Loading...
2011, 03-24 Permit App: 11000667 Finish BasementProject Number: 11000667 Inv: 1 Application r � THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/24/2011 Page 1 of 2 Project Information: Permit Use FINISH BASEMENT - FRAMING WALLS Contact: FOWLER, TY & HEIDI Address: 120 S HOLIDAY RD C - S - Z: SPOKANE VALLEY WA 99016 Setbacks: Front Left: Right: Rear: Phone: (509) 868-9190 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 55202.2308 Block: SiteAddress: 120 S HOLIDAY RD Location:: CSV Lot: Owner: Name: FOWLER, TY & HEIDI Address: 120 S HOLIDAY RD SPOKANE VALLEY WA 99016 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 13,652 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: m - Review Building Plan Review Released By: Originally Released: 3/23/2011 By: TMELBOU Permits • Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp 'ha Notes Sq Ft Valuation Sq Ft Valuation BASEMENT F R-3 VB FINISH 0 $7,550.00 0 $7,550.00 BASEMENT Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $7.550.00 0 $7,550.00 Units Unit Desc 1 SELECT I SELECT I SELECT Operator: jmm Printed By. jmm Fee Amount $153.25 $4.50 $61.30 Permit Total Fees: $219.05 Print Date: 3/24/2011 Project Number 11000667 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/24/2011 Page 2 of 2 Notes PER TOM MELBOURN - FEES ADJUSTED BUILDER WAS CHARGED FOR UNFINISHED BASEMENT AT THE TIME OF PERMIT TAKEN OUT FOR HOME BEING BUILT. TOOK UNFINISHED COST LESS THE FINISHED COST AND THAT WAS THE AMOUNT FOR THE COST OF PROJECT Payment Summary: , Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $219.05 $219.05 $44.50 $174.55 Disclaimer: $219.05 $219.05 $44.50 $174.55 Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 3/24/2011 REC[ rr�, rt) Develop ent Department Perr)t.t.Center� clTrof V PER P.Qto311ER §prague venue, Suite B-3 Sp®ne M p4okai3e Valley, WA 9:206 ?it 04 8-0036 Va71E1e3C J ar_ ) .s.ok�.-rmi cen a -00377 estOOS -valle .or 1Nzme Submittal (Staff Use) Only) �/� PERMIT NUMBER: / I �/lWJ / PERMIT FEE: RESI ' ENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION 111 DECK SITE ADDRESS: 120 S. ASSESSORS PARCEL NO.: ADDITION/REMODEL 0 ACCESSORY BUILDING 0 OTHER Flniedoti Ra BUILDING OWNER NAME: etv ��1P c NAME: ` k e t a\ \/\-MAP f ADDRESS: /`2 YS.` l� 6011 CITY: Sr\/n� e '. h,/ 5' PHONE: ,., -I 01„Na I I CONTACT NAME: LEGAL DESCRIPTION: PatSicie/iNrn1 V m,e k \1/2-p\6; uJ1er- STATE: W " ZIP: qCtOl b FAX: W1-691 - 4o8 3 CELL: PHONE: FAX: CELL: CONTRACTOR NAME: 14 (Pt MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: • - EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE�" SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: RMs i-VICPMPA} --)K o tAi l\S (`IA P�eClttA 1 (Ji'1 wc�1 � -) <— `GRh .to^N WERE Fl01StFc ori ltVtvJ Cnn1STR CJtot4 fE ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: / NI, Dimensions: No. of Stories: M \()‘ Total Habitable Total a Main Floor SQ FT: K IA. Upper Floor SQ FT: N' WI Unfinished Baseme t SQ FT: ,� Finished Basement Q FT: 1505 Garage SQ FT: (4 JPS" f 1- Deck/Covered Patio SQ FT: is % Construction Type: )� Impervious Surfac Area: ta IN Heat Source: r, 300/0 Slopes on Property: a\R Sewer or Septic: No. of Bedrooms: TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Refereyced codes are available for review at the City of Spokane Valley Permit Center. 5) The Crty of Spokane Valley permit is not a permit oproval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be require e sub ed and subsequently approved before this application can be processed. Signature Date: -I 1' Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc Spokane Valley® • • For City Use Only / PLUS Project Nutnber / QU/&'7 Project Address /?-O /p /i 4&-, 11703 E Sprague Ave'Suite B-3 ♦ Spokane Vatley WA 99206 ' 509:688.0036 • Fax: 509.688.0037.+.permitcenter@spokaneyalley.org . As part of our • on-going commitment to'customer: service during the review, -process . of�'yout' project application, we are providing you with,a•TARGET:DATE•for the initial technical application review:'Iffor ' any reason.we cannot meet this date, we will contactyou with a revised target date.'. ' •' • . Your application review TARGET D'ATE'is' The TARGET DATE, is the "date we' estimate.your.'project application will have'. had its initial' technical reviewIt is not the date for approval or permit issuance. . ' , . .'Tips for a Smoother Project AnblicatiomReview' i Submii complete, accurate plans and documents.' Ecru time may bc,rcquired,jhr rc=.eubinittals ar' project applic,alion /ei•le ers itcrk ori. Multiple'appliccnions aitd it, may be,.se-ei-a/ days before tliep can. look di rour'new cir revised inibrmation. • i " • Designate a specific contact person to communicate with the City. • tVhilr the person designated as the applicants conhict person with the Citi- can he changed•'one individual. with the esperlise for dealing with trdieier'commenls wa:dc/ be the hest choice. for the,eulire relieir /7/ 0C•ers. . ' ' Call staff regarding the status of your project only after the target date shownat the',top of -the page. Although you should be contacted oil or by the target date, please, feel free IM.conk-let us -if you haven us, by your target date.' Staff may 'canon...volt before the Icugel Jule lithe initl01 /cview is complete. Bi foI/owing.lhts . procedure. you will save tune and alloWthe rewei ers to complete the idork'mureerped/tious/v.., . Steps in the Permit Process I. Counter Complete. Your 'applica.tron. has .been .accepted 'as couther: complete. This means of 01? required - documents, as Mdicated on your NeTApplication Checklist, have. been 'subTitted or: ha -ye :bteeri.:apPrOYed ''for. deferred submittal. This does not prevent technical stall' from reqties'ting additional,infofmatiMi as a -result Of theitffecknical review. • . 2. Quality Check. Themest step. in the process Ish quality check' to.hfake sure.that the appliehtjomis ;reviewable and free, frbm substantive flaws that would'prevent technical staff from completing the•teehnIcal seview once ii..is tatted.••, When • this step is complete, your application-, will be routed•to the appropriate Staff and •remain in ;their 'reYiew..queue until it • • 3. Technical Compliance. Once in application is administratively complete' it is,routed'to"teclinical"staff Tor compliance review. Depending on the type of project, technical ,staff may include multiple, reviewers:, You should.,be contacted by . phone, t x, email, or nail by your TARGET DATE'once the initial technical compliance revie(v is.complete. . • 4. Permit issuance. When the technical,compliance review of the application is complete, including, any subsequent,re-' submittals, each reviewer wirill approve thesection of the application 'and route it'to the Permit Center. •When all sections' of the application are received, a Permit Specialist will' process the application and contact the person specified on•your application for permit pick-up. Information regarding fees and pre-construction.mectings (if required] sill,be provided by • the Permit Specialist at that time. • WHITE -APPLICANT PINK -BUILDING FILE REV 9/07