Loading...
2014, 04-22 Permit: SW-14000482 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000482 Permit Issued Date: 04/22/2014 Expiration Date: 04/22/2015 Project Description: SEWER CONNECTION Primary Contact: H & S CONSTRUCTION Phone: 509-926-8964 Applicant: H & S CONSTRUCTION Address: 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 Phone: 509-926-8964 Email: SITE INFORMATION: Site Address: Parcel Number: 9321 E HOLMAN RD 44052.0506 Assessor's Description: 05-24-44 LT 1 BLK 1 JOHNSTONE ADD & PTN GOVT LT 8 DAF; BEG AT SW COR LT 1, TH S41 DEG 59MIN 10SDS W ALG NLY R/W HOLMAN RD 37FT, TH N22DEG 59MIN 15SDS W PARA WITH WLY LN LT 1 20FT, TH NO2DEG 23MIN 5 Inspection Area: : (509)-477-3675 Owner: KOSMICKI, MICHAEL R & TINA J Address: 9321 E HOLMAN RD SPOKANE, WA 99206 Phone: Email: Water District: Spokane County Water Fire District: Fire District 8 District #3 Zoning: Land Area: 48336 Square Feet CONTRACTOR INFORMATION: HSCON"123KF, Exp. 05/08/2015 H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 CONDITIONS: Possible Stream On Site Inside Public Transit Benefit Area DRYLINE PREVIOUSLY INSTALLED CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 04/22/2014 14:01:03 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000482 Permit Issued Date: 04/22/2014 Expiration Date: 04/22/2015 SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/22/2014 14:01:03 Project Coordinator: Dawn Dompier