Loading...
2013, 03-13 Permit: SW-13000206 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000206 Permit Issued Date: 03/13/2013 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION W PONDEROSA II JEFF S LENZ CONSTRUCTION INC 509-869-2079 Applicant: JEFF S LENZ CONSTRUCTION INC Address: Phone: Email: PO BOX 483 DEER PARK, WA 99006 509-869-2079 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description Inspection Area: Zoning 10509 E HOLMAN RD 44051.1504 ILLER FIRST ADD L4 B1 :(509)-477-3675 Owner: Address: Phone: Email: Water District: Spokane County Water District #3 JORDAN, BRIAN F & MISTY E 10509 E HOLMAN RD SPOKANE, WA 99206 Fire District: Fire District 8 Land Area: 39312 Square Feet CONTRACTOR INFORMATION: JEFFSSL962D6, Exp. 04/07/2014 JEFF S LENZ CONSTRUCTION INC PO BOX 483 DEER PARK, WA 99006 509-869-2079 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Pnnted: 03/13/2013 10:56:26 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000206 Permit Issued Date: 03/13/2013 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/13/2013 10:56:26 Project Coordinator: Dawn Dompier