2009, 02-03 Permit App: 09000186 Patio Cover•
Project Number: 09000186 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/3/2009 Page 1 of 2
Project Information:
Permit Use: ADD 13 X 14 PATIO COVER TO NEW HOUSE Contact: CONARD CONSTRUCTION
Address: 223 N LINDEBLAD LN
C - S - Z: LIBERTY LAKE WA 99019
Setbacks: Front Left: Right: Rear: Phone: (509) 599-8454
Group Name:
Site Information: Project Name:
Plat Key: 005859 Name: RIVERWALK 08TH ADD PUD
District: East
Parcel Number: 55083.5110 Block: 2
SiteAddress: 2005 N HODGES LN
Lot: 10
Owner: Name: PECK, PATRICK J & HEIDI S
Address: 2005 N HODGES LN
Location:: CSV SPOKANE VALLEY, WA 99016-858
Zoning: R-4 SF Res Urban District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 7,725 Sq Ft Width: 70 Depth: 110 Right Of Way (ft): 35
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: �.. .
Review
Building Plan Review
Released By:
Originally Released: 2/2/2009 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 2/3/2009 By: cjjanssen
Operator: jmm Printed By: JD Print Date: 2/3/2009
Project Number: 09000186 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/3/2009 Page 2 of 2
Building Permit
Contractor: CONARD CONSTRUCTION Finn: CONARD CONSTRUCTION
Address: 223 N LINDELAD LN Phone: (509) 599-8454
LIBERTY LAKE WA 99019
This Application: Total Project:
Description Gra Tvpe Notes Su Ft Valuation Sq Ft Valuation
COV DECK R-3 VB 13 X 14 240 $3,600.00 240 $3,600.00
PATIO
COVER
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes:
Payment Summary::,;
Permit Type
Building Permit
Totals: 240 $3,600.00 240 $3,600.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$97.25
$4.50
$38.90
$140.65
Fee Amount Invoice Amount Amount Paid Amount Owing
$140.65 $140.65
$0.00 $140.65
$140.65 $140.65 $0.00 $140.65
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD
Print Date: 2/3/2009
Spokane
. Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www. spokanevalley. org
1
PERMIT NUMBER: 2- ( /3 (7
PERMIT FEE:
New Construction
Addition/Remodel
Other:,
Accessory Bldg
Deck
SITE ADDRESS:
?_0 /1at e
ASSESSORS PARCEL NO: SSC. 3_ S //D LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS:
/ ' x /i'
# OF STORIES:
/
TOTAL HABITABLE SPACE:
A.A
Name:
i
k
IMPERVIOUS SURFACE
AREA:
7 yO
Address: ,77.,,>
GARAGE SQ. FTG:
/v.,, d ci. 47_ s5
(/
City:
State:
State.
Zip:
Phone: S..
Fax:
` C/?2,Fax:
.,.S,--\=.*- 7,/ % ?
Contact Person
Name: \jU n .ti; : )4N 1'
Phone: 3, ; — 'raj -
Describe the scope of work in det
Contractor:
DIMENSIONS:
/ ' x /i'
# OF STORIES:
/
TOTAL HABITABLE SPACE:
A.A
Name: u,j ,/c,,c
.c� �v
_
IMPERVIOUS SURFACE
AREA:
7 yO
Address:
GARAGE SQ. FTG:
DEC COV. PATIO SQ. FTG:
Z )
(/
City: L 0, ,,_
State:
HE T SOU
Zip: ??6, i n
Phone: 7 ? S'' -(Z- `i
moo'
Fax:
3,
.,.S,--\=.*- 7,/ % ?
Contractor Lic No:
�.1° .>, //t) a.
Exp Date:
7 , ' C •sn
3'h /7/7--)
City Business Lic. No:
Cost of Project: $ /8 O0 9.2
-17,D C vee -7-27 Bch /4l0
Proposed Use:
P ri
o, .
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: ti
%y '
DIMENSIONS:
/ ' x /i'
# OF STORIES:
/
TOTAL HABITABLE SPACE:
A.A
MAIN FLOOR TO SQ.
FTG:
2NU FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
7 yO
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DEC COV. PATIO SQ. FTG:
Z )
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HE T SOU
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of P. • ment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check ❑ Mastercard
Expires:
DATE: //'o/�y
El VISA
VIN#:
Spokane
.,•••*Val1ey
For City Use Only
PLUS Project Number /6(O
Project Address ) 1 11�. 67
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
N 90° 0 0" W 70.00'
REAR
in
I0
(5" YARD
JEW 2276 SQ FT 2 STORY SFR ON EXISTING 901 SQ FT 7
PeoP0.5 ,
FOUNDATION
/3'xie?' PRrip
i•—"- I
iy ei
INTERIOR
SIDE
YARD
/71,91v-43
I 1-11
b
' b
7-12.0' J z
0
0
FRONT
YARD
EXISTING CONCRETE
DRIVEWAY
N 90° 0' 0" 70.00'
ENCACLI,O.
PATE:
2% SLOPE
PLOT PLAN
SCALE : 1" = 20.00'
REBUILD EXISTING 477 SQ F
GARAGE
INTERIOR
SIDE
YARD