2015, 04-30 Permit: SW-15000404 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000404 Permit Issued Date: 04/30/2015
Expiration Date: 04/30/2016
Project Description: SEWER
Project Name: CRONK
Primary Contact: KALIN EXCAVATION
Phone: 509-954-9101
Applicant: KALIN EXCAVATION
Address: 9229 E WOOLARD RD
COLBERT, WA 99005
Phone: 509-954-9101
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1502 N HODGES RD
55172.0704
Assessor's Description: MISSION VISTA 1ST ADD LT 4 B1
Inspection Area: : (509)-477-3675
Owner: BOYER, ROGER D
Address: 1502 N HODGES RD
GREENACRES, WA 99016-9445
Phone:
Email:
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Zoning: Land Area: 11438 Square Feet
CONTRACTOR INFORMATION:
KALINE*0431B, Exp. 04/06/2017
KALIN EXCAVATION
9229 E WOOLARD RD COLBERT, WA 99005
509-954-9101
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS:
SVRP Aquifer Boundary: Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate? (use of private well)
from DOE prior to permit issuance.
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 04/30/2015 12:19:12 Project Coordinator: Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000404
Permit Issued Date: 04/30/2015
Expiration Date: 04/30/2016
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/30/2015 12:19:12 Project Coordinator: Susan Clark