Loading...
2012, 10-17 Permit: SW-12002401 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002401 Permit Issued Date: 10/17/2012 Expiration Date: Project Description. Project Name: Permit Type: SEWER CONNECTION W PONDEROSA SEWER Primary Contact Applicant. Address. Phone Email: H & S CONSTRUCTION H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessors Description. Inspection Area: Zoning: 9403 E HOLMAN RD 44052.0502 JOHNSTONE ADDITION JOHNSTONE ADD L2 81 Water District: Spokane County Water District #3 Owner: Address Phone: Email WHITE, T M&CA 9403 E HOLMAN RD SPOKANE, WA 99206-9248 Fire District. Fire District 8 Land Area: 44492.1 Square Feet CONTRACTOR INFORMATION: General Contractor HSCON**123KF H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 DETAILS' Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Possible Stream On Site Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed. 10/17/2012 11:29:17 Printed by: IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002401 10/17/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8.30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER 15 RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed. 10/17/2012 11.29.17 Printed by: 115 APPPOOLWSP.NET v4 0