14-180.03 Inland Asphalt: 2014 Stormwater Utility Small Works Projects r Z an'car 4011"1414%Illletri, iane ..iMi1V V 1 CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 14-051 DEPARTMENT OF PUBLIC WORKS PROJECT: SW Utility 2014 Small Works, Package 2 CHANGE ORDER NO: 3 CONTRACTOR: Inland Asphalt Company CONTRACT DATE: 9/22/2014 PROJECT NO: n/a DESCRIPTION OF CHANGES 1. Extension of quantities for asphalt. 2.For mitigation of an unknown stormwater structure in the excavation for the porous asphalt on Bowdish near 26th Ave. Time and materials to add pea gravel to the structure,removal of a broken concrete collar and grate, and cover with filter fabric. Item No Description Unit Quantity Unit Price Total 8 Extension of Quantities for Item 8, HMA @ Unit Bid Price SY 39 $57.00 $2,223.00 Time and Materials for Dealing with Unforeseen Structure LS 1 $691.92 $691.92 Total Amount of this Change Order: $2,914.92 SUBSTANTIAL COMPLETION Original Date: 11/12/2014 Prior to this Change Order. 4/14/2015 Including this Change Order: Original Working Days: 10 Working Days Added by this CO: 0 Working Days including this CO: 13 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $152,077.00 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $13,470.46 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $165,547.46 NET THIS CHANGE ORDER $2,914.92 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $168,462.38 CONTRACTOR ACCEPTANCE: I (`/� / ' DATE: al/Z4-//t The contractor hereby accepts this adjustme under terms of the original contract for all work perfomed. RECOMMENDED BY: / >�► DATE: 211-AUG 2015" Project Manager APPROVED BY: �!Zf�L/' ��1�iy 'I DATE: 2.`c /S "-- Ed Guth,Public Works Director APPROVED BY: Not Appticab1e DATE: NM Mike Jackson,City Manager ATTACHMENTS: PJ� Distribution: ORIGINALS TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor,PW Project File,Finance dept,City Manager //itzo14 SiYok° Works Department ane Public Stormwater Utility do•OValley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.688-0261 • cityhall@spokanevalley.org Change Order Memorandum Date: August 21, 2015 To: Eric Guth From: Art Jenkins, PE, CSM Re: Change Order#3 for SW Utility 204 Small Works, Package 2, Contract#14-051 Budget Account No. 402.402.000.595.40.63.00 Inland Asphalt Company, Inc., Contract 14- 051 1. Extension of quantities for asphalt(item no. 8). Quantities were measured on the Adams portion of the work that were higher than originally estimated by an additional 39 square yards. 2. For mitigation of an unknown stormwater structure in the excavation for the porous asphalt on Bowdish near 26th Ave. Time and materials to add pea gravel to the structure, removal of a broken concrete collar and grate, and cover with filter fabric. Total cost for this work was $691.92 and is below the $1,000 independent staff estimate. No additional working days will be granted as a result of this change order. There are sufficient funds in the project budget to cover this change order. Original Contract amount= $ 152,077.00 Previous Change Order Cost= $ 13,470.46 Change Order#3 Cost= $ 2,914.92 Project Cost including Change Order#3 = $ 168,462.38 15% of Original Contract amount= $ 22,811.55 Max Public Works Director Contract authority= $ 22,811.55 ($75,000 or 15%of original contract amount, whichever is less) Change Order Cost to date = $ 16,385.38 Remaining P.W. Director Contract Authority after CO #3 $ 6,426.17 cc: Finance Department Clerk's office