Loading...
2012, 05-29 Permit: SW-12001432 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001432 Permit Issued Date: 05/29/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION TRENTWOOD SEWER Primary Contact: CYCLOPS PIPE SERVICES, LLC. Applicant: CYCLOPS PIPE SERVICES, LLC. Address: Phone: Email: P.O. BOX 700 NINE MILE FALLS, WA 99026 509-413-9529 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: 13313 E HEROY AVE 45031.4502 LESLYE ADDITION LESLYE ADD LT 2 BLK 2 Owner: Address: 13313 E HEROY AVE SPOKANE, WA 99216-1293 Phone: FINNIGAN, ANDREW J & SALENA J Email: Water District: Trentwood Fire District: Fire District 1 Irrigation District 113 Zoning' Land Area: 0.2216 acres / 9654.12 sqft CONTRACTOR INFORMATION: General Contractor CYCLOPS924K9 CYCLOPS PIPE SERVICES, LLC. P.O. BOX 700 NINE MILE FALLS, WA 99026 509-413-9529 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed. 05/29/2012 10:46:29 Printed by. 118 APPPOOLWSP.NET v4 0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001432 05/29/2012 Expiration Date. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/29/2012 10'46'29 Printed by: IIS APPPOOL\ASP.NET v4 0