Loading...
HomeMy WebLinkAbout2009, 11-03 Permit App: 09003492 Pole BldgProject Number: 09003492 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 11/3/2009 Page 1 of 2 Project Information: Permit Use: 24 X 30 POLE BLDG Contact: SPOKANE STRUCTURES Address: 510 N MULLAN ST C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 927-0655 Group Name: Site Information: Project Name: Plat Key: 000000 Name: Range District: Sout Parcel Number: 45291.1809 Block: SiteAddress: 2208 S HERALD RD Location:: CSV Lot: Owner: Name: MINER, JEFFREY S Address: 2208 5 HERALD SPOKANE VALLEY, WA 99206 Zoning: R-2 SF Res Suburban District Water District: 098 SPO CO WATER DIST#1 Hold: ❑ Area: 12,125 Sq Ft Width: 123 Depth: 97 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 10/28/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 11/3/2009 By: tschmidt Permits: , Operator: jmm Printed By: JD Print Date: 11/3/2009 Project Number: 09003492 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 11/3/2009 Page 2 of 2 Building Permit Contractor: SPOKANE STRUCTURES INC Firm: SPOKANE STRUCTURES INC Address:. 510 N MULLAN RD Phone: (509) 927-0655 SPOKANE, WA 99206 This Application: Total Project: Description Gro Lys Notes Su Ft Valuation Sci Ft Valuation POLE BDLG U-1 VB PLAN 720 $13,680.00 720 $13,680.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Notes: Totals: 720 $13,680.00 720 $13,680.00 Units Unit Desc 1 SELECT I SELECT 1 SELECT Fee Amount $237.25 $59.31 $4.50 Permit Total Fees: $301.06 Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $301.06 $301.06 $59.31 $241.75 $301.06 $301.06 $59.31 $241.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 11/3/2009 Spoknea crr or cgoos Ualle� Community Developme Residential Co Permit Applic Permit Center 11703 E Sprague Ave, Suite 8-3 Spokane Valley, WA -99'_O6`: (509)688-006 FAX: (509)688-00j7 www.5tlol:anevallevorr• CSV PEBMI Gmoi' i i=i structjgn tion Project Tr SITE ADDRESS: AA, ( t� ASSESSORS PARCEL NO: `t".S (94'1 / RH PERMIT NI/MB Eq�3q9 zi PERMIT FEE: New Construction Addition/Remodel Other: v Accessory Bldg Deck 2L LEGAL DESCRIPTION: Building Owner: Contractor: NameJc c Address2.10 S. City: SnCesifitl 'a!'/ Phone: 9 4 3 _ ! )s Fax: States. aA Zip: f Contact Person Name: W B 2..St.eit5 Phone: 50 1- 9 Z2._ Db Describe the scope of work in detail: Posy- ��+ /lucW,NG- Name: CD KANE STnUCTURES, Address: 510 N. MULLAN ROAD INC. City: SPCIKANF VALLEY Phone: S09_977-0E5S Contractor Lic No: CP K.71CI12C06 City Business Lic. No: State: Zip: WA 9870, Fax: S09 -977-40f7 Exp Date: 1/1/08 Cost of Project: $ /i%t?Dd Proposed Use: G-4—+244& /S r **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: 16' DIMENSIONS: s�`'t'y3a`>< /S%O # OF STORIE : 1 TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: r7 20 Q lL I fu FLOOR SQ. FTG: � UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: G4RAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: e-SECN R R SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. DATE: /v 6707 Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REISED 2/15,07 ❑ Check ❑ Mastercard ❑ VISA Expires: VIN#: Spokane Valley® For City Us- Otte PLUS Project Number -- Project Address & OP S 11703 E Sprague'Ave Suite 8-3 ♦ Spokane Valley WA 99206 • 509.688.0036 • Fax: 509.688.0037 • permitcenferispokanevalley.org • As part of our on-going commitment to customer' service during the review process -of your project, application, we are providing you with a TARGET DATE for the initial technical,app lication review, If for, any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your 'project application,will-have Thad 'its:initial technical. review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review'' Submit complete, accurate plans and documents. -, • Evi-a time mar be reyttlred /ar re-,stthntittuls as project applieanon retdeuers'n-ork on titicltiple,applications and it' muv he .cererul dms belie c iter can look hti vxur new or revised information. r ' Designate a specific contact 'person to communicate with the City. • lI'hile 1/ie person desigiwted as the applicant's contact person with the City' ccin he chunged,'one indirichiul -with the expertise for clea/ing,ti ith reviewer comments mould he the best choice for lhe,ennrere'ieu- process.,. Call staff regarding the status of your project only after the target date shown at the'top of the page. , Although rou should he contacted cin nr hr the target date, please,/cel Jive ur coiituc1 it (limn hareir't-/teard from us`• In; your targe! date. Staff may contact mu before the target date if the initial review is complete 131 Allowing this procedure. you will save tune and allow the re' viewers to complete the work marc expeditiously. • Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter' complete.: This means all of the, required documents, as indicated on youi Pre -Application Checklist hale been.submitted or -have been approved- for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. - 2. Quality Check. The next step in the process is a quality check to make' sure,thatthe application is reviewable and.free from substantive Claws that would prevent technical staff from coroplctiiig the technical review once itis started. When this step is complete, your application will be routedgto the appropriate staff and 'remain in their review queue until it conies up for review. 3. Technical Compliance. Once an application is administratively complete; it is routed to technical Staff for compliance review. Depending on the type of project, technical staff may include nniltiplc reviewers. You'shoiild be contacted by phone, fax, entail, or mail by your TARGET DATE once the initial technical compliance review is complete:. - 4. Permit Issuance. When'the technical compliance review of the application.ik complete, including -any subsequent re - submittals, each reviewer will approve their section of thc.application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application Lind contact the person specified on your application for permit pick-up. Information regarding fees and, pre -construction meetings (if required) will,be provided by the Permit Specialist at that bete. - . WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 .J2 /CC //l1i;+e/ L Zi).? 5 ./- g.ce/ *5 �►/• /J2 % r`— r. /7/eiG.1-6v /25 RECEIVED CSVPERMIT CENTER Project #V(`C. Name (Th Submittal #