2007, 12-21 Permit App: 07004932 RemodelProject Number: 07004932 Inv: 1 Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/21/2007 Page 1 of 2
Project Information:
AMAPSMOMMA:MEMESSAMPAP. SPAPM.SAMAPAAM AMMAAM
Permit Use: REMODEL BATHROOM Contact: HANDYMAN CONNECTION
Address: 8123 E SPRAGUE AVE
C - S - Z: SPOKANE VALLEY, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 922-7374
Group Name:
Site Information: Project Name:
0E4UM'".M .b s ... :ani+40004,47=4440M.
Plat Key: Name: Range
District: Sout
Parcel Number: 45193.0307
Block:
SiteAddress: 1202 S HIGHLAND DR
Location:: CSV
Zoning: UR -3.5 Urban Residential 3.5
Water District: 020 EAST SPOKANE
Area: 16,100 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information
Review
Building Plan Review
Permits:
Lot:
Owner: Name: RIVAS, DAVID & GAIL F
Address: 1202 S HIGHLAND DR
SPOKANE VALLEY, WA 99212 -
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Released By:
Originally Released: 12/21/2007 By: tmelbourn
AMPAPAPAPAPPA AP P074444AMA004004444140AMSAMPA. w PAPAPAPPAS PAAPPM
Building Permit
Contractor: HANDYMAN CONNECTION
Address: 8123 E SPRAGUE AVE
SPOKANE VALLEY, WA 99212
PAPP
Firm: HANDYMAN CONNECTION
Phone: (509) 922-7374
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Su Ft Valuation
1&2 FAMILY R-3 VB BATHROO 0 $6,000.00 0 $6,000.00
M
REMODEL
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $6,000.00 0 $6,000.00
Units Unit Desc Fee Amount
1 SELECT $125.25
1 SELECT $4.50
1 SELECT $50.10
Operator: jmm Printed By: jmm
Permit Total Fees: $179.85
Print Date: 12/21/2007
Project Number: 07004932 Inv: 1 Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/21/2007 Page 2 of 2
Plumbing Permit
Contractor: HANDYMAN CONNECTION Firm: HANDYMAN CONNECTION
Address: 8123 E SPRAGUE AVE Phone: (509) 922-7374
SPOKANE VALLEY, WA 99212
Item Description
TOILETSBIDETS
SINKS
TUBS
Notes:
Units Unit Desc
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
Permit Total Fees:
Fee Amount
$6.00
$6.00
$ 6.00
$18.00
CONTOL AREA FOR DRAINAGE MORITORIUM SEE MAPS FOR SPECIFICS
Payment Summary_x....�_ .�� �. ..a.w.o:ure .. ��. _,VOSZISRx
Permit Type
Building Permit
Plumbing Permit
Fee Amount
$179.85
$18.00
Invoice Amount
$179.85
$18.00
Amount Paid Amount Owing
$0.00 $179.85
$0.00 $18.00
$197.85 $197.85 $0.00 $197.85
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 12/21/2007
Spokane
Val Iey
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project
Previous pre -app meeting fl
Plan revisions Ei
Transmittal Date:
Thursday, December 20, 2007
Site Address: 1202 S HIGHLAND DR
Parcel Number: 45193.0307
Zoning: UR -3.5
Fire District: FD 01
Project Number: 07004932
Water District: EAST SPOKANE
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
HANDYMAN CONNECTION
8123 E SPRAGUE AVE
SPOKANE VALLEY, WA 99212
(509) 922-7374
HANDYMAN CONNECTION
8123 E SPRAGUE AVE
SPOKANE VALLEY, WA 99212
(509) 922-7374
HANDYMAN CONNECTION
8123 E SPRAGUE AVE
SPOKANE VALLEY, WA 99212
(509) 922-7374
Owner: RIVAS, DAVID & GAIL F
1202 S HIGHLAND DR
SPOKANE VALLEY, WA 99212-
e -mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
2007
D (c
Project REMODEL BATHROOM
Description:
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
CONSTRUCTION PLAN
s.
TD
S
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
Valley®
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you wit a revised target date.
I�
Illy
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK - BUILDING FILE
REV 9/07