Loading...
2014, 11-14 Permit App: ROW-2014-0662 Right of Waylv 141401:04p Vietzke *Tame Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509)688-0337 cermt:enterpsnokaneval ey orq 5092440596 p.1 PERNIT NUMBER Project # O U Z0/4 -0662-1 IVED (Staff Use Only: t., 0: NOV i, 2014 PERNIT I fEe: CSV PERMIT CENTER cit r-----� RIGHT OF WAY (ROW) PERMIT APPLICATION# APPROACH PAVEMENT CUT (SEE BELOW) SIDEWALK CURB & GUTTER / WORK THROUGH MANHOLE ( OTHER WO > )a- { 4-14 \ /Lis 04 e ROAD OBSTRUCTION \ NO YES (if yes, complete the following) % of street or # lanes that will be obstructed: Length of time street will be obstructed: c4.If work closes more than 50% of a local access street, or closes any portion of an arterial street, then a TRAFFIC PLAN IS REQUIRED Pre -Approved TCP Proposed: PROJECT ADDRESS: 1 0 N • 1evwa APPLICANT'S_JOB 41: START DATE: 1I— n- Z(J`y - PROJECT DESCRIPTION: REV #[ED PARCEL NUMBER: '/73.1797 LOCATE TICKET # /1346a-6 ANTICIPATED COMPLETION DATE: '(-20-20)'1 Sct Co n1& t — ukt tcia-- d— di — I A.R4t144 F j PROPERTY OR BUILDING OWNER INFORMATION (IF APPLICABLE) MAILING ADORERS: QTY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR INFORMATION boa tl c Ci zlC-e/. E XC,crU/041- itAbM D -.2 MAILING ADDRESS: So IA td!-BLV7( m cm: 1 r rtisL(7 STATE: yvclP: MOO PHONE: 'SIP:\ -241'1 -GIC FAX: as -9G `nu SO°I-Icv1-0367 CONTRACTOR LICENSE No.: V t e{ ZPt ail... , WIRES: 5'.j=2bt r an BUSINESS LICENSE No.: BONO/INSURANCE CERTIFICATE # (per SVMC Title 10, Article 2): httpiAvrpn.spokenevalley ora,7lastoraao:124/9G8210/948/; 49Gr?R.Tt/RCIwPA doe Received Time Nov. 14. 2014 11:29AM No. 1251 1114/14, 11.34 AM Page 1 of 3 Nov 14 14 01:04p Vietzke CONTACT NAME: 5092440596 13.2 PMONE: **** IF PAVEMENT CUT, COMPLETE THE FOLLOWING **** NATURE OF WORK: (Clyde one) Gas Electric Water CAN Communication Sewer,Other TYPE OF CUT/REPAIR: (circle one) Asphalt Gravel Concrete Other SIZE OF CUT (width) x (length) STAFF TO COMPLETE: ROAD TIER: APPLIES? PAVEMENT CUT POLICY The penmtte veflfles, acknowledges and agree by their signature that: 1) if this permit is for construction or on a dwelling, the dwSPng Ia/w0 be served by potable water. 2) Ownership of thls City of Spokane Valley permit Inures to the property owner. 3) The signatory is the property owner or has permission to repressit the property owner In this transaction. a) Ali construction S to bo done In NI compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The Crty of Spokane Valley permit Is not a permit or approval for any violadon of federal, state or fetal laws, codes or ordinances. 6) Plans Or addltlonal bdormation may be required to be submittedand subsequently approved before this applka gain can be pre sed, ECP/RATION Right-of-way permits Issued between April 1 and Septette 30 are Valid for 30 days after the date of Issuance. with a one -tune 30 -day extension avalbbI. Ragbt-of-way permits Issued between October 1 and Mardi 31 are valid until the ktbwInq April 30. Applicant Signature: Method of payment: Cash Check Mastercard'* Date: /1—)1 —281 y • • If paying with credit card, the City will all for credit card Information when the permit Is ready to be Issued. PLEASE FAX TO CITY OF SPOKANE VALLEY (509) 588-0037 UPON COMPLETION Reeser 41140014 hitp:/Avww.spokanevalloy or4cIostoraqe/1 tie 24193 8/21 0949/1 4 9 5128 21 /RcwPA.doc Received Time Nov, 14. 2014 11:29AM No. 1251 11/14114. 1134 AM Page 2 013