2014, 04-22 Permit: SW-14000482 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000482 Permit Issued Date: 04/22/2014
Expiration Date: 04/22/2015
Project Description: SEWER CONNECTION
Primary Contact: H & S CONSTRUCTION
Phone: 509-926-8964
Applicant: H & S CONSTRUCTION
Address: 11817 E VALLEYWAY
SPOKANE VALLEY, WA 99206
Phone: 509-926-8964
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
9321 E HOLMAN RD
44052.0506
Assessor's Description: 05-24-44 LT 1 BLK 1 JOHNSTONE ADD & PTN
GOVT LT 8 DAF; BEG AT SW COR LT 1, TH
S41 DEG 59MIN 10SDS W ALG NLY R/W HOLMAN
RD 37FT, TH N22DEG 59MIN 15SDS W PARA
WITH WLY LN LT 1 20FT, TH NO2DEG 23MIN 5
Inspection Area: : (509)-477-3675
Owner: KOSMICKI, MICHAEL R & TINA J
Address: 9321 E HOLMAN RD
SPOKANE, WA 99206
Phone:
Email:
Water District: Spokane County Water Fire District: Fire District 8
District #3
Zoning: Land Area: 48336 Square Feet
CONTRACTOR INFORMATION:
HSCON"123KF, Exp. 05/08/2015
H & S CONSTRUCTION
11817 E VALLEYWAY SPOKANE VALLEY, WA
99206
509-926-8964
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
CONDITIONS:
Possible Stream On Site
Inside Public Transit Benefit Area
DRYLINE PREVIOUSLY INSTALLED
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 04/22/2014 14:01:03 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000482 Permit Issued Date: 04/22/2014
Expiration Date: 04/22/2015
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/22/2014 14:01:03 Project Coordinator: Dawn Dompier