Loading...
2015, 04-30 Permit: SW-15000404 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000404 Permit Issued Date: 04/30/2015 Expiration Date: 04/30/2016 Project Description: SEWER Project Name: CRONK Primary Contact: KALIN EXCAVATION Phone: 509-954-9101 Applicant: KALIN EXCAVATION Address: 9229 E WOOLARD RD COLBERT, WA 99005 Phone: 509-954-9101 Email: SITE INFORMATION: Site Address: Parcel Number: 1502 N HODGES RD 55172.0704 Assessor's Description: MISSION VISTA 1ST ADD LT 4 B1 Inspection Area: : (509)-477-3675 Owner: BOYER, ROGER D Address: 1502 N HODGES RD GREENACRES, WA 99016-9445 Phone: Email: Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Zoning: Land Area: 11438 Square Feet CONTRACTOR INFORMATION: KALINE*0431B, Exp. 04/06/2017 KALIN EXCAVATION 9229 E WOOLARD RD COLBERT, WA 99005 509-954-9101 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $27.12 $125.00 $152.12 $125.00 CONDITIONS: SVRP Aquifer Boundary: Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate? (use of private well) from DOE prior to permit issuance. Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 04/30/2015 12:19:12 Project Coordinator: Susan Clark SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000404 Permit Issued Date: 04/30/2015 Expiration Date: 04/30/2016 SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/30/2015 12:19:12 Project Coordinator: Susan Clark