Loading...
2008, 03-19 Permit App: 08000866 GarageProject Number: 08000866 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/19/2008 Page 1 of 2 Project Information: Permit Use: NEW GARAGE ATTACHED TO MANUFACTURED HOME Contact: MISSION MEADOWS LLC Address: 15918 E CAMERON CT C - S - Z: SPOKANE VALLEY, WA 99037 Setbacks: Front Left: Right: Rear: Phone: (509) 953-3923 Group Name: Site Information: Project Name: Plat Key: Name: MISSION MEADOWS MHP MFG HOME PK 123 UNITS District: East Parcel Number: 55083.9066 SiteAddress: 1804 N HODGES LN Location:: CSV Block: Lot: Owner: Name: MISSION MEADOWS LLC Address: 15918 E CAMERON CT SPOKANE VALLEY, WA 99037 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 11.74 Acres Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 3/19/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 3/13/2008 By: mpalaniuk Perm its: r; riga T. = Operator: jmm Printed By: jmm Print Date: 3/19/2008 • Project Number: 6 Inv: 1 Application Date: 3/19/2008 Page 2 of 2 CITY OF B Spokane THIS IS NOT A PERMITUILDING DIVISION be assessed for commencing WQV tt Suite B-3 40.0"idler Spokane Valley, WA 99206 Building Permit Contractor: OWNER Firm: OWNER Description Grp Type Notes GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Notes: Payment Summary: Permit Type Building Permit Phone: (000) 000-0000 This Application: Total Project: Sq Ft Valuation Su Ft Valuation 552 $10,488.00 552 $10,488.00 Totals: 552 $10,488.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: 552 $10,488.00 Fee Amount $195.25 $48.81 $4.50 $248.56 marigmangazweigimespamissmotiau4 Fee Amount Invoice Amount Amount Paid Amount Owing $0.00 $248.56 $248.56 $248.56 $248.56 $248.56 $0.00 $248.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 3/19/2008 H` P.w: ' BY Opt/Italie Spokane Valley, WA 99206 CITY OF SPOKANE VALLEY PERMIT FEE: D Q r,�^ (509)688-0036 FAX: (509)688-003 A - LOY 40# www.spokanevalley.org ) - ^.ommunity Development tesidential Construction Permit Application . [1 CENTER n ❑ Accessory Bldg ❑ Addition/Remodel ❑ Deck M Other: (- g e SITE ADDRESS: / 00 51 AL Ad, Ps r . ASSESSORS PARCEL NO: 5003.90 4:6 LEGAL DESCRIPTION: Id 2ofl;.5)011 ike#46I05 Mf/P Building Owner: Name: f I55i)rr //124tetdlt3.S La-- Address: /j, 61/nem", of_ City: 5s/4004 way State: wo Zip.03 7 Phone: 5D9-953-N23 F ":5W -9z7 -6757 Contact Person Name: ` 2i64aa i Wi6iSdin Phone: 5oy_95-3-3q 2.3 - Describe the scope of work in detail: Contractor: DIM NSION ��� # OF STOP 5: �}- Name: oleh MAIN FLOOR TO SQ. FTG: /S4 N� 2 FLOOR SQ. FTG: N Address: SURFACE IMPERVIOUS SU C AREA: FINISHED BAMENT SQ. FTG: City: State: Zip: Phone: Fax: ON TYPE: CONSTit �T�rIt Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ /pod Coy 5'h 90verye aJdL / 7D Oldifre,4rAt1d 4 Proposed Use: Ee$/A,,w// **************The following MUST be complete: (write N/A:if not applicable)********************** HEIGHT TO PEAK: DIM NSION ��� # OF STOP 5: �}- TOTAL HABIT LE SPACE: MAIN FLOOR TO SQ. FTG: /S4 N� 2 FLOOR SQ. FTG: N UNFIN BASEMENT SQ. FTG: Pk SURFACE IMPERVIOUS SU C AREA: FINISHED BAMENT SQ. FTG: GARAGE SQ: FTG: S— DECK/COV. PATIO SQ. FTG: /U4 30% SLOPES ON PROPERTY: NO - # OF BED NO,jNS: ON TYPE: CONSTit �T�rIt HEAT SOURCE: SEWEF��� � The permittee verifies, acknowledges and agrees by their signature that. 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Pemiit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 1!15!07 0 Check ❑ Mastercard Expires: DATE: ❑ VISA VIN#: /4 ZC26 6 Spokane _.. Val ley For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. r> I Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction. meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Stioliane PERMIT CENTER 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 509-688-0036; Fax 509-688-0037 www.spokanevalley.org Affidavit in Lieu of General Contractor Registration State of Washington ) County of Spokane ) , state as follows: (Print name as signed) 1. I have made application for a building permit from the City of Spokane Valley, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under RCW 18.27.090, a copy of which is printed on the reverse side of this affidavit. 3. I understand that prior to issuance of a building permit for work that is to be done by any contractor, the City of Spokane Valley must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Spokane Valley of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this building permit to be exempt under No. , and will therefore, not be performed by a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. APPLICANT' S SIGNATURE Sigged and sworn to before me this Day of /J44204. .YW\l Notary's Name (Print) Signature NOTARY PUBLIC in and or the Stateof Washington, residing at�i r ai +cCounty My Commission expires:C( (CT I October 15, 2007 Page 1 of 2 P:\Community Development\Forms\Building Forms HODGES LANE • 19 PLANNING DEPT. APPROVED BY. DATE: 3//3/bo0' LOT 20 1804 N. Hodges Lane North Scale: 1" = 20' Resident approval of site plan Signature date del *a by FUUNUA 1 tUN FLAN PLEASE COMPLETE THE FOLLOWING INFORMATION AND ADD ON THE DRAWING BELOW. BUILDING DIMENSIONS: 2:31)(2q/ GARAGE OPENING AND HEADER SIZE: /7.0Y.> 1 /$/ ?C,' P.9 %u 4mi INDICATE THE LOCATION AND SIZE OF ALL WINDOWS AND DOORS ON THE PLAN. h• w J fi$72 �- dad v' I I 6'X``PRO ECTION AND O EN:NGS BETWEEN . { Dorn/ DWELLING AND PRIVATE GARAGE SHALL HAVE: QQQ 1 1) MATERIALS APPROVED FOR ONE HOUR FIRE RESISTIVE CONSTRUCTION ON THE GARAi SIDE: ❑ 5/8" TYPE "X" GYP BOAR(, ,H ITABLE SPACE ABOVE) OR ❑ 1/2" GYP BOARD (RESIDE NC ATTIC. FLOOR/CEILING) • D RESIDENCE SHALL BE 2 UPENIDGS BETWEEN GARAGE EQUIPPED WITH SOLID WOOD DO R, SOLID OR HONEYCOMB CORE STEEL DOORS NOT LESS THAN 1 8 OR 20 MINUTE FIRE RATED DOORS. L4 rt., CONCRETE TO COMPLY TO IRC TILE 404.1.1(1) ea „ Jty 0 FLiulvuATIUN VvALLS - 3000 # P I S e • SLABS, GARAGES, CARPORTS doo1, & PORCHES - 3500 # PSI NO ALL FOOTING MUST BE CONTENIOUS rye( -4(- E4avt0E51& Mtn a, 2_,X L �,... . -..-- Please note that while every effort is made to assure the accuracy of the information contained in this brochure is not warranted for accuracy. This document is not intended to address all aspects or regulatory requirements for a project and should serve as a starting point for your investigation. For detailed information on a particular project, permit, or code requirement refer directly to applicable file and/or code/regulatory documents or contact the appropriate division. R602.10.4 Brace Wall Panel min. 48 in.— 96 in. R602.10.6.1 Alternate Brace Wall Panel min.28in.-42in. R602.10.6.2 Alternate Brace Wall Panel min.16in.-24in. Engineered Shear Wall Bracing The manufactured home wall does not meet 2006 IRC prescriptive brace wall requirements. A separate wall meeting R602.10.6. 3&4 or Washington State Labor & Industries approval is required at the footing inspection. 1 orurv-kPvc Vt-ELLE 1 DutLUII' .i UtVAN I M N 1 11707 E. Sprague Avenue #106 Spokane Valley, Washington 99206 - Tet 509-688-0036 - Fax 509-688-0037 Following is a typical cross-section for a residential garage_. It may not represent the proposed project if you are using this de8 as a por5on of your plan submittal, please complete the requested information in the bons provided on both sides of this sheet This completed sheet, along with any additional information needs to be submitted with your ap(ficafion and be on site at the time of inspec5on. PROTECTION AND OPENINGS BETWEEN DWELLINGS AND PRIVATE GARAGES SHALL HAVE: 1) MATERIALS APPROVED FOR ONE HOUR FIRE RESISTIVE CONSTRUCTION ON THE GARAGE SIDE: ' 5/8' TYPE 'X' GYP BOARD (HABITABLE SPACE ABOVE) ' 112" GYP BOARD (RESIDENCE/ATT1C, FLOOR/CEILING) 2) OPENINGS BETWEEN WEEN GARAGE AND RESIDENCE SHALL BE EQUIPPED WITH SOLID WOOD DOOR. SOLID OR HONEYCOMB CORE STEEL DOORS NOT LESS THAN 1 318`, OR 20 MINUTE FIRE RATED DOORS. ALTERNATE FOUNDATION FOR ACCESSORY BUILDINGS FROM 400 SQ. FT. TO 3000 SQ. FT. SECTION A -A NOTE Diagonal wall bracing required on each comer and every 25 feet of wall. Wails within 3 feet of a property line or within 6 feet of a dwelling must be 1 hour rated. (518' type X gypsum sheathing on both sides of watt). Openings are not permitted in these walls. Garages over 3,000 sq. ft require protec5on when closer than 20 feet to the property tine. Parapets may be required. ENGINEERED TRUSS -E + SPACING @ z yA0.c. Mr ROOFING MATERIAL 15 ROOFING PAPER �ROOF 3L SHEATHING 4•,ur c S SOLID BLOCKING - BETWEEN.TRUSSES M�n1 3/g WALL SHEATHING 24" MIN. SIDING 1 DOUBLE TOP PLATE WALL HEIGHT - 2x @ / � O.C. PRESSURE TREATED SOLE PLATE 3-1/2' CONCRETE SLAB 4 6"x12' FOOTING i ANCHOR BOLTS 125:9- MIN. (T' INTO CONCRETE) 6' O. C. OR APPROVED ANCHOR INSTALLED PER MANUFACTURER. i HODGES LANE 531 LOT 20 1804 N. Hodges Lane North Scale: 1" = 20' Resident approval of site plan Signature date PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED Fri' '' `.°F COMPLANCE SPOK r F ` to !Mg • ' ``1-3!--(°�- ..-