Loading...
HomeMy WebLinkAbout2009, 09-01 Permit App: 09002798 MH400.2Val Iey Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Site Address: 8718 E HARRINGTON AVE Parcel Number: 45184.1835 Zoning: 1R.3. K _ Fire District: FD 01 Water District: HUTCHINSON New project Previous pre -app meeting 0 Plan revisions Transmittal Date: Tuesday, September 01, 2009 Project Number: 09002798 Applicant: SCHAULS FAMILY TRUST 8718 E HARRINGTON AVE SPOKANE, WA 99212 (509) 000-0000 e-mail: Contact: SCHAULS FAMILY TRUST 8718 E HARRINGTON AVE SPOKANE, WA 99212 (509) 000-0000 e-mail: Contractor: OWNER ( ) - 0 Owner: SCHAULS FAMILY TRUST 8718 E HARRINGTON AVE SPOKANE, WA 99212 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Project SET 2005 27 X 62 GRHIL Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO SITE PLA N Please send all plan review and project comments via e-mail to the highlighted individuals. Permit Center (in 0*' 11703 E Sprague Ave, Suite B-3 40000ValleSpokane Valley, (509) 99206 �' (509)688-0036 FAX: (509)688-0037 _ www.spokanevalley.org _lav LB BY Community Development CITY OF SPOKANE \/ALLEY SEP 0 1 2009 Manufactured Home Permit Application SITE ADDRESS: �? /t BY: i/ 4 r.z,f7' Ave ASSESSORS PARCEL NO: (90.76P51 /y'S- F' •aILr1 OTHER LEGAL DESCRIPTION: Building Owner: )') Length: Name: /-4 r, f �� Name: Dc r r4 y 1 ..1-, 4 k ., G ; 0`,.5-- Address: Septic/Sewer: e ry Address: t.f i/te F. 771, ; r -,-;/1,../ /l..e City:4 , , State: G✓* Zip: City:1p� yi:�,+e G-14:,State: c�,zi Zip: 1 / L Phone: so 9 92Y ? C17 i. Fax: City Business Lic. No: Contact Person Name: ('/ r; 4. /1/1 N,� M�: t7 Phone: (S.'`') 6 / - Zs iy Describe the scope of work in detail: /4/bre PERMIT NUMBER: L 7 c (y PERMIT FEE: r�L �,`6k St (i'.r-4,51,R.ie /1'1 /4`-00/.4 74 T(%�rr�+v; LLLVA13f /%T Kca^fife, 4,14 ,r t i4 <ye / _40‘-.4.,..e Ca Contractor: )') Length: Name: /-4 r, f �� Year: ; 0`,.5-- Address: Septic/Sewer: e ry City:4 , , State: G✓* Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: vc < < ..s."7".0,7"-- MANUFACTURED ,1_-oT MANUFACTURED HOME Width: )') Length: 6.d Year: ; 0`,.5-- Pit Set: Na Septic/Sewer: e ry Manufacture: G / /t/G Previous Address: N/,/ Proposed Use: ,S;ti.,/, /y ej/4 - / C) (r# re J -'a v .v la T'r r+✓ The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signaturee-�jr ili�tr X, Jc, Date ?"7-4' Method of Payment: ❑ Cash ❑ Check ❑ Mastercard 1=] VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 8/23/2005 45kI.C41e\**1*• •0' Valley @ For City Use Only PLUS Project Number ,'J Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is cif icz 1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 r.-7 .e /V • (.3)7( 415- ??,1- 1 v -e • A 7- 90 i /004 AREA SPOKANE VALLEY NOTICE OF INSPECTION P - OPERTY ADDRESS: Inspections performed 10 days after scheduled completion to schedule call (509)688-0195 or Fax (509)688-0037. Any re- inspection will incur an additional $25.00 charge. 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 99206 V Construction Permit 04-495 Issue Date 7/7/2004 Account # PROJECT NO. Okt 0 OWNER CONTRACTOR INSPECTION TYPE: Q ottorri J %-u. h Issued by Ddompier Construction Utility Project Description driveway STATUS OF WORK LISTED ABOVE: C GNU H CRN # NOTES: fc ME rfc, C� Bond $ $0.00 BY INSPE C�jiTEt I Fee Total Fees Collected $50.00 Individual Name Contractor Phone # Account # QUESTIONS? CA L OUR OFFICE: (509) 688-0036 OFFICE INSPECTION LINE (509) 688-0054 CALLED IN: Slaiane DATE TIME Approved okane Valley to charge the fee for this permit to my credit card. Expiration Date Signature Name of Holder In addition to the permit application fee of $16.00 (utility) or $25.00 (construction), inspection on each permit will be billed to the permittee at a rate of $50.00 per hour with a $25.00 (1/2 hour) minimum. Permittee signature constitutes an agreement to these terms and provisions. Work completed satisfactorily (signed) Date PERMIT MUST BE KEPT ON SITE Contractor: ALL SEASONS EXCAVATION License #: ALLSEEI161 C 1 SEWER CONNECTION 1 $85.00 PROCESSING FEE 1 $15.00 Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5:00 PM MONDAY THRU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation. Sewer stubs are to be checked prior to connection to ensure that they have acceptable grade and are clear and unobstructed to the main sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the structure. This permit must be presented to the job site inspector for verification. To locate buried cables, gas piping, water lines, etc. CALL BEFORE YOU DIG, (509)456-8000. STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000. Spokane County Code requires the installer comply with all requirements of the Washington State Dept of Labor and Industries, including those related to trench safety. 1 1 -�1 SPOKANE COUNTY DEPARTMENT OF BUILDING & CANNING DEPARTMENT OF BUILDING PLANNING S T} 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 8718 E HARRINGTON AVE Parcel Number: 45184.1835 Subdivision: Block: 4 Lot: 8 Zoning: UNK Unknown Owner: SCHAULS, DOROTHY Address: 8718 E HARRINGTON AVE SPOKANE VALLEY, WA 99202 Building Inspector: BOBBY STONE Water Dist: Project Number: 04005590 Inv: 1 Issue Date: 7/29/2004 Permit Use: SEWER CONNECTION - HARRINGTON Applicant: ALL SEASON EXCAVATION P.O. BOX 14978 SPOKANE, WA 99214 Phone: (509) 922-4135 Contact: ALL SEASON EXCAVATION P.O. BOX 14978 SPOKANE, WA 99214 Phone: (509) 922-4135 Setbacks - Front: Left: Right: Rear: Jurisdiction:: CITY OF SPOKANE VALLEY Group Name: Project Name: Permits Sewer Connection Permit 1 Payment Summary Total Fees AmountPaid AmountOwing $100.00 $100.00 $0.00 Tran Date 7/29/2004 7/29/2004 Processed By: BURRIS, ROBIN Printed By: WENDEL, GLORIA Page 1 of 1 Receipt # Payment Amt 4284 $0.00 4285 $100.00 PERMIT