2015, 05-27 Permit: SW-15000489 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000489 Permit Issued Date: 05/27/2015
Expiration Date: 05/27/2016
Project Description: SEWER
Project Name: CRONK
Primary Contact: LAUER EXCAVATION & CONST
Phone: 509-981-7954
Applicant: LAUER EXCAVATION & CONST
Address: PO BOX 11581
SPOKANE VALLEY, WA 99211
Phone: 509-981-7954
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1501 N HODGES RD
55172.0804
Assessor's Description: MISSION VISTA 1ST ADD LT 4 B2
Inspection Area: : (509)-477-3675
Owner: PHILLIPS, CAROLE L
Address: 1501 N HODGES RD
SPOKANE VALLEY, WA 99016 -
Phone:
Email:
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Zoning: Land Area: 10834 Square Feet
CONTRACTOR INFORMATION:
LAUEREC931DA, Exp. 03/01/2017
LAUER EXCAVATION & CONST
PO BOX 11581 SPOKANE VALLEY, WA 99211
509-981-7954
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
SVRP Aquifer Boundary: Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate? (use of private well)
from DOE prior to permit issuance.
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Parcel within 100 feet of pipeline(s) owned by the following: (GTN)
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire
Public Transit Benefit Area
GTN
Date Printed: 05/27/2015 08:24:23 Project Coordinator: Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000489
Permit Issued Date: 05/27/2015
Expiration Date: 05/27/2016
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/27/2015 08:24:23 Project Coordinator: Susan Clark