2013, 12-11 Permit App: BLD-2013-2517 Storage BldgDevelopment Department
*nnmunity
rmit Center
*Wane 11703 East Sprague Avenue, Suite B-3
Spokane Tel: (509) 720-2540
Spokane Valley, WA 99206
Valley Fax: (509) 688 0037
permitcenter@ sookanevallev.orq
r(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
0 NEW CONSTRUCTION 0 ADDITION/REMODEL $ ACCESSORY BUILDING
0 DECK 0 OTHER
SITE ADDRESS: f 10 tN Gee.eu.Qcr-es Qdl. S pow UA 1 Q%( Qi0 I to
ASSESSORS PARCEL NO.: S5"o7-1 . 103 9 LEGAL DESCRIPTION 54- a
BUILDING OWNER NAME:
NAME:
ADDRESS:
1,J l I I .rte t b rte. k CAA/Y)
7q a o v\/ Core -e ice!.
CITY: C;p:) Q 7 An.Q V k.J
PHONE: 5� / %� f 7I /d
2,
CONTACT NAME:
STATE:
FAx 7 g, /�% /S- CELL:
ZIP: 0
PHONE: SQ 46 4L0 (�i_ FAX:
CONTRACTOR NAME:
CELL:
MAILING ADDRESS:
CITY:
STATE:
ZIP:
PHONE:
FAX:
CELL:
CONTRACTOR LICENSE No.:
EXPIRES:
CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
,mow O d .L -V.)045/ s Iry pcfA.,td
-pe i%SOL4 c 1.E9 4; "e! P lac710 y_a
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
/%
Dimensions:
v2L4 ' X 45
No. of Stories:
)
Total Habitable
Space: 02gis SS AL
Main Floor SQ FT:
/0 *lO 51
Upper Floor SQ FT:
Unfinished Basement SQ
FT:
Finished Basement SQ
FT:
Garage SQ FT:
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:ai/AX 4sI
30% Slopes on
Property:
No. of Bedrooms: /V//4
Construction Type: 5#,c(.
Heat Source: 1.4.x..
Sewer or Septic: s.e!v .
TOTAL COST OF PROJECT: $ /O/lOO. DO
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsuently approved before this application can be processed.
Signature
c/4
Date: ,/// /3
Updated 1-11-11
http: //www. spokaneva I ley.org/fi lestorage/ 124/938/210/948/ 1496/2743/Res_Permit. doc
Page 1 of 1
•SOlaneValleye
Target Date sheet
ForCity Use Only? -� --r
PLUS Project , '>C_ '� v. '.
Project Address
rLFEJLJACI2F 9
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
S2C62sS "'% 3.
FND 60D SPIKE
(R -1)(R -3)(R-4)
FND 1/2" REBAR'W/ CAP
MARKED 9518076' R-6
IRRIGATION EASEMENT
AF 89002C
-
20' 20'
--
0
— — Z
INDIANA
L
FINAL
SHORT PLAT SHP--23-04
PORTION OF SEI/ OF SECTION 7, T,25N, R15L, KIK
CITY OF SPOKANE WIRY, IYASHINGTON
SHEET I of z
- RID 1/2" FEW W/ CM
WAKED 1518076"
R-6
AVENUE
Ni9.5059 E 34145'
230.45' (R-6)
12412
2QJp
148.00'
5' IITARYJ
EASEMENT
LOT 3
20,054 SO FTA
1 1920 1
10' UIR11Y
ElS01FN'
148.00'
10400'
Y �
660' (P)
65870(8-6) 658.63'(1-1) N
97.45' � 12612 P)
125858' (-1)
LOT 2
8 22,210 SO FTA
1184021
119950'59"f
12' BORDER
EA41810
WEST UNE OF
EAST 3 ACNES
� v
b g
R-1
114.07'
N9950'$9'5'
10.00'
A
__ILO
/ N995059 E
c
/5.00' ..�
12.5'
12.5'
-1-
11.97"30 591"
AF 518736
AF 5087 6 5FASEM€NT—
LOT 4
40,453 50 FTA
1910 1
1 I
l ado l
I=1�1
• II
161.A0' I' I
230.79' (R-6) +9')'"- I
LOT 1
38TA
994 50 F
h (4,9
t(tP
1184101
178.00'
146.79'
889'50".71 1"
20' 20' t- 849 1/2 6E818 W/ CAP
....slain 9518078'
g °: R-6
� N
LEGEND
FND 60D SPIKE
(R -3)(R-6)
YL5570N A!'EM/A
N 69'59'59" E
•
0
171221
FOUND MONUMENTS AS NOTED
SET 1/2" REBAR W/ CAP
MARKED "L5 18076"
SECTION CORNER
1/4 SECTION
CENTER SECTION
LOT ADDRESSES
PROPERTY LINE
ADJOINING PROPERTIES
RIGHT OF WAY
CENTER LINE
EASEMENTS
N\Lend 2004\04199 -ABRAHAM dw9\04199-PSP-D.DVG 7/26/2005
40.79 FW 1/2"
W/ 000
Nee 9318016"
0 8011#
509° 161 CISC
REFERENCES:
R-1 a PLAT, SIMPSON'S 1ST ADD
TO GREENACRES,
VOL 14, PG 79.
R-2 ROS 800K 6 PAGE 35,
SIMPSON PLS
R-3 SP 616-90, FLAGAN PLS
R-4 R05 BOOK 3, PAGE 15,
SIMPSON PLS 11/74.
R-5 PLAT "A" GREENACRES
IRRIGATION DISTRICT
R-6 ROS BK. 110, PG 64
BASIS OF BEIRJNCS:•
NO'15'441V N -S CENTERLINE
OF GREENACRES (ASSUMED)
1242,36 PH PST
9
680'
659.0
658.9'
1300.21' (P)
1300.18' (R-1)
ABBREI7ATIONS
0740 - FOUND
PR = PROPORTIONAL
PRO 4. PROPORTION
IP 44 IRON PIPE
M - MEASURE
Jl,
EQUD7d(ENT & PROCEDURES
THE SURVEY PERFORMED HEREON WAS 8Y USE
OF A 5 SECOND THEODOUIE, DISTANCE METER,
SURVEY TAPE AND PLUMB BOBS. THE PROCEDURE
WAS BY FIELD TRAVERSE CLOSURE WAS WITHIN
LEGAL UNITS.
9Cf
(
`--CLv LI elle ti
FND BRASS CAP
AS PER (5-6)
AUDITORS CBRTIFICA
Filed for record this 7 day of
r 2005 at
3t6l •M 0 bbno5��'k_2.9__of short
plots at page JL31:1i of the request of
RAX.LS, LLC.
S
Cl6tNTITOR - a4rA.,xy
CITY OF SPOKANE WHY
DEPARTIENT OF C0kWUNITY DEYELOPAIENT
Examined and approved this %day of
2005.
A1GP
DIRECTOR, SPOKANE VALLEY DEPARTMENT OF COMMUNITY DEVELOPMENT
CITY OF SPOKANE VALLEY
CITY ENGINEER G
Exarjyned and Approved this 19 +s—qday of
�'iwu04in� , 2005.
OF SPOKANE VALLEY CITY ENGINEER
SPOKANE COUNTY.
DII'SION OF UTIUl7YE5
Examined and approved this 2.2—_day of
4.(/6//67" 2005.
r44,SPP%ANE UTILITIES DIRECTOR
SPOKANE REGIONAL REALM DISTRICT
Exomin d and approved this�day of
p4f11s� /�►'(�( t`,/j2'005.
4, SPOKANE10.440444k
REGIONAL IOHEALTH OPPICER
SPOKANE COUNTY TREASURER
I, Treasurer of Spokane County, Washington, do
hereby certify that all taxes which have been levied
and become chargeable against the land shown within
this map and described In the dedication of this date,
hove been fullyulpaid, satisfied and discharged.
Dated this._ L.f_day offa8..(� 4 �V2005.
1 IA)041
POKANE COUNTY Y TRE URE QR BY DEPUTY4 /j?
SPOKANE COUNTY ASSESSOR
Exined anypproved lhis�doy of
ii y 2 '4 /e:
SPO COUNTY ASSESSOR BY DEPUTY
SURVEYORS CERTIFICATE
THIS MAP CORRECTLY REPRESENTS A
SURVEY MADE BY ME OR UNDER MY
8 DIRECTION 114 CONFORMANCE WITH THE
REQUIREMENTS OF THE CITY OF SPOKA
VALI05\SUBDIVISION ORDINANCE.
0 25' 50'
100'
MIS
SC4LIC• 3" = 50'
WRENCE E. BENSON, L.S. (J18076
THIS STAMP 15 N07 VALID UNLESS SIGNED
BY AN ORIGINAL SIGNATURE AND DATE
CITY OF SPOKANE VALLEY
SHORT PLAT SHP-23-04
PORTION OF SE1/4 OF SECTION 7, T25N, R45E, W.M.
SPOKANE COUNTY, WASHINGTON
111Vr Rani 0( cG" edkkocsaleof 2�Pi. 10
CML ENGINEERS AND AMID SURVEYORS
14 W. CRAVES ROAD, SPOKANE, WASIMIGTON 99218 (509) 467-5261
DATE 07/26/05
0091'
DRAWN BM DRS
CHECKED 0Y:
FlELD ea*. LLLL8/40,TA COL
M7LLL4/4f ABRAHAM
1920 N. GREENACRES ROAD
SPOKANE VALLEY, WA 99016
PROJECT N0.
04199
SHT 1 OF 2