HomeMy WebLinkAbout2013, 02-21 Permit: SW-13000100 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -13000100
Permit Issued Date:
02/21/2013
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
WELLESLEY MANOR
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
COURCHAINE EXCAVATION
COURCHAINE EXCAVATION
19818 E SPRAGUE
GREENACRES, WA 99016
509-928-0846
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning:
16705 E HEROY AVE
45011.1301
SUNNYVALE ACRES
SUNNYVALE ACRES LT 1 B2
Water District:
Consolidated Irrigation
District #19
Owner:
Address: 16705 E HEROY AVE
SPOKANE, WA99216-1510
Phone:
Email:
SKINNER, A C & T
Fire District: Spokane Valley Fire
Land Area: 44250 Square Feet
CONTRACTOR INFORMATION:
General Contractor
COURCC*181 R7
COURCHAINE EXCAVATION
19818 E SPRAGUE
GREENACRES, WA 99016
509-928-0846
DETAILS'
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$26.32
$125.00
$151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Pnnted: 02/21/2013 11:05:10
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -13000100 02/21/2013
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed 02/21/2013 11:05 10 Printed by IIS APPPOOL\SmartGovProdApp