Loading...
2014, 04-02 Permit: SW-14000300 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000300 Permit Issued Date: 04/02/2014 Expiration Date: 04/02/2015 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION LONE TREE ADDITION LAUER EXCAVATION & CONST 509-981-7954 Applicant: LAUER EXCAVATION & CONST Address: Phone: Email: PO BOX 11581 SPOKANE VALLEY, WA 99211 509-981-7954 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 214 N HODGES RD 55173.1107 GUTHRIES VLY VW 5TH L7 B1 :(509)-477-3675 Owner: Address: Phone: Email: Water District: Consolidated Irrigation District #19 COLLINS, DARLENE L 214 N HODGES RD SPOKANE VALLEY, WA 99016 Fire District: Spokane Valley Fire Land Area: 9600 Square Feet CONTRACTOR INFORMATION: LAUEREC931DA, Exp. 03/01/2015 LAUER EXCAVATION & CONST PO BOX 11581 SPOKANE VALLEY, WA 99211 509-981-7954 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Possible FEMA Flood Zone Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Possible Floodplain Possible Shoreline On Site CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 04/02/2014 14:11:46 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000300 Permit Issued Date: 04/02/2014 Expiration Date: 04/02/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/02/2014 14:11:46 Project Coordinator: Dawn Dompier