Loading...
2014, 06-06 Permit App: APR-2014-0043 ApproachSpokane Valley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter(6 sookanevaIlev.orq (Staff Use Only) PERMIT NUMBER: PERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: START DATE: 0610 BUILDING OWNER NAME: ANTICIPATED COMPLETION DATE: 66- MAILING 6 MAILING ADDRESS: ,,S -C) 4/ /10 lye 5 r" et CITY: 5:090�itr Va l% y STATE: CONTACT PERSON NAME: ZIP: q9o/ (> PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: / 83 2 i c Q • v el- /� CITY: �`a v c i'/et/ STATE: W, j PHONE: ` '/ 91e -V)7"0 CONTRACTOR LICENSE No.: FAX: V(4: ZIp: q, 40 D CELL: EXPIRES: CITY BUSINESS LICENSE NO.: (4I i. PROJECT DESCRIPTION (i lk s'e Prwlde ite Sk ch) Residential Driveway [[ Existing Curb & Gutter Culvert Installation Other Conditions: cl Commercial/Industrial Driveway Ef Rural Road Section Sidewalk Repair/Construction Bond/Insurance certification must be oil file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval f• -y violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted an < equently approved before this application can be processed. Signature Date: Updated 1-11-11 Page 1 of 1 http://www. spokaneva Iley. org/filestorage/ 124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb O Streetside Swale O Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) WI Z' Ell I w Ci al CURB 1 w z' cci of ; DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) I I FT (SEE TABLE) CONCRETE APPROACH �i C CU�e RETURN / 1.-- 4.--I--THROAT W I DTH [I FT --4--4 1 WING (SEE TABLE) WING STREET NAME STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE)" AS1RHALT APPROACH N1 IF CORNER LOT, DISTANCE FROM CURB RETURN n FT (SEE TABLE) 15 RADIUS RADIUS RETURN EDGE OF' ASPHALT 1 ---THROAT WIDTH n FT -I (SEE TABLE) STREET NAME STREET WITH ASPHALT EDGE NIF CORNER LOT, DISTANCE FROM RADIUS RETURN Q FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5'