2012, 05-10 Permit: SW-12001314 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001314
' Permit Issued Date:
05/10/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: TRENTWOOD
Permit Type: SEWER
Primary Contact: LARRY MILLER EXCAVATING
Applicant: LARRY MILLER EXCAVATING
Address- 7117 E RUTTER AVE
SPOKANE, WA 99212
Phone: 509-218-3335
Email:
SITE INFORMATION:
Site Address: 13806 E HEROY AVE Owner: CHILD LIVING TRUST, KENNETH D &
LILIANA
Parcel Number: 45031.4704 Address: 13806 E HEROY AVE
SPOKANE, WA 99216
Subdivision: TRENTWOOD Phone:
ORCHARDS
Assessor's Description: TRENTWOOD ORCHARDS TR A SP AP 92-11 Email:
PREVIOUSLY KNOWN AS TR A SP 91-732 BEING
A PTN OF BLKS 37 & 38
Inspection Area:
Water District: Trentwood Fire District: Fire District 1
Irrigation District #3
Zoning: Land Area: 0 24 acres
CONTRACTOR INFORMATION:
General Contractor
LARRYME918DR
LARRY MILLER EXCAVATING
7117 E RUTTER AVE
SPOKANE, WA 99212
509-532-9953
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 05/10/2012 14.59.45
Printed by: 113 APPPOOL\ASP NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001314 05/10/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/10/2012 14:59:45
Printed by. IIS APPPOOLIASP.NET v4.0