Loading...
2013, 11-18 Permit: SW-13002061 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13002061 Permit Issued Date: 11/18/2013 Expiration Date: 11/18/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION W PONDEROSA II NORM'S EXCAVATING INC 509-928-0580 Applicant: NORM'S EXCAVATING INC Address: Phone: Email: tina@normsexcavating.com PO BOX 30873 SPOKANE, WA 99223 509-928-0580 SITE INFORMATION. Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 10519 E HOLMAN RD 44051.1505 ILLER FIRST ADD L5 B1 :(509)-477-3675 Owner: Address: Phone: Email: Water District: Spokane County Water District #3 PEPLINSKI, JASON & KRISTINA 10519 E HOLMAN RD Spokane Vly, WA 99206-9285 Fire District: Fire District 8 Land Area: 39312 Square Feet CONTRACTOR INFORMATION' NORMSEI972BM, Exp. 02/06/2015 NORM'S EXCAVATING INC PO BOX 30873 SPOKANE, WA 99223 509-928-0580 ti na @n o rm sexcavati ng. coni DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. Date Printed: 11/18/2013 12:23:09 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13002061 Permit Issued Date: 11/18/2013 Expiration Date: 11/18/2014 THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Pnnted: 11/18/2013 12:23:09 Project Coordinator: Dawn Dompier