Loading...
2014, 11-18 Permit: ROW-2014-0662 Right of WaySpokane #alley. City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter@spokanevalley.org ROW -2014-0662 DE -ROW PROJECT NAME: ISSUED: 11/18/2014 SITE ADDRESS: 110 N HARMONY SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: SEWER CONNECTION PARCEL: 55083.0301 APPLICANT: VIETZKE EXCAVATING OWNER: HATFIELD, BRADY T & ALISHA J 2011 S CRAIG RD #1 AIRWAY HEIGHTS, WA 1710 N HARMONY LN 99001 GREENACRES, WA 99016 509-994-0367 GENERAL CONTRACTOR: VIETZKE EXCAVATING 2011 S CRAIG RD #1 AIRWAY HEIGHTS, WA99001 509-994-0367 License: VIETZEC121MA Expires: 08/07/2015 FEES: Right of Way Paid $110.00 Due $0.00 Totals : $110.00 $0.00 CONDITIONS * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. * For work blocking less than 50% of a local access street the contractor, at a minimum, is required to have Construction Ahead signs placed ahead of the work zone. Note — if it turns out that the work blocks more than 50% of a local access street then this permit is not valid and the contractor must submit a traffic control plan to the City for review/acceptance prior to continuance of the work. All traffic control shall follow MUTCD standards. The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's expense. Owner/Agent Date: Staff Approval Date: Pnnted by. Pbarclay on 11/18/2014 08.22 AM Page 1 of 1 SiokanG e� �Ua11ey° 11703 E. Sprague Ave., Suite 8-3 Spokane Valley, WA 99206 Receipt Number: 201403423 (509) 720-5240 permitcenter@spokanevalley.org Payer/Payee: VIETZKE EXCAVATING 2011 S CRAIG RD #1 AIRWAY HEIGHTS WA99001 Cashier: HMORRIS Payment Type: CREDIT CARD Date: 11/18/2014 ROW -2014-0662 RIGHT OF WAY PERMIT 110 N HARMONY Fee Description Right of Way ROW -2014-0662 TOTALS: TOTAL PAID: Printed 11/18/2014 08:1900 by Heather Morris Fee Amount $110.00 Amount Paid $110.00 Fee Balance $0.00 $110.00 $110.00 $0.00 $110.00 Page 1 of 1