Loading...
2008, 05-27 Permit App: 08001941 Pole BldgProject Number: 08001941 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/27/2008 Page 1 of 2 Project Information: Permit Use: 29 x 35 POLE BLDG/SHOP Contact: BUNKER BUILDINGS Address: PO BOX 48287 C - S - Z: SPOKANE, WA 99208 Setbacks: Front Left: Right: Rear: Phone: (509) 468-8182 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Nort Parcel Number: 45031.4305 Block: Lot: SiteAddress: 13114 E HEROY AVE Location:: CSV Zoning: R-3 SF Res District Water District: 001 TRENTWOOD Owner: Name: CARVALHO, KENNETH C & BELI Address: 13114 E HEROY AVE SPOKANE VALLEY, WA 99206 Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 5/23/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 5/23/2008 By: kkendall Permits• Operator: jmm Printed By: JD Print Date: 5/27/2008 Project Number: 08001941 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/27/2008 Contractor: BUNKER BUILDINGS Address: 1028 W ROSEWOOD SPOKANE, WA Description Grp Type Notes POLE BDLG U -I VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Notes: Building Permit Page 2 of 2 Firm: BUNKER BUILDINGS Phone: (509) 468-8182 This Application: Total Project: Sq Ft Valuation Sci Ft Valuation 1,080 $20,520.00 1,080 $20,520.00 Totals: 1,080 $20,520.00 1,080 $20,520.00 Units Unit Desc I SELECT 1 SELECT I SELECT Permit Total Fees: Fee Amount $335.25 $83.81 $4.50 $423.56 The 29' x 35' detached structure shall be used for residential purposes only. Payment Summary: .. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $423.56 $423.56 $0.00 $423.56 $423.56 $423.56 $0.00 $423.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 5/27/2008 Spokane cesssgalley Community Development Yermjt center 11707 E Sprague Ave, Suite 106 Spokane Valley, WAr997 BY cy (509)688-00383FAX;,(509� g�'6fB�- v,ww.spokunevelley.ore cem ^OQp Residential Construction Permit Application BY; Ma Gage' PERMIT NUMBER: e-/9"2-/ / PERMIT FEE: onstruction %Accessory Bldg: o Addition/Remodel to Deck o Other: SITE ADDRESS /3//42/ 8' /40C1 ASSESSORS PARCEL NO: y. 3)' y503 LEGAL DESCRIPTION: Building Name: I a A_,, 1 ny I lii I Wac 1 tnt Address: , 0.ir i s :". . C� ''o//caner Name: /(e, r l I 1,0 Brlin Address: /a//y J lierjm FINISHED BASEMENT SQ. FTG: — City: SP,, 6,e, Un.l (c t zip: 59216 Phone: Clui' 37I`t. Fax: CONSTRUCTION TYPE: 0 Contact Person Name: Phone: D scribe the sc7 e of work in detail: Lalb sip Contractor. _ . _ ,, Name: I a A_,, 1 ny I lii I Wac 1 tnt Address: , 0.ir i s :". . C� In 4=1 MEI MAIN FLOOR TO SQ. FTG: Brlin City Business Lic No: / . 4lb Cost of Project: $j(. tgLU **************Tbe followine MUST be. lete: (write N/A if not applicable)********************** HEIGHT TO PEAK: ao DIMENSIONS:3y*3oX/if ic� 367x;20--1 # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: — GARAGE FTG: / c7 ^ DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: AA) _ # OF BEDROOMS: CONSTRUCTION TYPE: 0 HEAT SOURCE: SEWER OR SEPTIC? f ICttI AIM D The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property. owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be . ocessed. A‘rj' Signature Method of Pay ❑ Cash Bankcard #: (Faxed Authorized Signature: REVISED 8252005 Date 42//0e rmit applications will only be accepted with major bankcard) Check ❑ Mastercard 0 VISA Expires: VIN#: ❑ Other Spokane . ' 1\I,, ' Valley° 11703E Sprague Ave Suite B-3 �. Spokane Valley WA 99206 • 509.688.0036 t Fax: 509.688.0037 • permitcenter@spokanevalley.org For City Use Only PLUS Project Number r/ 9e/ /'`// Project Address ' /a// y -kvi As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date; we will contact you with a revised target date. • Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review " Submit complete, accurate plans and documents. Erin/ time nut- be required Jin- re -submittals its project application reviewers work un multiple applications and it, may he screral days before thew can look at your nem or revised information. Designate a specific contact person to communicate with the City. IVinle the person designates/ as the applicant's contact person with the City can he changed, one individual with the expertise for dealing with reviewer comments world be the hest choice for the entire review process: Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the tmget date. please feel free to contact us if you haven't heard from us by your target date. Staff may contact you helbre the target date if the initial review is complete. Bv.following this procedure. you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process I. Counter Complete. Your application has been accepted as' counter` complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Cheek. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started, When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it . comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, lax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and'route it to the Permit Center. When all sections of the application are received, a Permit Specialist. will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK -BUILDING FILE REV 9/07 Siji\mNm ai Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project ❑ Previous pre -app meeting ❑ Plan revisions D Transmittal Date: Friday, May 23, 2008 Site Address: 13114 E HEROY AVE Parcel Number: 45031.4305 Zoning: R-3 Water District: TRENTWOOD Fire District: FD 01 Project Number: 08001941 Applicant: BUNKER BUILDINGS Owner: CARVALHO, KENNETH C & BELIN PO BOX 48287 13114 E HEROY AVE SPOKANE, WA 99208 SPOKANE VALLEY, WA 99206 (509) 468-8182 e-mail: e-mail: Contact: BUNKER BUILDINGS Occupant: PO BOX 48287 SPOKANE, WA 99208 e-mail. (509) 468-8182 e-mail: Contractor: BUNKER BUILDINGS 1028 W ROSEWOOD SPOKANE, WA (509) 468-8182 Arch / Engineer: e-mail: Project 29 X 35 POLE BLDG/SHOP Description: Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION CONSTRUCTION PLANS SITE PLAN TDS Please send all plan review and project comments via e-mail to the highlighted individuals. PLAN ING - PT. APPROVED BY DATE. 114- EAN,2— k& q 3 i . q;u.S /'o , 51.5.33 1 fir"u_I /ia� 1311,4 6 • 59)Kµ— "sil 99)14