Loading...
2012, 09-07 Permit: SW-12002145 SewerSPOKANE COUNTY BUILDING AND PLANNING ti PERMIT - Application Number: SW -12002145 Permit Issued Date: 09/07/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION TRENTWOOD SEWER Primary Contact: GOBER'S LLC Applicant. GOBER'S LLC Address Phone: Email: 11215 ETRENT AVE SPOKANE, WA 99206 509-924-5372 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessors Description Inspection Area' Zoning: 13522 E HEROY AVE 45031.3601 VANDEVER SUBDIVISION VANDEVER SUB L1 B3 Owner: Address. Phone: Email FEDERAL NATIONAL MORTGAGE ASSOC PO BOX 650043 DALLAS, TX 75265-0043 Water District: Trentwood Fire District Spokane Valley Fire Irrigation District #3 Land Area: 11253 Square Feet CONTRACTOR INFORMATION: General Contractor GOBERL*899L7 GOBER'S LLC 11215E TRENT AVE SPOKANE, WA 99206 509-924-5372 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125 00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS• Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 09/07/2012 07 59'41 Printed by 115 APPPOOLIASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT " Permit Issued Date: Application Number: SW -12002145 09/07/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed. 09/07/2012 07'59:41 Pnnted by: IIS APPPOOLWSP.NET v4.0