W. CRAVES ROAD, SPOKANE, WASIMIGTON 99218 (509) 467-5261 DATE 07/26/05 0091' DRAWN BM DRS CHECKED 0Y: FlELD ea*. LLLL8/40,TA COL M7LLL4/4f ABRAHAM 1920 N. GREENACRES ROAD SPOKANE VALLEY, WA 99016 PROJECT N0. 04199 SHT 1 OF 2