Loading...
2006, 04-21 Permit App: 06001370 CarportProject Number: 06001370 Inv: 1 Application Date: 4/21/2006 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Location:: CSV Address: 1608 N HODGES LAND SPOKANE VALLEY, WA 99016 Zoning: UR -7 Urban Residential -7 Water District: Hold: ❑ Area: 0 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Reviewer Originally Released: 4/19/2006 By: TMELBOU Landuse/Zoning/HE Conditions Originally Released: 4/18/2006 By: CJJANSSE Sewer Review OWN ��"��,srs- Tte PER Roger @ utilities Originally Released: 4/21/2006 By: amblake Permits: Operator: AMB Printed By: AMB Print Date: 4/21/2006 Project Number: 06001370 Inv: 1 Application Date: 4/21/2006 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: ALPINE PATIO CONCEPTS Address: 9300 N MARKET SPOKANE WA 99217 Description GM Tvpe Notes GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes: Building Permit Firm: ALPINE PATIO CONCEPTS Phone: (509)467-0600 Total Project: Sg Ft Valuation 325 $6,175.00 325 $6,175.00 Fee Amount $139.25 $4.50 $55.70 Permit Total Fees: $199.45 ALL PERMIT APPLICATIONS IN MISSION MEADOWS MHP MUST HAVE PLANNING DIVISION REVIEW BY MICKI HARNOIS OR GREG MCCORRMICK Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $199.45 $199.45 $0.00 $199.45 $199.45 $199.45 $0.00 $199.45 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: AMB Printed By: AMB Print Date: 4/21/2006 This Application: Sq Ft Valuation 325 $6,175.00 Totals: 325 $6,175.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Total Project: Sg Ft Valuation 325 $6,175.00 325 $6,175.00 Fee Amount $139.25 $4.50 $55.70 Permit Total Fees: $199.45 ALL PERMIT APPLICATIONS IN MISSION MEADOWS MHP MUST HAVE PLANNING DIVISION REVIEW BY MICKI HARNOIS OR GREG MCCORRMICK Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $199.45 $199.45 $0.00 $199.45 $199.45 $199.45 $0.00 $199.45 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: AMB Printed By: AMB Print Date: 4/21/2006 Project Number: 06001370 Inv: I Application Date: 4/18/2006 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Location:: CSV Address: 1608 N HODGES LAND SPOKANE VALLEY, WA 99016 Zoning: UR -7 Urban Residential -7 Water District: Hold: ❑ Area: 0 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: nevi- - Buil* Landuse/Zoning/HE Conditions Sewer Review Permits: Contractor: ALPINE PATIO CONCEPTS Address: 9300 N MARKET SPOKANE WA 99217 Operator: AMB Printed By: AMB Released By: Building Permit Firm: ALPINE PATIO CONCEPTS Phone: (509) 467-0600 Print Date: 4/18/2006 Project Number: 06001370 Inv: 1 Application Date: 4/18/2006 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: ALL PERMIT APPLICATIONS IN MISSION MEADOWS MHP MUST HAVE PLANNING DIVISION REVIEW BY MICKI HARNOIS OR GREG MCCORRMICK Payment Summary: Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: AMB Printed By: AMB Print Date: 4/18/2006 i, or Permit Center S a�aRe 11707 E Sprague Ave, Suite 106 ,;oS Valle99206 Spokane Valley, (509) Y (509)688-0036 FAX: : (509)688-0037 Community Development «''%,x'-spokanevalley.oro.com Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application :v�rAddition/Remodel ❑ Deck ❑ Other: SITE ADDRESS ASSESSORS PARCEL NO: SS0�3 - `� I LEGAL DESCRIPTION: ,s a Name: SO-A(X) a .eP, Address: ) %U8 N- qoJW. City: S Po L Zi D 14 Phone: qt -(--45-30 Fax: Name: Phone: t(� Describe the scope of work in detail: 64 W. LiTti Name: % )) P a —c - Address: , J- 9 3 00 M4Irkeit- City: S PZWrve- zip: 99 Z 17 Ph (07-0600 Fax: q67-77-9-/ Lic No 4tP/0eC9 y7(33Ex . Date: 6//-08 City Business Lic No: Cost of Project: $ s,,ts4eA , 6"J Z Se -h 6 **************The foIlowine MIDST be comDlete: (write N/A if not HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2 Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: JSEWER OR SEPTIC? DISCLAIMER The permitee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, code's or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before UITZ plication ca Signature `- �`�l Date Ll 17-06 Method of Payment: (Faxed permit applications will only be accepted with major bankcard) ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 825(1005 ❑ Other 04JP �-1-5 1604 L ilrr ..` �:t..i�?� uu .._,�. S ..,...w-- .....�..... t t 53 1622 ' VltlDE UTILITY ASEMENT (TYP. O0[ sews M we* & o w e e w J• *000 � e *000 oww• w o e l*0040000004* *ar•• w w1• w o• s M w•••♦ e• w w• w w• 10" d See wa Leh Z f9 / /Ooh f�od�.� e .� z Z .5-/h 0k7 7e;�l 7 39/�007G7 Post -10 �> M464-�,U,r 6 Lt *-e R ;-A6A 5) j)owNs f'L,)U E-, ROLL FORMED PANEL PANEL FASCIA, ALUMINUM I BEAM OR OTHER STRUCTURAL HEADER FREESTANDING SINGLE SPAN COVER WIDTH MUST BE AT LEAST d CUBIC 75% OF PROJECTION FOR L FOOTING SINGLE SPAN ATTACHED STRUCTURES d d WIDTH LEDGER BOARD 0.5' PER 12' MINIMUM SLOPE PROJECTION ATTACHED SINGLE SPAN COVER :=`.v'. MAYBE MULTISPAN 3.5' CONCRETE SLAB (OPTIONAL) FORMED PANEL PANEL CIRCULAR FOOTING ALL HEADERS MAY OVERHANG 30% OF POST SPACING MULTIPLE SPAN' HEADERS ARE ALLOWED PATIO COVERS ARE LIMITED TO 12' HEIGHT COMMERCIAL COVERS AND CARPORTS ARE LIMITED TO 18' HEIGHT W. sn ALL PANELS - MAY OVERHANG 30% OF THEIR CLEARSPAN WOMPER'll d L d SINGLE SPAN FREESTANDING UNIT &Q� k04 .j I BEAM OR OTHER STRUCTURAL HEADER MULTISPAN FREESTANDING UNIT 4sk' �03j POST • CUBIC FOOTING EXP Pu' 34- Lyl < C C Ai Fl- • 3.5' CONCRETE SLAB (OPTIONAL) Ed :TRUCTURAL PANEL SPANS FOR COMMERCIAL AND PATIO STRUCTURES " Vee Panel Panel Wind Speed and Exposure Gauge Exposure B Exposure C (in) 90 110 90 110 0.020 10'-8" 10'-8" 10'-8" 10'-8" 0.025 12'-3" 12'-3" 12'-3" 12'-3" 0.032 14'4" 14'-4" 147-4" 14'-4" 0.040 16'-9" 16-9" 16'-9" 16'-9" !10.018 14'-2" 14'-2" 14'-2" 14'-2" 0.020 10'-5" 10'-5" 10'-5" 10'-5" 0.025 11'-11" 11'-11" 11'-11" 11'-11" 0.032 14'-0" 14'-0" 14'-0" 14'-0" 0.040 16'-4" 16'4" 164" 164" 10.018 13'-10"113'-10" 11'-5" 13'-10" 13'-10" 0.020 9'-6" 9'-6" 9'-6" 9'-6" 0.025 10'-11" 10'-11" 10'-11" 10'-11" 0.032 12'-10" 12'-10" 12'-10" 12'-10" 0.040 14'-11" 14'-11" 14'-11" 14'-11" 10.018 12'-8" 12'-8" 12'-8" 12'-8" 0.020 8'-3" 8'-3" 8'-3" 8'-3" 0.025 9'-6" 9'-6" 9'-6" 9'-6" 0.032 11'-2" 11'-2" 11'-2" 11'-2" 0.040 13'-0" 13'-0" 13'-0" 13'-0" 10.018 10'-8" 10'-8" 10'-8" 10'-8" 0.020 T-5" T-5" T-5" T-5" 0.025 8'-6" 8'-6" 8'-6" 8'-6" 0.032 10'-0" 10'-0" 10'-0" 10'-0" 0.040 11'-8" 11'-8" 11'-8" 11'-8" 10.018 9'-4" 1 9'-4" 9'-4" 9'-4" 0.020 6'-9" 6'-9" 6'-9" 6'-9" 0.025 T-9" T-9" T-9" 7'-9" 0.032 9'-2" 9'-2" 9'-2" 9'-2" 0.040 10'-8" 10'-8" 10'-8" 10'-8" 10.018 8'-3" 8'-3" 1 8'-3" 8'-3" 3"x24" Tri Vee Panel Live Panel Wind Speed and Exposure Load Gauge Exposure B Exposure C (psf (in) 90 110 90 110 20 0.020 9'-6" 9'-6" 9'-6" 9'-6" 0.025 11'-2" 11'-2" 11'-2" 11'-2" 0.032 13'-5" 13'-5" 13'-5" 13'-5" 0.040 14'-10" 14'-10" 14'-10" 14'-10" Steel 0.018 11'-8" 11'-8" 11'-8" 11'-8" 25 0.020 9'-3" 9'-3" 9'-3" 9'-3" 0.025 10'-11" 10'-11" 10'-11" 10'-11" 0.032 13'-2" 13'-2" 13'-2" 13'-2" 0.040 14'-7" 14'-7" 14'-7" 14'-7" Steel 0.018 11'-5" 11'-5" 11'-5" 11'-5" 30 0.020 8'-6" 8'-6" 8'-6" 8'-6" 0.025 10'-0" 10'-0" 10'-0" 10'-0" 0.032 1 12'-0" 12'-0" 12'-0" 12'-0" 0.040 13'-9" 13'-9" 13'-9" 13'-9" Steel 0.018 10'-4" 10'-4" 10'-4" 10'-4" 40 0.020 T-4" 7'-4" 7'-4" 7'-4" 0.025 8'-8" 8'-8" 8'-8" 8'-8" 0.032 1 10'-5" 10'-5" 10'-5" 10'-5" 0.040 12'-2" 12'-2" 12'-2" 12'-2" Steel 0.018 8'-10" T-10" 8'-10" 8'-10" 50 0.020 6'-7" 6-7" 6'-7" 6-7" 0.025 T-9" T-9" T-9" T-9" 0.032 1 9'-4" 9'-4" 9'-4" 9'-4" 0.040 10'-11" 10'-11" 10'-11" 10'-11" Steel 0,018 T-9" 7'-9" 7'-9" T-9" 60 0.020 6'-0" F'-0" 6'-0" 6'-0" 0.025 T-1" T-1" 7'-1" T-1" 0.032 8'-6" 8'-6" 8'-6" 8'-6" 0.040 10'-0' 10'-0" 10'-0" 10'-0" Steel 0.018 6-11" 6'-11" 6'-11" 6' -11 - TABLE 1.1 TABLE 1.2 ALL PANELS MAY OVERHANG UP TO 30% OF THEIR CLEARSPAN 4'x12" Vee Panel (Single Span Only) Live Panel Wind Speed and Exposure Load Gauge Exposure B Exposure C (pst (in) 90 110 90 110 20 0.020 12'-6" 12'-6" 12'-6" 11'-4" 0.025 14'-10" 14'-10" 14'-10" 13'-6" 0.032 17'-9" 17'-9" 17'-9" 16'-5" 0.040 19'-2" 19'-2" 19'-2" 19'-2" Steel 0.018 14'-5" 14'-5" 14'-5" 14'-5" 25 12'-3" 12'-3" 12'-3" 11'-4" 0.025 14'-5" 14'-5" 14'-5" 13'-6" 10.020 0.032 17'-4" 17'-4" 17'-4" 16'-5" 0.040 18'-10" 18'-10" 18'-10" 18'-10" Stee10.018 14'-0" 14'-0" 14'-0" 14'-0" 30 0.020 11'-2" 11'-2" 11'-2" 11'-2" 0.025 13'-3" 13'-3" 13'-3" 13'-3" 0.032 15-10" 15'-10" 15-10" 15-10" 0.040 17'-10" 17'-10" 17'-10" 17'-10" Steel 0.018 12'-8" 12'-8" 12'-8" ',tZ-8" 40 9'-8" 9'-8" 9'-8& 9'-8" 0.025 11'-6" 11'-6" 11'-6" 11'-6" 10.020 0.032 13'-9" 13'-9" 13'-9" 13'-9" 0.040 15-11" 15-11 ' 15-11" 15-11" Steel 0.018 10'-8" 10'-8" 10'-8" 10'-8" 50 8'-8" 8'-8" 8'-8" 8'-8" 0.025 10'-3" 10'-3" 10'-3" 10'-3" 10.020 0.032 12'-4" 12,-4" 12,-4" 12'-4" 0.040 14'-3" 14'-3" 14'-3" 14'-3" Steel 0.018 9'-4" 9'-4" 9'-4" 9'-4" 60 T-11" T-11" 7-11" 7'11" 0.025 9'-5" 9'-5" 9'-5" 91-5" 10.020 0.032 11'-3" 11'-3" 11'-3" 11'-3" 0.040 13'-1" 13'-1" 13'-1" 13'-1" Stee10.018 8'-3" 8'-3" 8'-3" 8'-3" Putnam Engineering 3441 Ivylink Place Lynchburg, VA 24503 (434)384-2514 carl putn am(&adelphia. net FABLE 1.3 Viking 2.5'x6" Flat Panel Live Panel Wind Speed and Exposure Load Gauge Exposure B Exposure C (psf) (in) 90 110 90 110 20 0.020 9'-11" 9'-11" 9'-11" 8'-1" 0.024 11'-5" 11'-5" 11'-5" 10'-1" 0.032 14'-4" 14'-4" 14'-4" 14'-0" 0.040 17'-2" 17'-2" 17'-2" 17'-2" 25 0.020 9'-8" 9'-8" 9'-8" 8'-1" 0.024 11'-1" 11'-1" 11'-1" 10'-1" .032 14'-0" 14'-0" 14'-0" 14'-0" 0.04016'-9" 16'-9" 16-9" 16'-9" 30 0.020 8'-10" 8'-10" 8'-10" 8'-1" 0.024 10'-2" 10'-2" 10'-2" 10'-1" 0.032 2'-10'12'-10'12'-10' 12'-10" 0.040 15'-5" 15'-5" 15'-5" 15'-5" 40 0.020 T-8" T-8" T-8" T-8" 0.024 8'-10" 8'-10" 8'-10" 8'-10" 0.032 11'-2" 11'-2" 11'-2" 11'-2" 0.040 13'-5" 13-5" 13'-5" 13'-5" 50 0.020 6-11" 6-11" 6-11" 6-11" 0.024 T-11" T-11" T-11" T-11" 0.032 10'-0" 10'-0" 10'-0" 10'-0" 0.040 12'-0" 12'-0" 12'-0" 12'-0" 60 0.020 6'-3" 6'-3" 6'-3" 6'-3" 0.024 7'-3" T-3" T-3" T-3" 0.032 9'-2" 9'-2" 9'-2" 9'-2" 0.040 11'-0" 11'-0" 11'-0" 11'-0" FABLE 1.4 Lo 44PI, -1111THIS U so, BUILDING PRODUCTS Mesquite, TX 75149 (972) 285-8811 F(972) 882-8818 171 2.440 41' A U41�- O 3'x24' STRUCTURAL PANEL 3004H36 ALUMINUM ASTM A-653 GRADE 40 STEEL 0.070 0450 OS00-{ /C\-0806 I 2.419 3.500 4.0 60' 0806 07 ��3.000 4'x12' STRUCTURAL VEE PANEL 3004H36 ALUMINUM ASTM A-653 GRADE 40 STEEL 1.000 0.920 2.500 Q300 2.460 Q 6.000 us 2.5'x6' FLAT PANEL 3004H36 ALUMINUM DOTES FASTEN ALL PANELS TO FASCIA WITH #10 SHEET METAL SCREWS (SMS) OR SELF DRILLING SCREWS (.SDS). FASTEN ALL PANELS TO OTHER HEADERS WITH #14 SMS OR SDS, 3, 90 MPH EXPOSURE B AND C REQUIRE TWO SCREWS AT THE HEADER AND HANGER PER 12'. 1, 105 MPH EXPOSURE B AND C REQUIRE TWO SCREWS AT THE HEADER AND HANGER PER 12' FOR ALL TRIBUTARY WIDTHS JNDER 8'. ALL TRIB WIDTHS OVER 8' REQUIRE THREE SCREWS PER 12' � I-O.o2e -r4.000-1 r 4.000 I- 3.000-1 y F `80.140 3.000 OA32 ALUM 80.380 0.043 STEEL 4' OR 5' 0.188 0.062 3.000%f Y n 4 DO 0.125 ;imio - I lz 0s272 3' CLOVERLEAF POST + ":1 ~ 3004H36 ALUMINUM 0.125'X4'x4' POST 10 4' ❑R 5' SQUARE 0,075'X3'x3' POST 0,062'X3'x3' MAGNUM POST 6063T6 ALUMINUM STEEL POSTS ASTM A36 6063T6 ALUMINUM 6063T6 ALUMINUM ASTM A-653 GRADE 40 STEEL 0274 0.577 03270 3.662-{ 0.032 0-062 - 5.04 I �jr--�'� ` 0.062 3.600 00511 ' r Il1S00 Q11S00 T 0.250 - Q �` 3.1.00 I 3.100 0.062 �. �J 4.100 1299 ( 4.060 16 I+ 15 ' \ 3.081 1,5' SQ TWIN POST 3.993 I-Loo0 t -1.012 3004H36 OR 6063T6HANGERS FOR 3' PANELS AWNING RAIL ALUMINUM - HANGERS FOR 4' PANELS 6063T6 ALUMINUM 606376 ALUMINUM 6063T6 ALUMINUM •EXTRUDED ALUMINUM CLIP 1.005 0.075 6110 ' k -E-1.375 �u 1.9 15 Q1-3.650-{ 20 • 6' SMOOTH GUTTER 6063T6 ALUMINUM I 0640 '-R0.315 I 1 04 -R0.315 FOR 4' PANELS a FOR 3' PANELS � 6110 5110 5.782 0.055 1.812 11.4761 0.0 2 0 10,476]- i 0.075 2-050 I ep 0.480J I-3.770-� 6' MAGNUM GUTTER 6063T6 ALUMINUM t0,480� 1---3.770---j 22 rli 5' MAGNUM GUTTER 6063T6 ALUMINUM FASCIA SPLICES 6' MAGNUM MUST BE SPLICE WITHIN 6063T6 12' OF A POST. ALUMINUM Apr 19 2006 9:50 HP LASERJEI I -HX i _� it y baa A Lima. mid s tii_m f 3 SHEET NO. 1 tA 2 3 3A 4 E AND Ctun N il�C k i T 0 L S1Fi 1 ?12 FCR Pf1,V :PUL". ,,.?AL'S 11 ET: pO k 11 FOR i�w zars+E�s 12 13 4I SIEE7 �fi '�ATTAOOEV7 nc1�__ r, xtst, tkut.�c �- EMST. OMDNG TAB! E Cr "QNTr,1\17S CL�IVTCv1 'OVER SHEET UMIOD OF USING TASK=S, ^EVER"d NOTES, InlS'UTr�RI' ' fTi G.,.. DECKING SPANS PATIO COYERa- ALLOWABLE SPANS, RECUIRED COLUMNS & FNii!;GS 20 PSF SPAN TABLES 25 PSF SPAN TABLES 30 PSF SPAN TABLES 40 PSF SPAN TAEILES 50 PSF SPAN TABLES 60 PSF SPAN TA3LES COMPONENT DETAILS COMPONENT DETAILS CONNECTION DEIAILS - POSTS TO FOOTINGS C1,VNECTiOl DETkU -- Pj T,b DFAMS TO POSTS, F.AS(:!A ATTAwl.;ENT CONNECTION DETAILS — 1101;—PARD 9EAWS W "OSTS. ;ASCU;, 5CFOLL COLUIdN TO ALL BEAUS CONNECTION DEfkLS — SPLICES AND ATTAC'-QdENT TO aILCING SKYLIGHT %PFDiU JQJS1 - ALLOIi'A.BLE SPAN JCQ 1TLE ,,II�� BUILDING PRODUCTS 7551 ki. 190 th. St. KENT, VIA, f .IC?i Na 02-199. %0 I �� 111I 0 V MAL, oa�uu 98032 DATE AUGUST; 2003 S1CrT NO_ 1"� S ,.fir 4 ..._�"ti.: i2-31- , y JCQ 1TLE ,,II�� BUILDING PRODUCTS 7551 ki. 190 th. St. KENT, VIA, f .IC?i Na 02-199. %0 I �� 111I 0 V MAL, oa�uu 98032 DATE AUGUST; 2003 S1CrT NO_ 1"� S ,.fir 4 ..._�"ti.: 0� }`✓�' y $ s....r � JCQ 1TLE ,,II�� BUILDING PRODUCTS 7551 ki. 190 th. St. KENT, VIA, f .IC?i Na 02-199. %0 I �� 111I 0 V MAL, oa�uu 98032 DATE AUGUST; 2003 S1CrT NO_ PROVIDE DIAGRAMS AND ENGINEFR,!!!G LAYOUTS FOR ROOF TRU:-'SES, BEAMS AND FLOOR S)'>; E=M3 PRIOR TO FRAMI-IG INSPECTIONS CITY COI'Y THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS sfi,, rn�r RE E'I,t`aPLsANCE SPS:—t�q