Loading...
15-062.03 Inland Asphalt Company: Mansfield Ave Connection j5-v(oz . o3 J. soorkaidole\a.,, CHANGE ORDER NO: 3 DEPARTMENT OF PUBUC WORKS CONSTRUCTION CONTRACT NO: 15-062 PROJECT: Mansfield Avenue Connection Project CONTRACT DATE: 7/14/2015 PRIME CONTRACTOR: Inland.Asphalt Company CIP NO: 156 DESCRIPTION OF CHANGES This Change Order pertains to Bid Schedule: A This Change Order pays for the following revisions to Swale A located at the SW corner of the Mansfield Ave&Houk Rd intersection: increases the height of the segmental concrete retaining wall 8 inches on the SW side of the swale; places a 6 inch thick controlled density fill cap over an existing underground power line on the NE side of the swale;adds a segmental concrete retaining wall on the NE side of the swale; adds embankment as fill behind the new wall on the NE side of the swale; revises the sodding area limits; and replaces Rug Juniper plant selection with a Periwinkle(Vinca minor)plant selection. The changes are shown on the attached 8/31/15 Stormwater plan sheet 12. Item No. Description Unit Quantity Unit Price Total CO3.1(A) FORCE ACCOUNT WALL EXCAVATION,SWALE EST 1 $ 1,400.00 $ 1,400.00 EMBANKMENT&CDF CAP CO3.2(A) CONCRETE BLOCK RETAINING WALL SF 140 $ 38.00 $ 5,320.00 CO3.3(A) PLANT SELECTION,BLUE RUG JUNIPER,1 GALLON EACH (45) $ 37.00 $ (1,665.00) CO3.4(A) PLANT SELECTION,PERIWINKLE, 1 GALLON EACH 45 $ 37.00 $ 1,665.00 CO3.5(A) IRRIGATION SYSTEM REVISION EACH 1 $ 270.00 $ 270.00 CO3.6(A) TOP SOIL,TYPE B SY 37 $ 9.00 $ 333.00 CO3.7(A) SOD INSTALLATION SY 37 $ 14.00 $ 518.00 Total Amount of this Change Order(incl.Tax): $ 7,841.00 PHYSICAL COMPLETION Original Contract Working Days: 30 Revision By This Change Order: Revisions by Prior Change Orders:_ _ 3_.,.,._. Total Revised Contract Working Days: CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 516,455.00 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(through CO#2) $ 8,971.10 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 525,426.10 NET THIS CHANGE ORDER_ . ..._ 7,841.00 TOTAL CONTRACT AMOUNT INCLUIrIII�IG HI- . NOE DER $ 533,267.10 CONTRACTOR ACCEPTANCE: DATE: /-� �.S The contractor hereby accepts this adjustment u /d the to, s of Section 1-04.4 of the original contract. RECOMMENDED BY: DATE: 9•✓//5-- Project Manager APPROVED BY: A/1 DATE: p/��� Public works Director APPROVED BY: /VA DATE: City Manager ATTACHMENTS: Stormwater plan sheet 12,revised 8/31/15. Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor,PW Project File,Project Inspector,Finance Department COSY Farm 915;2014