Loading...
2008, 08-12 Permit App: 08003054 CarportProject Number: 08003054 Inv: I Application Date: 8/12/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Parcel Number: 55083.9066 Block: Lot: SiteAddress: 1720 N HODGES LN Owner: Name: MISSION MEADOWS LLC Address: 15918 E CAMERON CT Location:: CSV SPOKANE VALLEY WA 99037 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 0 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review n ormation: .. ... , . Review Building Plan Review Originally Released: Landuse/Zoning/HE Conditions Released By: 8/7/2008 By: tmelbourn Released By: Originally Released: 8/12/2008 By: LBARLOW Permits:.h,,,..... Operator: JD Printed By: JD Print Date: 8/12/2008 Project Number: 08003054 Inv: 1 Application Date: 8/12/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: ALPINE PATIO CONCEPTS Address: 9300 N MARKET SPOKANE WA 99217 Description Gra Type Notes CARPORT OP R-3 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Building Permit Firm: ALPINE PATIO CONCEPTS Phone: (509)467-0600 This Application: Sg Ft Valuation 868 $13,020.00 Totals: 868 $13,020.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Total Project: Sg Ft Valuation 868 $13,020.00 868 $13,020.00 Fee Amount $237.25 $59.31 $4.50 $301.06 Notes �.,.. Payment Summary:"',-,,, Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $301.06 $301.06 $0.00 $301.06 $301.06 $301.06 $0.00 $301.06 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: 3D Printed By: JD Print Date: 8/12/2008 Spokane jValley-* Community Development Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www•.spokanevalle .org Residential Construction Permit Application PERMIT NUMBER: �p PERMIT FEE: ❑ New Construction n_Addition/Remodel Other: SITE ADDRESS: ZV / S LA/ ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: N O Address`. S �� bcQ 1 /E, City: O V lJ/i/ State: Uig} Zip:194)3 7 PhoFax: Q9/- 9V ne: j9 ( _�c�� ) Contact Person Name: Phone: 4 Describe the scope of work in detail: Z Proposed Use: ❑ Accessory Bldg ❑ Deck Contractor: DIMENSIONS: Name: /r✓i �✓'✓c Address: ��MA 2 FLOOR SQ. FTG: City: d K State: WlZ Zip: 99 Z) ' Phone: Fax: q6 7 " 7 7 Contractor Lic " No: / oll J C 9 / p Date: City Business Lic. No: Cost of Project: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DE COV. PATIO $Q. FTG: 30% SLOPES ON SQ. FTG: ` PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEIAT SOURCE SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: '�'J 4'"DATE: — S Method of Payment: ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Mastercard ❑ VISA Expires: VIN#: Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting ❑ Plan revisions ❑ Transmittal Date: Wednesday, August 06, 2008 Site Address: 1720 N HODGES LN Project Number. U8003054 Parcel Number: 55083.9066 Zoning: R-4 Water District: CONSOLIDATED ID #19 Fire District: FD 01 Applicant: ALPINE PATIO CONCEPTS 9300 N MARKET SPOKANE WA 99217 (509) 467-0600 e-mail: Contact: ALPINE PATIO CONCEPTS 9300 N MARKET SPOKANE WA 99217 (509) 467-0600 e-mail: Contractor. ALPINE PATIO CONCEPTS 9300 N MARKET SPOKANE WA 99217 (509) 467-0600 Project 14 X 62 CARPORT Description: Owner: MISSION MEADOWS LLC 15918 E CAMERON CT SPOKANE VALLEY WA 99037 e-mail: Occupant: e-mail: Arch / Engineer: _i e-mail: Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use Only PLUS Project Number , ��� SPCITY OF Project Address OKane �l a alle ° y 11703 E Sprague Ave Suite B-3 ♦Spokane Vattey WA 99206 491;000 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for. any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 �N i' 3U1000 --- °' 171 1305 � XU,' 25117291I 11 � 3 Own~ 0.8 � HODGES LANE 7.• 53 .. MOON& effimmomw )726 II i II ammw� 53 � 1% tb Q I� 6 ---- -- -� , : LOT 16 • $' f; ' 1720 N. Hodges Lane North Z Z -a ° Scale: 1" = 20' - • • Resident approval of site plan 5% Signature date _ Signature date _ D C tD m N U Co U W U U 3 T .................. 53' 0) HODGES LANE 1729 1 1 M. 84 I_ dh w� 53 .... �f f726 --VON t 17 1 --� ��• ;,��� -�: LOT 16 T j¢ Hod 1720 N. es Lane aye g a North Scale: 1" = 20' Resident approval of site plan 53 5%i Signature date Signature date D C m m m m w w w U 3 --U May 1, 2007 Thad W. Shoesler Alpine Patio Concepts, Inc. 9300 N Market Street Spokane, WA 99217 Dear Thad: I am the engineer of record for the Metals USA: Engineering for Aluminum Patio Covers, Carports and Commercial Structures. These plans are standard plans and are designed so that a non design professional can easily determine the components/details required to build a structure. Alpine Patio Concepts, Inc. is a customer of Metals USA and the engineering package is applicable to all structures they build within the scope of the plans. I am licensed in 25 states and these plans are used similarly all over the country. Please contact me at (434) 384-2514 or at cad putna mO-com cast. net if you require further information. Sincerely, Carl Putnam Cc: Mike Irvi WESTERN AWNING CO. AWNING RAIL HANGER ��> SIDE FASCIA CORNER POSTBRACKET POST POST BRACKET \�U� DECKING PANEL - GUTTER SPLICE \ BEAM SPLICE FASCIA GUTTER I -BEAM (IF REOD.) AWNING FRAME ASSEMBLY WESTERN AWNING CO. I ROLL FORMED OR LAMINATED SANDWICH PANEL FASCIA, ALUMINUM I BEAM OR OTHER STRUCTURAL HEADER g n REQUIRED FOR CONSTRAINED FOOTINGS FREESTANDING SINGLE SPAN COVER CIRCULAR FOOTING of DETAIL MU108 r Ls'� •' '.;: = CUBIC FOOTING DETAIL MU108 V WIDTH MUST BE AT LEAST d d ALL HEADERS MAY 75% OF PROJECTION FOR OVERHANG 25% OF SINGLE SPAN ATTACHED STRUCTURES WIDTH LEDGER BOARD POST SPACING PROJECTION Mu ATTACHED SINGLE SPAN COVER MAY BE MULTISPAN 0.5'PER 12' MINIMUM SLOPE MULTIPLE SPAN J HEADERS ARE ALLOWED PATI❑ COVERS ARE LIMITED TO 12' HEIGHT COMMERCIAL COVERS AND CARPORTS ARE LIMITED TO 18' HEIGHT ROLL FORMED OR LAMINATED SANDWICH PANEL ALL PANELS MAY OVERHANG 25% OF THEIR CLEARSPAN d + w CUBIC FOOTING ±• i'Y. DETAIL MU108 3.5' CONCRETE SLAB ATTACHMENT d <�cl FOR SINGLE SPAN ATTACHED PATIO COVERS ONLY SINGLE SPAN SURFACE MOUNT OR FREESTANDING UNIT EMBEDDED ATTACHMENT Nu 0♦ I BEAM OR ❑THEE STRUCTURAL HEA. MULTISPAN FREESTANDING UNIT POST CUBIC FOOT DETAIL MUIC 3.5' CONCRETE SLAB REQUIRE FOR CONSTRAI FOOTINGS AND FASCIA 3004H36 SEE DETAIL M113 TL n 2.5' O 22 --6'--) 2.5'X6' FLAT PANEL 3004H36 ALUMINUM 2.200 — 24'24' SEE. DETAIL M1131 1 SEE DETAIL M113 2s• z.s 24' SEE DETAIL i 24' PATTIPORT 3004H36 OR ASTM A653 GRADE 40 STEEL NR PANEL 3004H36 2.5'X24' TRI VEE PANEL 3004H36 ALUMINUM ASTM A-653 GRADE 40 STEEL BLE 4.19 SEE TABLE 0.078 4.18 OR 4.19 aosD 0 � o.oso 29 I 6c 0.036' I + 0.062 5.6' u D.D70 30 O I 1-2.so—� 3.25 e I - '1 f RF FASCIA 2S .8--{ O F-3 31 6' 3004H36 ALUMINUM 5' RF FASCIA SAMPSON GUTTER 6 .5' RF FASCIA 3004H36 ALUMINUM FASCIA 3004H36.5'R ALUMINUM 6063 T6 'EL DETAIL M113 -6' AT PANEL 36 ALUM R10 SNS e24' 0/C /I. PANEL 1N TERLOCK 1.5 PCF FOAM \ 74 `-0.024' or 0.032' 3105H14 ALUMINUM UM SANDWICH PANEL IEL CONFORMS TO ICC AC04. CONFORMS TO ICC AC05 .e sMs es• D/c 12 4 Ml 33 4'x12' VEE PANEL 3004H36 ALUMINUM ASTM A-653 GRADE 40 STEEL F SEE DETAIL Ml13 25 26 Ml 2.5'X12' TWIN VEE PANEL 3004H36 ALUMINUM ASTM A-653 GRADE 40 STEEL MA 6' ALLMET EXTRUDED FASCIA 6063 T6 SEE TABLE 4.18 OR 4.19 5.1 x -- 3.8 —� 5' MAGNUM GUTTER 6063T6 ALUM SEE TABLE 4.18 OR 4.19 I5 1 � 33 4.5' EXTRUDED FASCIA 6061 T6 6' MAGNUM GUTTER 6' SMOOTH GUTTER 6063T6 ALUM 6063T6 ALUM WESTERN PANELS1B sMs e8 o/c AND FASCIA 24 3' .tl 39 3'X24' PANEL 3004H36 ALUMINUM ASTM A-653 GRADE 40 STEEL Carl Putnam, P.E. 3441 IVYLINK PLACE LYNCHBURG• VA 24503 CARLPUTNAM2COMCAST.NET aa. * CMP GM By CMP 10/9/2007 r� MUSA03.DWG 3 of 10 R"isiols 1,625-1 I 0062 0.050' T'0.062 2 5' 7 3.062' I - - 0.062' 3.06 2' 3.74REF I 1.100 3.562' 3.74' REF 1 4.060 =.373' 4.24' (n 0.062' ;a coo=L U 4" HANGERS 42 o.oso Mu 45 Q I 6063T6 ALUM FD6FRe MU 3' AND 2.5" "G' HANGER >� cauM 6%3 T -s) 43 44 3' J' RAIL Cr, Qm�^m 3-1/2" "J" RAIL CC RAIL PROFILES ALUM. ALLOY 6063-T6 cc rl SEE TABLE 7.5 FOR _i TYPE AND7panet ''rtrt.1N N OF F 0.75' `a_i Z 1.101 3.100 i w a 0.062 I 0.050' � Q � � � � I `I 6063T6 HANGERS 3.562—W062'2.062• . co height , I d ua 4.000 11-11.062' H 1.062'3000—{ 0.040- �� MAR 2 8 7009 f 0.625.777""" 1.50' 0.125 ee "C" HANGER 3-1/2" "G" RAIL i9 2" "J" RAIL 5 0.062 � I'1'7a,1 7 so 3" POST 0.125"x4"x4" POST 0,062'x3'x3' ALUM 6063T6 ALUM MAGNUM POST ` 9(,, 6063T6 ALUM„= FASCIA SPLICES MUST BE WITHIN 12' OF A POST —0.0620 - 0.0620 SEE DETAIL X MU EXTRUDED s3 5' EXTRUDED TTER SPLICE GUTTER SPLICE i3 T6 ALUMINUM 6063 T6 ALUMINUM k 500 MU 54 5' ROLL FORMED GUTTER SPLICE 3004 H36 ALUMINUM 1' MIN MU 0 0 0 VS 1-1' M I \ } iz sus V MIN— SCREW O O O o O O O SCREW PATTERNS FOR ALL FASCIA SPLICES ALL FASCIA SPLICES MUST BE WITHIN 12' OF A POST Cart Putnam, P. E. 3441 IVYLINK PLACE LYNCHBURG. VA 24503 CARLPUTNAM2COMCAST.NEI CMP c�«♦ er CMP Ool♦ IO/9/2007 MUSA04.OWG Sca. NTS Pow '4 of 1 /SEE TABLE 4.19 RevisionsI-3.287'-1 /-RF OR EXTRUDED FASCIA SEE TABLE 4.19 �T.0105 ao M a (n mm o `a In +0.07401 LS' 3.062 ONE 46' BOLTS EIGHT M8 SMS/SDS 0• FOR FOOTINGS UP TO d=27' 'L TWO 3fi' BOLTS OR 12 SCREWS ;T FOR FOOTINGS UP TO d=31' Mu SAMSON BEAM 99 (ALUM. 6063-T6) GALVANIZED POWERS WEDGE BOLT (ICC ESR I678)I FOR SLAB ATTACHMENT AND FOOTINGS UP TO d=26' USE 2.5' EMBEDMENT FOR FOOTINGS UP TO d=30' USE 3-5' EMBEDMENT FASCIA OR 4' I BEAM TWO %' BOLT w/ 1.25'0 STEEL WASHER FOR SLAB MOUNT AND d=27' FOOTINGS. THREE ¢'BOLTS FOR d=30' FOOTINGS MAX HEIGHT 8' 0.032'X1.5'X1.5' ALUM TWIN POST 1.5' 6' OR 9' --7' EIGHT 118 SMS FOR SLAB MOUNT AND FOOTINGS UP TO d=25'. SIXTEEN 48 SMS FOR FOOTINGS UP TO d=30' TWO 3/8' BOLTS FOR d=30' ROOF PAN 4', 5' OR 7' I BEAMS TWO 3/8' BOLTS V/ 1.5' STEEL WASHER ONE 3/8' BOLTS FOR d=31' FOOTING TWO 3/8' BOLTS FOR d=39' FOOTING 0.062' ALUM 6063T6 3'x3' CLOVERLEAF BRACKET MAY BE TWO STEEL POST SEPERATE OR ONE HEAVY DUTY BRACKET CONTINUOUS ALUM OR STEEL -.0625' Mu ALUM. ALLOY 6061 T-6 tot I -BEAM WITH BRACKET Oo POST CONNECTIONS AN SCROLL POST DETAIL SINGLE SPAN ATTACHED UNITS ONLY TABLE 4.18 OR 4.19 SEE TABLE 4.19 14AR 2 8 290f I/ W S ER WASHER / ` S / A1.t�� 1/4' BOLTS w/ SEE TABLE FOR ONE fib' BOLT FOR FOOTINGS UP TO X5/8' STEEL WASHERS NUMBER AND SIZE I d=24' AND 90 MPH EXP B SLAB ATTACH V,5'X 3' I OF BOLTS. EXPIRES 2:�5 TWO %' BOLTS FOR 90 MPH EXP C SLAB " EAM BRACKET FOOTINGS UP TO a=ze• BOTTOM CONNECTION TO POST REQUIRES ;JF Of 112" Maximum OR SDS THE SAME TWO 3/8' BOLTS dolts Footing Size Cori Putnan, P.E. R d=27' STANDARD ALUMINUM 4 47" 3441 IVYLINK PLACI SCREWS BRACKET DETAIL x3' L❑CKSEAM -__ - _ ��l 6 54" LYNCHBURG, VA 24° CARLPUTNAMQCOMCA! TOP OR MU79 OR MU83 OR ETAIL MU89 # of 31r Maximum NECTION u• BRACKET MU84/85 AX FOOTING SIXE CUT PORTION OF bolt8 FootiTl Size 93/B'0 GLAVANIZED POWERS = 32" BOTTOM WEDGE BOLT [CC ESR -1678 POST 6 49" 49" °r- ft CMP I SEE NOTE w/ 2.5' EMBEDMENT FOR FOOTINGS W/ d=26' OR SLAB ATTACHMENT 8 54" �^��ft CMP I FOOTINGS UP TO d=31' REQUIRE EMBEDMENT OF 3.5' STEEL POST DETAIL MU93 °01 10/9/2007 CONNECTION OF 3' POSTS TO FASCIA Mu MUSA07.DWG OR 4' I BEAM AND SLAB/FOOTING 104 I -BEAM CONNECTION SINGLE SPAN ATTACHED UNITS ONLY SOLID COVERS 4.0: WESTERN PANEL SPANS FOR COMMERCIAL AND PATIO STRUCTURES A" 19., wPctPrn VPP Panel (Sinole Soan) MU35 4"x12" Western Vee Panel (Multispan) MU35 Ground Panel Wind Speed and Exposure Snow Load Gauge Exp B Exposure C (psf) (in) 90 90 105 110 20 0.020 12'-6" 12'-6" 12'-6" 12' -2 - LIVE 0.024 14'-10' 14'-10' 14'-10' 14'-3" 0.032 17'-9" 17'-9" 17'-6" 164" 0.040 19'-2" 19'-2" 19'-2" 19'-Z,' Steel 0.018 15'-7" 15'-7" 164" 14'-6" Steel 0.024 18'-2" 18'-2" 18'-2'' 18'-20 0:020 12'-3" 12'-3" 12'-3" 12'- 2. " 0.024 14'-5" 14'-5" 14'-5" 14'-3" 0.032 17'-4" 17'4" 17'-4" 16'- ' 0.040 18'-10' 18'-10' 18'-10' 18--11% Steel 0.018 15'-2" 15'-2" 15'-2" 14'-6" Steel 0.024 17'-9" 17'-9" 17'-9" 17'-9" 30 0.020 11'-2" 11'-2" 11'-2" 11'-2" 0.024 13'-3" 13'-3" 13'-3" 13'-3" 0.032 15'-10' 15-10' 15'-10' 15'-10' 0.040 17'-10' 17'-10' 17'-10' 17'-10' Steel 0.018 13'-11' 13'-11' 13'-11' 13'-11' Steel 0.024 16'-3" 16'-3" 16'-3" 16-3" 40 9'-8" 9'-8" 9'-8" 9'-8" 0.024 11'-6" 11'-6" 11'-6" 11'-6" 1-0.020 0.032 13'-9" 13'-9" 13'-9" 13'-9" 0.040 15'-11' 15'-11' 15'-11" 15'-11' Steel 0.018 12'-2" 12'-2" 12'-2" 12'-2" Steel 0.024 14'-2" 14'-2" 14'-2" 1 14'-2" 50 0.020 8'-8" 8'-8" 8'-8" 8'-8" 0.024 10'-3" 10'-3" 10'-3" 10'-3" 0.032 1 12'-4" 12'-4" 12'-4" 12'-4" 0.040 14'-3" 14'-3" 14'-3" 14'-3" Steel 0.018 10'-11' 10'-11" 10'-11' 10'-11' Steel 0.024 12'-9112'-9" 11'-1" 12'-9"112'-9" 11'A"ll 60 0.020 7'-11" 7'-11" 7'-11" 7'-11" 0.024 10'-11' 10'-11' 10'-11' 10'-11' 0.032 11'-3" 11'-3" 11'-3" 11'-3" 0.040 13'-1" 13'-1" 13'-1" 13'-1" Steel 0.018 9'-2" 9'-2" 9'-2" 9'-2" Steel 0.02411 V-8" 1 11'-8" 1 11'-8" 1 11'-8" Ground Panel Wind Speed and Exposure Snow Load Gauge Exp B Exposure C (ps (in) 90 90 105 110 20 0.020 10'-10' 10'-10' 10'-10' 10'-10' LIVE 0.025 12'-8" 12'-8" 12'-8" 12'-8" 0.032 14'-11' 14'-11' 14'-11' 14'-11' 0.040 17'-2" 17'-2" 17'-2" 17'-2" Steel 0.018 12'-9" 12'-9" 12'-9" 12'-9" Steel 0.024 16'-3" 1 16'-3" 16'-3" 16'-3" 25 0.020 10'-7" 10'-7" 10'-7" 10'-7" 0.025 12'-5" 12'-5" 12'-5" 12'-5" 0.032 14'-6" 14'-6" 14'-6" 14'-6" 0.040 16'-9" 16'-9" 16'-9" 16'-9" Steel 0.018 12'-5" 12'-5" 12'-5" 12'-5" Steel 0.024 15'-10' 15'-10'115'-10',15'-10' 10'-6" 10'-6" 30 0.020 9'-7" 9'-7" 9'-7" 9'-7" 0.025 11'4" 11'-4" 11'-4" 11'-4" 0.032 13'-3" 13'-3" 13'-3" 13'-3" 0.040 15'-4" 15'-4" 164" 154" Steel 0.018 11'-2" 11'-2" 11'-2" 11'-2" Steel 0.024 14'-6" 14'-6" 14'-6"14'-6" 10'-8" 40 0.020 8'-3" 8'-3" 8'-3" 8'-3" 0.025 9'-9" 9'-9" 9'-9" 9'-9" 0.032 11'-6" 11'-6" 11'-6" 11'-6" 0.040 13'-4" 13'-4" 13'-4" 13'-4" Steel 0.018 9'-4" 9'-4" 9'-4" 9'4" Steel 0.024 12'-6" 12'-6" 12'-6" 12'-6" 50 0.020 7'-3" 7'-3" 7'-3" 7'-3" 0.025 8'-9" 8'-9" 8'-9" 8'-9" 0.032 10'4" 10'4" 10'4" 10'4" 0.040 11'-11' 11'-11' 11'-11 11'-11' Steel 0.018 8'-1" 8'-1" 8'-1" 8'-1" Stee10.024 11'-1" 11'-1" IVA" 11'A"ll 60 0.020 6'-6" 6'-6" 6'-6" 6'-6" 0.025 9'-11" 9'-11" 9'-11" 9'-11" 0.032 9'-5" 9'-5" 9'-5" 9'-5" 0.040 10'-11' 10'-11' 10'-11 10'-11' Steel0.018 7'-2" 7'-2" 7'-2" 7'-2" Steel 0.024 10'-1" 10'-1" 10'-1" 10'-1" TABLE 4.24 IHDLC '+. 4,J o. ,.1 ilzi I. Cnnnl M1139 y Ground, Panel Wind Speed and Exposure Snow Load Gauge Exp B Exposure C (psf) (in) 90 90 105 110 20 0.020 9'-9" 9'-9" 9'-9" 9'-7" LIVE 0.025 11'-9" 11'-9" 11'-9" 11'-9" 0.032 13'-9" 13'-9" 13'-9" 13'-9" 0.040 14'-10' 14'-10" 14'-10' 14'-10' Steel 0.018 12'-3" 12'-3" 12'-3" 1 12'-3" 25 0.020 9'-7" 977-6'--7`9'4" 4'-11" 4'-11" 0.025 11'-5" 11'-5" 11'-5" 11'-5" 0.032 13'-5" 13'-5" 13'-5" 13'-5" 0.040 14'-7" 14'-7" 14'-7" 14'-7" Ste 10.018 12'-0" 12'-0" 12'-0" 12'4" 30 0.020 8'-9"8'-9" 8'-9" 8'-9" 0.025 10'-6" 10'-6" 10'-6" 10'-6" 0.032 12'-3" 12'-3" 12'-3" 12'-3" 0.040 13'-9" 13'-9" 13'-9" 13'-9" Steel 0.018 11'-0" 11'4" 11'-0" 11'-0" 40 0.020 7'-7" 7'-7" 7'-7" 7'-7" 0.025 9'-1" 9'-1" 9'-1" 9'-1" 0.032 10'-8" 10'-8" 10'-8" 10'-8" 0.040 12'-2" 12'-2" 12'-2" 12'-2" Steel 0.018 9'-7" 9'-7" 9'-7" 9'-7" 50 0.020 6'-9" 6'-9" 6'-9" 6'-9" 0.025 8'-2" 8'-2" 8'-2" 8'-2" 0.032 9'-6" 9'-6" 9'-6" 9'-6" 0.040 10'-11' 10'-11' 10'-11' 10'-11' Steel 0.018 8'-7" 8'-7" 8'-7" 8'-7" 60 0.020 6'-2" 6'-2" 6'-2" 6'-2" 0.025 7'-5" 7'-5" 7'-5" 7'-5" 0.032 8'-9" 8'-9" 8'-9" 8'-9" 0.040 10'-0" 10'-0" 10'-0" 10'-0" Stee10.018 7'-10" a 7'-10" 7'-10" 7'-10" Metals USA Building Products 227 South Town East Blvd Mesquite, TX 75149 (972)285-8811 F(972) 882-8818 3"x24" Western Panel (Multispan) M1 .t Ground Panel Wind Speed an(., Snow Load Gauge Exp B Expc ( sf) (in)r14-1 10'-7" 90 1 20 0.020 13'-0" 8'-9" 8 LIVE 0.025 14'-7" 10'-10' 1C 0.032 10'-9" 13'-4" 1; 0.040 7'-8" 14'-10' 1Steel 0.018 9'-7" 11'-0" 1 0.025 10'-7" 10'-7" 11 0.032 13'-0" 13'-0" 1; 0.040 14'-7" 14'-7" 1 Ste 10.018 10'-9" 10'-9" 11 30 0.020 7'-8" 7'-8" -1 0.025 9'-7" 9'-7" 0.032 11'-10' 11'-10' 11 0.040 13'-9" 13'-9" 1: Steel 0.018 9'-8" 9'-8" 0.025 8'-3" 8'-3" E 0.032 10'-3" 10'-3" 1 0.040 12'-2" 12'-2" 1. Steel 0.018 8'-2" 8'-2" E 0.020 5'-7" 5'-7" `. 0.025 7'-3" 7'-3" i 0.032 9'-2" 9'-2" S 0.040 10'-10' 10'-10' 1( Steel 0.018 7'-2" 7'-2" i 0.020 4'-11" 4'-11" 4 0.025 6'-7" 6'-7" f 0.032 8'-4" 8'-4" t 0.040 9'-11" 9'-11" 9 Steel 0.018 6'-4" 6'-4" E Carl Putnam, P. E. 3441 Ivylink Place Lynchburg, VA 24503 carlputnam@comcast.net MAR R M Irl C , WAIN i Tl EXPIRES The manufactured home wall does not meet 2006 IRC prescriptive brace wall requirements. A separate wall meeting R602.10.6. 3&4 or Washington State Labor & Industries approval is required at the footing inspection. Driveway Approach Deviations, relocations or alter- ations to existing or designated driveway approaches in subdivisions will require a right of way permit address- ing storm water engineered configuration and sizing. PROVIDE DIAGRAMS AND E'�GINEERING LAYOUTS FOR 12,_)C)F TRUSS)FS. BEAMS AND f i UOR S%'�',MS PRIOR TO FRAMING CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REV0,'V P F �F SOF PLIANCE Sf''KAiIE `fit; 1�lVISIOC�