Loading...
2007, 12-21 Permit App: 07004932 RemodelProject Number: 07004932 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/21/2007 Page 1 of 2 Project Information: AMAPSMOMMA:MEMESSAMPAP. SPAPM.SAMAPAAM AMMAAM Permit Use: REMODEL BATHROOM Contact: HANDYMAN CONNECTION Address: 8123 E SPRAGUE AVE C - S - Z: SPOKANE VALLEY, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 922-7374 Group Name: Site Information: Project Name: 0E4UM'".M .b s ... :ani+40004,47=4440M. Plat Key: Name: Range District: Sout Parcel Number: 45193.0307 Block: SiteAddress: 1202 S HIGHLAND DR Location:: CSV Zoning: UR -3.5 Urban Residential 3.5 Water District: 020 EAST SPOKANE Area: 16,100 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information Review Building Plan Review Permits: Lot: Owner: Name: RIVAS, DAVID & GAIL F Address: 1202 S HIGHLAND DR SPOKANE VALLEY, WA 99212 - Hold: ❑ Depth: 0 Right Of Way (ft): 0 Released By: Originally Released: 12/21/2007 By: tmelbourn AMPAPAPAPAPPA AP P074444AMA004004444140AMSAMPA. w PAPAPAPPAS PAAPPM Building Permit Contractor: HANDYMAN CONNECTION Address: 8123 E SPRAGUE AVE SPOKANE VALLEY, WA 99212 PAPP Firm: HANDYMAN CONNECTION Phone: (509) 922-7374 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Su Ft Valuation 1&2 FAMILY R-3 VB BATHROO 0 $6,000.00 0 $6,000.00 M REMODEL Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $6,000.00 0 $6,000.00 Units Unit Desc Fee Amount 1 SELECT $125.25 1 SELECT $4.50 1 SELECT $50.10 Operator: jmm Printed By: jmm Permit Total Fees: $179.85 Print Date: 12/21/2007 Project Number: 07004932 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/21/2007 Page 2 of 2 Plumbing Permit Contractor: HANDYMAN CONNECTION Firm: HANDYMAN CONNECTION Address: 8123 E SPRAGUE AVE Phone: (509) 922-7374 SPOKANE VALLEY, WA 99212 Item Description TOILETSBIDETS SINKS TUBS Notes: Units Unit Desc 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF Permit Total Fees: Fee Amount $6.00 $6.00 $ 6.00 $18.00 CONTOL AREA FOR DRAINAGE MORITORIUM SEE MAPS FOR SPECIFICS Payment Summary_x....�_ .�� �. ..a.w.o:ure .. ��. _,VOSZISRx Permit Type Building Permit Plumbing Permit Fee Amount $179.85 $18.00 Invoice Amount $179.85 $18.00 Amount Paid Amount Owing $0.00 $179.85 $0.00 $18.00 $197.85 $197.85 $0.00 $197.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 12/21/2007 Spokane Val Iey Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting fl Plan revisions Ei Transmittal Date: Thursday, December 20, 2007 Site Address: 1202 S HIGHLAND DR Parcel Number: 45193.0307 Zoning: UR -3.5 Fire District: FD 01 Project Number: 07004932 Water District: EAST SPOKANE Applicant: e-mail: Contact: e-mail: Contractor: HANDYMAN CONNECTION 8123 E SPRAGUE AVE SPOKANE VALLEY, WA 99212 (509) 922-7374 HANDYMAN CONNECTION 8123 E SPRAGUE AVE SPOKANE VALLEY, WA 99212 (509) 922-7374 HANDYMAN CONNECTION 8123 E SPRAGUE AVE SPOKANE VALLEY, WA 99212 (509) 922-7374 Owner: RIVAS, DAVID & GAIL F 1202 S HIGHLAND DR SPOKANE VALLEY, WA 99212- e -mail: Occupant: e-mail: Arch / Engineer: e-mail: 2007 D (c Project REMODEL BATHROOM Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO CONSTRUCTION PLAN s. TD S Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you wit a revised target date. I� Illy Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07