2012, 04-23 Permit: SW-12001181 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
'4
Application Number: SW -12001181
Permit Issued Date:
04/23/2012
Expiration Date:
Project Description:
Permit Type:
SEWER CONNECTION
SEWER
Primary Contact: KEN'S D ROOTER INC
Applicant: KEN'S D ROOTER INC
Address:
Phone:
Email:
8215 E. NORA
SPOKANE, WA 99212
.509-999-3905
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision
Assessor's Description
Inspection Area:
Zoning:
13114 E HEROY AVE
45031.4305
TRENTWOOD
ORCHARDS
PT OF TRENTWOOD ORCH CLARKS SUB L5 B3
Owner:
Address
Phone:
Email
CARVALHO, KENNETH C & BELINDA A
13114 E HEROY AVE
SPOKANE, WA 99206
Water District: Trentwood Fire District: Fire District 1
Irrigation District #3
Land Area: 0.2392 acres / 10419 8 sqft
CONTRACTOR INFORMATION:
General Contractor
KENSDDR888DL
KEN'S D ROOTER INC
PO BOX 1024
MARYSVILLE, WA 98270
425-252-5874
DETAILS:
Class Type
Quantity Unit Charge
Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00
$125.00
Total Fee:
$125.00
$25.94
5125.00
S150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY
Date Printed: 04/23/2012 10:32:29
Printed by: IIS APPPOOLIASP.NET v4 0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001181 04/23/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER I5 TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES
Date Printed: 04/23/2012 10:32.29
Printed by. 115 APPPOOLXASP.NET v4.0