2008, 01-15 Permit App: 08000104 Patio RoofProject Number: 08000104 Inv: 1
Application
Date: 1/15/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW PATIO ROOF ATTACHED TO HOUSE Contact: MELAAS, C R & B J
Address: 16714 E HEROY AVE
C - S - Z: SPOKANE VALLEY, WA 99216-1580
Setbacks: Front Left: Right: Rear: Phone: (509) 924-7889
Group Name:
Site Information: Project Name:
Plat Key: 003345 Name: SUNNYVALE ACRES District: East
Parcel Number: 45011.1202
Block: Lot:
SiteAddress: 16714 E HEROY AVE Owner: Name: MELAAS, C R & B J
Address: 16714 E HEROY AVE
SPOKANE VALLEY, WA 99216-15
Location:: CSV
Zoning: UR -3.5 Urban Residential 3.5
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 43,604 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 50
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 1/10/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits -
Released. By:
Originally Released: 1/14/2008 By: tschmidt
Operator: jmm Printed By: JD
Print Date: 1/15/2008
Project Number: 08000104
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 1/15/2008 Page 2 of 2
Contractor: OWNER
Description Grp Type Notes
1&2 FAMILY R-3 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW <7999 SQ FT
Building Permit
Firm: OWNER
Phone:
(000) 000-0000
This Application:
Sq Ft Valuation
400 $37,996.00
Totals: 400 $37,996.00
Units Unit Desc
1 SELECT
1 SELECT
I SELECT
Permit Total Fees:
Total Project:
Sq Ft Valuation
400 $37,996.00
400 $37,996.00
Fee Amount
$522.55
$4.50
$209.02
$736.07
Notes: ,
Foment Summar,: ,
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$736.07 $736.07 $0.00 $736.07 '
$736.07 $736.07 $0.00 $736.07
Disclaimer: . .
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD Print Date: 1/15/2008
Permit Center
Sor 11703 E Sprague Ave, Suite B-3
pcmokane Spokane Valley, WA 99206
44000 Valley.
()-003 g�
7ley509688 O www.spokane. GB " NEY
Community Development ,1 o 2DQB
Residential Construction IAN 7New Construction Accessory Bldg
Permit Application rfidition/Remodel IMITCENl� 111Deck
�Y ❑ Other:
PERMIT NUMBER :Q'-0/04
PERMIT FEE:
16711-f F HP4C)/
ASSESSORS PARCEL NO: 9Th //d 1g D a LEGAL DESCRIPTION: S r 717 &Yl/n �� a c4.QS La 61
SITE ADDRESS:
BuildiriOwner: ; _ -. - - c
ii aux __7. . h' s . f . '�.e
'Name:
Cointractoi` t` ° • _ _- - - `: - �£ _ .x t -i4� �
- AVE.",s , - x _ _ .'1= t_+' t
0 I/ L(/f /-P S / -7/)i P /rn lY C
Name: . SCS W1/4 -r2 /
Address: / / .7/,,,_ #� y`
Address:
City:5Ojd%%yam //4-7 State' s Zip s/L
City: State: Zip:
Phone:re, 9 9a q 7 c9 Fax: S.by S36 a,a
Phone: Fax: -
GARAGE SQ. FTG:
d L�
Contractor Lic No: Exp Date:
`.Cohtact.P¢rsoii ,z `•;.}-'/":.:4t'4�;``�:
# OF BEDROOMS:
VI __
City Business Lic. No:
it
SEWER OR SEPTIC/
4
//(�J,RCE:
n ."sem
Name: e /I or f -G/%P t S
Phone: Ca// '/7S AWa. —,%'-- %z'#7fgv
Describe the scope of work in detail:
Cost of Project: $
asro
6)a -1-17) Rc a9c °e,1 A4 -4.0P
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/a
DIMENSIONS:
hz-c\_--
# OF STORIES:
rn.4
TOTAL HABITABLE SPACE:
tit cc
MAIN -FLOOR TO SQ.
FTG: /it
2NU FLOOR SQ. FTG:
n
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA: ��
FINISHED BASEMENT
SQ. FTG: rl GFa�
GARAGE SQ. FTG:
d L�
DECK/COV. O SQ. FTG:
30%SLOPES ON
PROPERTY: J /L
# OF BEDROOMS:
VI __
CONSTRUCTION TYPE:
AU O d d.
H
SEWER OR SEPTIC/
4
//(�J,RCE:
n ."sem
-`
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordipences. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application ca
SIGNATUR
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
I DATE:
❑ Mastercard
Expires:
I —/®-6ce
❑ VISA
VIN#:
Spokane
Valley®
For City Use Only //
PLUS Project Number W—p /0e
Project Address I607/Cif �(er
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
024/0 /0 () -
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents.
Erna time May be required for re -submittals as project application reviewers work out multiple applications and d
may he several days before they can look at roar new or revised information.
➢ Designate a specific contact person to communicate with the City.
(Vinle the person designated us the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't beard from us
by roar target date. Staff mar contact you before the target date if the indict! review is complete. By fallowing this
procedure. von will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK -BUILDING FILE REV9/07
NIL:1N
LovEr:E0
0.2
E
PLANNING DEPT. A PROVED
13`r77---- 7/
DATE: V''//03
I2L(Ti ELAN