2012, 05-02 Permit: SW-12001264 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001264
Permit Issued Date:
05/02/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
TRENTWOOD ORCHARDS
SEWER
Primary Contact: KEN'S D ROOTER INC
Applicant: KEN'S D ROOTER INC
Address:
Phone:
Email
PO BOX 1024
MARYSVILLE, WA 98270
425-252-5874
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning:
14906 E HEROY
45021.1805
TRENTWOOD
ORCHARDS
TRENTWOOD ORCHARD TR A OF SP 78-026A
BEING A PTN OF 51/ 2 OF BLK 12 7811300280
Owner:
Address:
Phone:
Email:
MCCONAHY, GEORGE H & MARILYN F
14906 E HEROY LN
SPOKANE, WA 99216-1322
Water District: Trentwood Fire District: Fire District 1
Irrigation District #3
Land Area: 0.3197 acres / 13928 sqft
CONTRACTOR INFORMATION:
General Contractor
KENSDDR888DL
KEN'S D ROOTER INC
PO BOX 1024
MARYSVILLE, WA 98270
425-252-5874
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 05/02/2012 12:1413
Printed by' IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
r
Permit lssued Date:
Application Number: SW -12001264 05/02/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed 05/02/2012 12:14:13
Printed by. 115 APPPOOLWSP.NET v4.0