Loading...
2014, 09-23 Permit: ROW-2014-0513 Trench, BoreSpokane aosoUalley. City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter@spokanevallev.ore ROW -2014-0513 DE -ROW PROJECT NAME: COMCAST OF WA TCP#6 ISSUED: 09/23/2014 SITE ADDRESS: 120 S HOLIDAY RD SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: OPEN TRENCH/BORE 68' IN ROW AND PLACE 2" PVC FOR CABLE LINE PARCEL: 55202.2308 APPLICANT: COMCAST-INVOICE / ATTN: Laurie Deitz 1701 JOHN F KENNEDY BLVD PHILADELPHIA, PA 19103 360-527-8213 ELECTRICAL CONTRACTOR: OWNER: FOWLER, TYSON D & HEIDI C 120 S HOLIDAY ST SPOKANE VALLEY, WA99216 Prince Telecom LLC 13701 24TH ST E BLDG G SUMNER, WA98390 253-261-1882 License: PRINCTI939KW Expires: 05/16/2015 wfun FEES: Paid Due Right of Way $168.00 Totals : $168.00 CONDITIONS * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. • The traffic control plan submitted has been approved for concept only. The Contractor is responsible for determining specific signage and layout as required by the Manual on Uniform Traffic Control Devices (MUTCD), WSDOT specifications and Washington State modifications to the MUTCD. All devices shall conform to the MUTCD and WSDOT specifications. * For all permits that include road obstruction the Contractor shall notify the Spokane Valley Public Information Officer (P10) at 509.720.5411 within 24 hours of receiving this approval. For any changes to the schedule of the road obstruction the Contractor shall notify the PIO of the change with a minimum of 48 hour notice prior to the road obstruction The Contractor shall provide the location of the work, expected start and end times and dates of the road obstruction. The PIO will notify the newspaper, school districts, Spokane Valley Police Department, or fire dispatch as necessary. * The City of Spokane Valley may request changes as warranted by traffic conditions and motorist behavior. * If the construction zone is open to traffic before completion of final paving the Contractor shall provide warning signs, as required by the MUTCD and WSDOT specifications. WSDOT Work Zone Traffic Control Guidelines are available at www.wsdot.wa.gov. For future submittals, please use the "Work Zone Traffic Control Plans (TC -1 — TC -18) if applicable to your project. * ' All pavement cuts within the City of Spokane Valley right-of-way shall comply with the current adopted Inland Northwest Regional Pavement Cut Policy, or as amended. * All pavement repairs shall be inspected by the City's ROW inspector, Scott Wallace (mobile: 509-869-5373). The Contractor shall notify Mr. Wallace a minimum of 24 hours in advance of the paving. Printed by Tamara Faurotom 09/2312014 01 47 PM Page 1 of 2 Spokane 4#Ualley City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 perm itcenter@spokanevallev.org DE -ROW ROW -2014-0513 The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's expense. Owner/Agent Date: Staff Approval Date: Printed by Tamara Faurotom 09/232014 01.47 PM Page 2 of 2