Loading...
2012, 07-25 Permit: SW-12001833 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001833 Permit Issued Date: 07/25/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: COMAN CONSTRUCTION Applicant: COMAN CONSTRUCTION Permit Type: SEWER Address: 4820 S WOODRUFF RD SPOKANE VALLEY, WA 99206 Phone: 208-640-0282 Email: SITE INFORMATION: Site Address: 421 S HERALD RD Owner: SUTHERLAND, M J Parcel Number: 45201.2015 Address: 421 S HERALD RD SPOKANE, WA 99206-6907 Subdivision: JOHNSON'S Phone: SUBDIVISION Assessor's Description: OPP JOHNSTONS SUB B235 L4 B1 Email: Inspection Area: Water District: Modern Fire District: Spokane Valley Fire Electric Water Company Zoning: Land Area: 10240 Square Feet CONTRACTOR INFORMATION: General Contractor COMANC19530B COMAN CONSTRUCTION INC 4820 S WOODRUFF SPOKANE, WA 99206 509-953-0904 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 07/25/2012 09:45:35 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001833 07/25/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/25/2012 09:45:35 Printed by: IIS APPPOOL\ASP.NET v4.0