Loading...
2009, 04-30 Permit App: 09001105 Repair, RemodelProjtct Number: 09001105 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/30/2009 Page 1 of 2 Project Information: Permit Use: REPAIR RAFTERS, SIDING, PATIO, WINDOW & ROOFING Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 000377 Name: CHESTER TERRACE OI ST ADD Contact: MR SERVICE INC Address: 728 N COOK ST C - S - Z: SPOKANE WA 99207 Phone: (509) 535-8801 Group Name: Project Name: District: Soul Parcel Number: 45291.1514 Block: SiteAddress: 2309 S HERALD RD Location:: CSV Lot: Owner: Name: SPRAGG, D W Address: 2309 S HERALD RD SPOKANE VALLEY, WA 99206-332 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (0): 50 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Permits • Released By: Originally Released: 4/29/2009 By: tmelbourn Contractor: MR SERVICE INC. Address: 728 N COOK ST SPOKANE, WA 99202 Description I&2 FAMILY Crp Type R-3 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW <7999 SQ FT Operator: jmm Building Permit Firm: MR. SERVICE INC Phone: (509) 535-8801 This Application: Notes Sq Ft Valuation REPAIRS 0 $25,000.00 Totals: 0 $25,000.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Printed By: ,ID Total Project: Sq Ft Valuation 0 $25,000.00 0 $25,000.00 Fee Amount 5391.25 $4.50 5156.50 Permit Total Fees: $552.25 Print Date: 4/30/2009 ' Project Number: 09001105 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/30/2009 Page 2 of 2 Notes: _ a Payment Summary: , Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $552.25 $552.25 $156.50 $395.75 $552.25 $552 25 $156.50 $395.75 Disclaimer: _ Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed fay: JD Print Date: 4/30/2009 Permit Center _ Y *lane 11703 E Sprague Ave,.Suite113 3!E0 VI - • *lane Spokane Valley, WAY9fApOKAN `%alley+ (509)688-0036 FZEO(89)688-003,7 2009 J www.spokanevallev.org ppR `. 0 Community Development 00M(j 1itNle� Residential Construction0 e-�w Construction Permit Application Or --7(—Addition/Remodel PERMIT NUMBER: PERMIT FEE: BY• H Other: Accessory Bldg Deck SITE ADDRESS: a w t S • I7 r,Q/ L_D 5po A,uc w / / XQ ASSESSORS PARCEL NO: LEGAL DESCRIPTION: ..�' .. BtiilditigOwner• x-: cpf��- { •i. . rt.�' f'�i`s--:. - . e i1.._..�•�d. c. .. A�. _. • i'ea : i.J:d...T�. F.0 :'S-.0. ... r. • Contractor_`..i<_.=.�---"—__-- , �.- X " �' - � L^i41 vnII'" . Name: D O Name: M2 sGCLV ZCI= Address: c 3Qr'l 5. geizACh Address: 72c- C 00 K Si - jCity: City: Spo'%'�r` State: I.vk ZtP^lo' o City: Spolociti.State: Ztp:`93=, Phone: Fax: Phone: 535—n0 I Fax: 5369— 7S/ a DECK/COV. PATIO SQ. FTG: Contractor Lac No: Exp Date: M2Sci+T ao7C3i /P wO kCOntact;PCCSOn,:;,..!;�;''„j;kn•:4 c-4,:,t5tc. ;�:.��'. �n.t,_�;��..,, � CONSTRUCTION TYPE: City Business Lic. No: SEWER OR SEPTIC? Name: T1 s -j< z T-2---- Phone: lia4,=5,5g"Q-I.,.... Describe the scope of work in detail: Cost of Project: $1 000 OK 57Q cyuQr (2EPA12 O 2AFr 2EP�E S��v PC -PA -2 Pnrw srz.icruze (2tOL.A� bkcl` i wl-+-aaou..)-3I 2 nta_ roc.. Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: DATE: Method of Payment:— 9 Cash ®/ eck 9 Mastercard 9 VISA Bankcard #: /// Expires: VIN#: Authorized Signatufe: REVISED 2/15107 • Spokane Valley® For City Use Only PLUS Project Number '» N g5 Project Address 6?.39 J. of 11703 E Sprague Ave Suite B-3 4:Spokane Valley WA 99206. ' 509.688.0036 • Fax: 509.688.0037 ♦ permttcenter@spokanevattey.org As part of. out on-going commitment to customer • service, during the review"process . of, your iiiojelct .application, we•are providing you ?with.a TARGET DATE for the initial technical application revie'w,.lf for any reason we cannot meet this -date; we will contact you with a revised target; date:; ' ' . Your application review TARGET DATE is ` 4//[7. The TARGET DATE is the date' we estimate your project application` willhave had its initial technical review. It is not the date for approval or'permit,issuande.' Tips for a Smoother Project Application:Review i Submit complete, accurate plans and documents,' :. au xi time Hary he required for re -submittals as project application reviewers work on mnitiple'applications'and it. may be several dans before they can lbok at your new or revised information i Designate a specific contact person to communicate with the City.. While the person designated as the applicant's contact person with the City can be changed, one individual ivith the expertise for dealing with reviewer comments would be the best choice forthe•entire review process.' Call staff regarding the status of your project only after the target date shown at the top of the pager Although von shoidd becontacted on -or by the target date, please feel free to contact us if you haven't heard from us , by your target date. Staff may contact you before the target date if the inittal review is complete.' By following this • procedure. you nil/ save time and allow the reviewers to complete the Work more expeditiously. ' • Steps in the Permit Process 1. Counter Complete. Your application has been accepted as.'counter complete. .This means all of the required{ documents, as indicated on"your Pre -Application Checklist have,been submitted or 'have, been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review, 2. Quality Check. The next step in the.process is a quality check to make:sure that.the application is ieviewableand free from substantive Flaws that would prevent technical staff from completing`the techhical'review once it is started. When this step is complete, your application will be routed tb the appropriate Staff 'and se -main in thejr,review queue until it comes up for review. 3. Technical Compliance. Once'an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project„technical staff may include. multiple reviewers. You should be coritacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance}eview,'is Complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it fo,the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07