APPROACH PERMIT/APPLICATION
PROJECT ADDRESS: 303 4 /'l'dq
START DATE: to - - v ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME:
MAILING ADDRESS:
CITY:
STATE: ZIP:
CONTACT PERSON NAME:
PHONE:
FAX: CELL:
CONTRACTOR NAME:
7-0/
E- XI/de?
MAILING ADDRESS: Pc $
CITY: ./U,�u.)/ 1 `-dl
STATE: tc)�
ZIP: 7PO2
PHONE: 21_4e202 -g3 FAX: Z23 CELL: 13 / 3
CONTRACTOR LICENSE No.: fr 4Gio c_ its jt EXPIRES: ?' '/0 -) Z CITY BUSINESS LICENSE NO.: .6'0 p 5e/c/
PROJECT DESCRIPTION (Please Provide Site Sketch)
Residential Driveway An� y�U c i Commercial/Industrial Driveway
Existing Curb & Gutter 0 Rural Road Section
Culvert Installation 0 Sidewalk Repair/Construction
Q Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature _,�ji�e
Date: /O. 2 -
Updated 1-11-11
http://www.spokanevalley.org/filestorage/124/938/210/948/ 1496/Approach_Permit_1-11-11.doc
Page 1 of 1
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
O Sidewalk
ft wide
ft from back of curb
O Streetside Swale
O Drainage Ditch
O Drywell (show location on sketch)
O Other (please describe below)
•
wl
z
0!
CC
CLi
CURB
zfi
1
w
z,
w
of
aI
a;
EDGE OF
ASPHALT
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
Li FT (SEE TABLE)
CONCRETE
APPROACH
4' -4 ----THROAT WIDTH I2- FT -4'
WIN (SEE TABLE) WING
STREET NAME
e5
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
r e vi -7 b V e
Gl
Iee e e
CURB
RETURN
`1
IF CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
I ---THROAT WIDTH n FT ---1
(SEE TABLE)
STREET NAME
RADIUS
RETURN
STREET WITH ASPHALT EDGE
NIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
OFT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check aII existing conditions that apply:
❑ Sidewalk
ft wide
ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
❑ Other (please describe below)
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT ORRIGHT SIDE)
Li FT (SEE TABLE)
CONCRETE
APPROACH
t yi al/ e-
a
a
CURB
RETURN
CURB'
�- 4'--I--THROAT WIDTH Z- FT -4-4'
WING (SEE TABLE) WING
,yg ` /8
STREET NAME
EDGE OF J
ASPHALT
P5
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
`IF CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
I --THROAT WIDTH1-1 FT' --I
(SEE TABLE)
STREET NAM E
STREET WITH ASPHALT EDGE
RADIUS
RETURN
NIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
Q FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
In City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
RECEIVED �7
OCT 26 2011
Development Engineering
I Spokane Valley Permit et Center
11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org
Approach Permit Application Review
TO: Building Department
Site Address: 303 N. Hodges Rd.
Project No: 11-3393
Reviewed By:
Accepted
Not Accepted
Approach
X
Building Location
Paved Access
Notes: Saw cutting of existing curb to create an approach is not allowed
within the City's jurisdiction. Driveway is to be inspected by the City's
ROW Inspector prior to concrete placement.
Reviewed By:
Spokane
Valleyk
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permltcenter@sookanevaIlev.orq
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: 303 y go4105
START DATE: l0 •- Z7 - ANTICIP'ATED COMPLETION DATE:
BUILDING OWNER NAME:
MAILING ADDRESS:
CITY:
STATE: ZIP:
CONTACT PERSON NAME:
PHONE:
FAX: CELL:
CONTRACTOR NAME: fi^,n j r6yorie py
Or
MAILING ADDRESS: �, ) J E- ,X'?/ '9
CITY: A.4.46,0,#92 4
STATE: 'LtJet
ZIp: 9,7 0
PHONE: 2 4p07-03 FAX: ZZ['
CELL: 13 / J 3
CONTRACTOR LICENSE No.: Ty r Gt_C /eo/ pE EXPIRES: , /O•-) Z. CITY BUSINESS LICENSE NO.: Z04003°14/ h ?
PROJECT DESCRIPTION (Please Provide Site Sketch)
Residential Driveway Arc, ray c � El Commercial/industrial Driveway
Existing Curb & Gutter El Rural Road Section
'74
e.
Culvert Installation El Sidewalk Repalr/Construction
Ei Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center, 5) The City of
Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date: /0-
Updated
0
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit 1-11-11.doc
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and Include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
ft from back of curb
o Streetside Swale
D Drainage Ditch
❑
Drywell (show location on sketch)
❑ Other (please describe below)
-'A
DISTANCE FROM
NEAREST PROPERTY LINE
AY BE LEFT OR RIOHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
CURB
z
0
I--4'------THROATWDTHFT—-t--4'--�
7P(SEETABLE) WINOy
STREET NAME
EDGE OF _/
ASPHALT
L/oele-S
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
AY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
---THROATWiDTH FT --
(SEE TAB
STREET NAME
„en -love
ak1
iefleee
71?IETURN
IF CORNER LOT,
DISTANCE FROM
RETURN
FT (SEE TABLE)
15' RADIUS
STREET WITH ASPHALT EDGE
RADIUS
RETURN
-s,„
I
IF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
OFT (SEE TABLE)
•
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
.
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
In City Street Standards
Throat Width (flat portion) •
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(C) r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'