Loading...
2011, 05-11 Permit App: 11001245 Garage, ShopProject Number. 11001245 Inv. 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/11/2011 Page 1 of 2 Project Information: Permit Use: NEW 30 X 40 POST FRAME DETACHED Contact: BUNKER STEEL BLDGS INC GARAGE/SHOP Address: 1028 W ROSEWOOD AVE C - S - Z: SPOKANE WA 99208 Setbacks: Front Left: Right: Rear: Phone: (509) 468-8182 Group Name: Site Information: Project Name: Plat Key: 002847 Name: WELLESLEY MANOR 01ST ADD District: East Parcel Number: 45012.2417 Block: Lot: SiteAddress: 16123 E HEROY AVE Location:: CSV Zoning: R-3 SF Res District Water District: Area 16,120 Sq Ft Nbr of Bldgs: 0 Review Information: Owner: Name: LONGSHORE, S S & HOBART, D Address: 16123 E HEROY AVE SPOKANE VALLEY, WA 99216-159 Hold: ❑ Width: 104 Depth: 160 Right Of Way (ft): 0 Nbr of Dwellings: 1 Review Building Plan Review Released By: - - Originally Released: 5/10/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 5/11/2011 By: tschmidt Permits: Operator: jmm Printed By: JD Print Date: 5/11/2011 Project Number: 11001245 Inv: 1 Application THIS IS NOTA PERMIT Penalties will be assessed for commencing work without a permit Date: 5/11/2011 Page 2 of 2 Building Permit Contractor: BUNKER STEEL BUILDINGS Firm: BUNKER STEEL BUILDINGS Address: 1028 W ROSEWOOD Phone: (509) 468-8182 SPOKANE, WA This Application: Total Project: Description GCp Type Notes Sq Ft Valuation Su Ft Valuation POLE BDLG U-1 VB PLAN 1,200 $22,800.00 1,200 $22,800.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 1,200 $22,800.00 1,200 $22,800.00 Units Unit Desc Fee Amount 1 SELECT $363.25 1 SELECT $90.81 1 SELECT $4.50 Permit Total Fees: $458.56 Notes: , Pursuant to SVMC 19.40.020(8) All residential driveways and off-street parking areas shall be paved with asphalt... or other equivalent hard surface material. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $458.56 $458.56 Amount Paid $0.00 Amount Owing $458.56 $458.56 $458.56 $0.00 $458.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not he construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 5/11/2011 City of Spokane Valley Building Dept Receipt Receipt Number: 26768 Customer Number Proiects Miscellaneous Items Tender Full Project Nbr Inv Nbr Fee Amt Inv Amt Owing PAID Pmt 11001245 1 $458.56 $458.56 $458.56 $90.81 ❑ Total: $458.56 $458.56 $458.56 $90.81 Total PAID: $90.81 Type Check Acct Balance CC Nbr Exp Date TENDERED Checkl 11245 90.81 Payer: ,BUNKER STEEL BLDGS INC Total TENDERED: 90.81 Over / (Short) $0.00 Change $0.00 Notes: Tran Date / Time: 05/11/2011 11:30:52 AM By: HMORRIS Logon User: BldgCounter Station: CX SV00014A Override By: Printed: 05/11/2011 11:30:53 AM Page 1 of 1 CfrY OF "'� S haaneegis# Valley –Gommunity',Deye p en)Departm .e. -----an Perc t j nt'er` 9 V C. 117033 Last SpraaguF Averkuee uite -3 pdk Sahe•ValleVII WA''�9C206"y Tel: (509? 720-24Qr t1 Fax: (5QQ)158�8fni _}_I} perm itcenterialspICa 4411 .orq 13110}(10t13110}(10t #_, —M Nem (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTI ^O1 STRL CTION PERMIT`APPLICATION NEW CONSTRUCTION E DECK #: ADDITION/REMODEL ACCESSORY BUILDING OTHER SITE ADDRESS: E I b IL-3 Nervy ASSESSORS PARCEL NO.: 450 17 LEGAL DESCRIPTION: BUILDING OWNER NAME: Sieve- L0 SL,ar'= NAME: Sa r.nQ ADDRESS: S"•`A"C CITY: 5 1 kaa Vo. tttu PHONE: STATE: W A ZIP: FAX: CELL: 447 / - J J 114 CONTACT NAME: PHONE: FAX: CELL: CONTRACTOR NAME: A L,v-.e� l>tisS MAILING ADDRESS: 102$ li . � A'Sz wat& A1/4.e. CITY: SW PHONE! FAX: STATE: t..b--A l ZIP: t p Q CELL: 153- V 30 CITY BUSINESS LICENSE NO.: (�o21-t5.13 CONTRACTOR LICENSE No.: g•"'s'O 5&t EXPIRES: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: E ect- 30 tia x to' Pos-k fro—co tnaccirk4 C-zP-rQ,y-/S .Q ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT AP Height to Peak: (5 Dimensions: 33 'C 4.10 No. of Stories: I Total Habitable _ Space: Main Floor SQ FT:__ Upper Floor SQ FT: _ Unfinished Basement SQ FT: — Finished Basement SQ FT: Garage SQ FT: PDC 0I( Deck/Covered Patio SQ FT: Impervious Surface Area: — 30% Slopes on Property: •Nv No. of Bedrooms:— 0 Construction Type: Heat Source: � )o r' Sewer r Septic: TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their si!nature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City" •" Sp.dkane Valley permit inure to the property owner 3) The signatory is the property owner or has permission to represent the properb(ow -r in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Develop ent code. Referent co• -s are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit 1. not a p- it or ap. oval •r any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be reg • fired to, a submitt-. and bsequently approved before this application can be processed. Signature /) Date:IS 5 - Updated 1-11-11 \\Bunkerserver\sold jobs on server\PERMITING INFO\Spokane Valley permit application.doc Page 1 of 1 Spokane Valley° For City Use NOnly�- PLUS Project umber // /2( /' 'C Project Address /.(c•-)42 '� -Z-0-7 • 11703 E Sprague Ave Suite B':3 ♦ Spokane ValleyWA 99206 I, • ' ' 509.688.0036 ♦ Fak: 509.688.0037 Vpermitcenter@spokanevalley.org As part-of'our on-going 'commitment. to customer 'service during ,the -:review' proccss••of,your' project, application; we'are providing you with a TARGET DATE .for the'initial technical application review. lf•for any, reason we cannot' meet this'date,cwe will contact you with a revised target -date,:, . Your application review TARGET DATE is ' 0�' 1 ''i i \ : '.0 .nth The TARGET DATE is• the date we; estimate 'your, project applicatiori will have 'had' its initial technical'. •review. if is not the date for approval ortpermitissuance. • • • 'Pips for a Smoother Project Application RetieW .Submit complete, accurate plans and documents. • Extra time men- he required,/or re -submittals as prujec9 egiplicalion r•evicueri. 'ark On multiple' nppliiations nr7d i!. may be scree -al darnsbe/ore'thel' 0011 /ook at aur nets or' re vis ed infarm6Non: i Designate a specific 'contact person to communicate with the City. While the person desigdmed ar the dppliccrn! :r contact person mltli the',Citr `cair he changed,`oi71. irrclii ichrcd ,raja the expertise for dealing lilt/] revreirer comments n'aul/[1 he the hest choice %ar. die eillire rC Vietr. pi oa.s i.' ., Call staff regarding the status of your, project only after the target date shown at:tlie'top of the page,:.. Although you should be contacted on or by the targel, date. please, fee/ /, ce; lo'conlact tis i/.vou:haren't,heai d from us hr roar target date. Staff mai, '*contact you before the large! date tf the. initial review is complete. By, ./ollniring: this. procedure..rou will save.there and allotr the reviewers to complete'!he work -Mole expeditiiul5/5 • Steps in the Permit Process 1. Counter Complete: Your application has been accepted as counter colmplete. This means,alt of 'the required documents, as indicated on your Pre=Application Checklist have been subrniticd: or. hasc' been approved for' deferred submittal. This does not prevent technical -staff tion? rcqucsting;additional information a§a result of their technical review. 2. Quality Check, The next step in the process is:a quality check to;inake sure that the application, is revicwable,arid free ' from substantive flaws that would present techni'eal •staff from completing -the technical-revievonce it,is'started. When •, this step is complete, your application. will be routed to the -appropriate staff11nd remain in their'review:queue until it • comes up for review.' 3. Technical Compliance. Once an application is administiatively'complete, it is looted to technical staff for compliance review. Depending on the type of project; technical staff may include rnultiple reviewers.' You should be' contacted by phone. fax, email, or mail byyour TARGET DATE once the initial technical compliance reviejv is complete.... • • 4. Permit Issuance. When the technical' compliance review of the application is.complete,' including any subsequent 're- submittals, each reviewer will•approve their section of the application and route it to the Permit•Center. When all sections • of the application are received, a 'Permit Specialist will process the -application and coin:let the person specified on your application for permit pick -tip: Information regarding fees and pre:construction meetings (if required) Will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 C Ib(23 �oy G k SIA c4WL VA-rtLL, # - 4 50 i .x-14) PLANNING DEPT. APPROVED BY: DATE: 5 �r t ? a -o a -D 0)1�. (C /D (D CD (1) 11- CT r a •� C v n) to �T A iva� O o a< =-Oo < In cD » a, p c -'D co c.mv < a N N CD n O da (03 a.»a to c0 m (D Gu, N . �o CD n n = �. ID 5' r• 1•' yo x 23 Fx V1,5 4 SH Ep C.6 -51l 4gc6x.3t� 741 RECEI CSV PERM%T MAY 1Q Project # Name i Submi ai 1 41 \` j IED CENTER ?,911