Loading...
2010, 05-19 Permit App: 10001359 Storage Bldg• Project Number: 10001359 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/19/2010 Page 1 of 2 Project Information: Permit Use: 20 X 28 X 10 STORAGE BUILDING Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 001645 Name: MISSION HILLS 01ST ADD Contact: SPOKANE POST FRAME Address: 7001 E 2ND C - S - Z: SPOKANE, WA 99212 Phone: (509) 926-0865 Group Name: Project Name: District: Nort Parcel Number: 45084.0807 Block: SiteAddress: 1715 N HERALD RD Lot: Owner: Name: EGGINTON, ROBERT D Address: 1715 N HERALD RD Location:: CSV SPOKANE VALLEY, WA 99206 Zoning: R-3 SF Res District Water District: 011 MODERN Area: 10,705 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 5/12/2010 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 5/18/2010 By: kkendall Operator: jmm Printed By: JD Print Date: 5/19/2010 Project Number: 10001359 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/19/2010 Page 2 of 2 Building Permit Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME Address: 7001 E 2ND AVE Phone: (509) 926-0865 SPOKANE, WA 99212 This Application: Total Project: Description Grp 'km Notes Sq Ft Valuation Sa Ft Valuation POLE BDLG U-1 VB PLAN 560 $10,640.00 560 $10,640.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 560 $10,640.00 560 $10,640.00 Units Unit Desc Fee Amount 1 SELECT $195.25 1 SELECT $48.81 1 SELECT $4.50 Permit Total Fees: $248.56 Notes: CSV Planning Division CONDITION:The 20' x 28" detached structure (Permit #10-001359) shall be restricted topersonal residential use. Any business use shall be prohibited until completion of a change of use and commercial review. Payment Summary: Permit Type Fee Amount Building Permit $248.56 $248.56 Invoice Amount $248.56 $248.56 Amount Paid $48.81 Amount Owing $199.75 $48.81 $199.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 5/19/2010 Perinit Center \ Scn . ;11703 E Spraguir Ave, Suite B-3 p0 ne Spokane Valley,\WA 99206 ��j� (509)688-0036al AX:(509)688-0037 �'J _ www.spokanevey.org -'< \ Community Developme�t, t'j Residential Cbjsiruction New Construction Permit Appfcion _j Addition/Remodel Deck Other: PERMIT NUMBER: (- f PERMIT FEE: Accessory Bldg SITE ADDRESS: (om- 1120e, ASSESSORS PARCEL NO 15© i PR— LEGAL DESCRIPTION: YKLAS t o N �ib (1 J / .> - 4) b o PP Building Owner: Name: 6 eexervscr3 ij Address: )913-141 91J141 ikei o 41 , City: s pdr*, .t _ _4 State: t yam Zip: ii 2t4 V""I L G Aa+`p'_ zi 23 G Fax: Contact Person Name: Phone: Describe the scope of work in detail: ° 2/6 t -S 1Th eter-6-e— Lei) Contractor: DIMENSIONS: go 1.-.. I. # OF STORIES: [ TOTAL HABITABLE SPACE: Name: ok'' - i_ As-% 1i - 2NFLOOR SQ. TG: Address: 7.00A 2 Atx, , GARAG ,:AO. F G: O City: SQ/',••y 30% SLOPES ON P TY: State: C Zip: `y_ Phone: q tr _ 0 y‘ SEWER SEPTIC? Fax: 72 Li .5-1 41 Contractor+callo -h_. s $ li Date: City Business Lic. No: Cost of Project: $ 55-60 Proposed Use: -- ' 1 ??'21-x•—� 'r" **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEA : PET DIMENSIONS: go 1.-.. I. # OF STORIES: [ TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG:` 2NFLOOR SQ. TG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: 8— GARAG ,:AO. F G: O DECK/COV. PATIO SQ. FTG: 30% SLOPES ON P TY: # OF BEDROOMS: L2— CONSTRUCTION TE: HEAT SOURCE: SEWER SEPTIC? S i The permitee verifies, acknowledges and agrees by heir ss nature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: a_ `,, Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 DATE: Check ❑ Mastercard ❑ VISA Expires: VIN#: Stiokane ,o•OValley® For City Use Only PLUS Project Number, ,3 ) Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Spokane POST FRAME May 17, 2010 nd A •s_ 11 12 City of Spokane Valley Building De.partnment 11703 E. Sprague Ave. Suite B-3 Spokane Valley, WA 99206 Attention: Karen. Kendall Karen, 1 am requesting a wavier regarding a concrete or asphalt driveway to my proposed 20' x 28' "storage building". I already have a compacted gravel approach on the north side of my property. and the building will be used to store my boat and 4 -wheeler. This building is not intended to be my primary garage, um.y llousc already liar ami attached one. Thank you for your attention to his matter. Sin�erely, Bob Eginton I 71 N. Herald Rd. Spokane Valley, WA. 99206 Phone 990-9239 RECEIVED CSV PERMIT CENTER MAY 1 8 Proiect # 10 rkrYne- Submittal # Office: 509-926-0865 Fax: 509-924-5161 www.spokanepostframe.com POST FRAME, INC. fpneered Pole Buildings 'n(1 A\ •._• • • \ 90: i R()LIFE IA ILI. Sales Manay2cr ()..% 71C1 509-926-0865 • Fax 509-924-5161 or 1-866-926-0865 Visit us at ‘vww.spokanepostframe.colll RECEIVED ecH PERMIT CENTER it.8flY 12 2»Q 0-- -I Project Submittal #_ flow eets/alley 0Owt-,,,!,1c/sewer/cfraInfleld 74)()W r!), sting buildings (how :posed building ,f 'hacks - front, r ear, sides 3013 NAME $o PIIOUEgib — ciZ37 ADDRESS tin=t-twect, bpok-ANicE_ lor\Lin t-oPt- /t) 24.t LEGAL DESCRIPTION Pito c_Ai. A5V- 1-15-06Lt - 0 80 -3 - 1(e) O'Jsi 1 f)9 iii)(ft _...1 vi f 4 7 CSV Planning Division CONDITION: \--The 20 x 28" detached structure (Permit #10-001359) shall be restricted topersonal residential use. Any business use shall be prohibited until completion of a change of use an - ommercial review. s' c;r)Esrty line - need f irewall and D3ret ,n7,er than 5' - need waiver- from nelutttor- • r ' "305 of rear 25' H • - yntist be 20' from property line • i; seit;,1 rom front property line ,311 ft 1 rom r-, ••,,klence - need firewall ,•••,mtirr '..rTJar e 209 - l0n of lot area (Must he less than 3.000 so f '.;r) that building is more than 105 of residua,' lot area • • • —Derty line - need firewall • f!eld rom cridence - need firewall 11BACK5 ARE SHOWN BELOW, WILL NEED TO CHECK CODE BOOK 15 KJr-)viVS14IT 201.i NG YOU'RE IN TO BE SUPE. MAXIMUM BUILDING SIZE 1- DIFFERENT ZONING. .HH,,!!!15•Ide setback !-ear 1 setback • . -'5 street setback - 25' from property line or 55' from r ;Ichever IS greater Sq-') PLANNI G T. A PROVED BY: DATE: r r t