2010, 06-08 Permit App: 10001636 Pole BldgProject Number: 10001636 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/8/2010 Page 1 of 2
Project Information:
Permit Use: NEW 30 X 24 POLE BLDG Contact: BOYLE, KELLY 0
Address: 1007 S HOUK RD
. C - S - Z: SPOKANE VALLEY, WA 99216 -
Setbacks: Front Left: Right• Rear: Phone: (509) 448-1745
Group Name:
Project Name:
Site Information:
Plat Key: 999999 Name: Range
District: Sout
Parcel Number: 45223.9222 Block:
SiteAddress: 1007 S HOUK RD
Location:: CSV
Zoning: R-3 SF Res District
Water District: 011 MODERN
Lot:
Owner: Name: BOYLE, KELLY 0
Address: 1007 S HOUK RD
SPOKANE VALLEY, WA 99216 -
Hold: ❑
Area: .91 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
6/8/2010 By: TMELBOU
Released By:
Originally Released: 6/7/2010 By: cjjanssen
Permits•
Operator: jmm Printed By: JD
Print Date: 6/8/2010
Ptoj ect Number: 10001636 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/8/2010 Page 2 of 2
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp ho Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB PLAN 720 $13,680.00 720 $13,680.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 720 $13,680.00 720 $13,680.00
Units Unit Desc Fee Amount
1 SELECT $237.25
1 SELECT $59.31
1 SELECT $4.50
Permit Total Fees: $301.06
Notes •
ALL RESIDENTIAL DRIVEWAYS MUST BE PAVED PRIOR TO FINAL INSPECTION PER
SVMC 19.40.020(B)
Payment Summary
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $301.06 $301.06 $52.31 $248.75
$301.06 $301.06
$52.31 $248.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD
Print Date: 6/8/2010
Permit Center ! I
Sa 11703 E Sprague s ite B-3
pcmOkaile•. •.ne iajlc , WA 9�c06
r ley,E05,„, ty;nr'dB FAX: (5 9)688-0037
Community Development _
Residen
Permit
ial CoglfitiF
plic/atio
hionle
PERMIT NUN140(03/0
PERMIT FEE:
ElNew Construction Accessory Bldg
P1 Addition/Remodel ❑ Deck
n Other:
SITE ADDRESS: (00 F 5 Watt (' .o s/om/,(4e- CO,- c7 2 / aP
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Buildiri'Owner:' rur"rr`
"dale, v��, ,..- _
Coniriiiii:a t'Ft:+i:, 'a
r-hz4::t_ a.... ..
Name: I/(id (r, 90L?
Name:
Address:tw .(
so (Dolt_ t) u2
Address:
Zip:, -,7(0
City: 4,0e -State: / A-
City: State: Zip:
Phone:_ , cute_ (7 y . Fax:
Phone: Fax:
DECK/COV. PATIO SQ. FTG:
Contractor Lic No: Exp Date:
'C0I1tatt'Pei'soil` _7 ' ^",'., ;• -'2-;` 4:= :.`.
CONSTRUCTION TYPE:
City Business Lic. No:
SEWER OR SEPTIC?
Name: //elf goy le
Phone( Co@2 70 - (0'82°
DesC,ribe the scope of wqrk in detail:
Ruvclarkt5 cc 3a K Zreaso m1401N9
efe-wt ILtt f dU 14,Ac[r 4✓L9
Cost of Project: $
5300. "
Proposed Use: S itc1 j cit e- — ea -VAC ln/5
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK.
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2"D FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE Q. F-14.7_,,,, :
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verges, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the Ci of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Ce er 5) This Ci of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordin. es. 6) Plan additional information may be required to be submitted, an subsequently approved before
this application can be
SIGNATURE:
Method of Pay
❑ Cash
Bankcard #:
essed.
Authorized Signature:
REVISED 2115/07
❑ Mastercard
Expires:
DATE: 6
❑ VISA
VIN#:
70
Spokane
Valley
For City Use Only 2"
PLUS Project Number ('0- I ( 3I
Project Address / 00. ''':(t..10(/.1i..i
.11703 E Sprague Ave:Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 4 Fax: 509.688.0037 • •permitcenterC�spokanevey,o
allrg
As part of our on-going cornmitment • to customer service during .the,review process of; your', project;
application, We 'ate providing you with a TARGET DATE for the initial technical application review.lf for_
any reason we'cannot meet this date, we will contact you witha revised target date:
Your application review TARGET DATE is
The TARGET DATE -is the date we estimate your project application‘wiiihave :had its initial: technical
review. It is not the date for approval or permit issuance.
1
• Tips for a'Smoother Project-Application'Revicw2'
i; Submit complete; accurate plans and ducimtents;•,- "- -
Es7ru time May be 1egtiired_Jar're-.ruhniittals a.s• prcject application' rycieti-c/',.1101 01)-irntltipleiipp/icmiorr.c and it,.;
may he several dais before 1hev-ccin look bi rain new or revised informatibm. ,
'. Designate a'specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the Ciii can he`changed, one.`i/uiividual with the
expertise for dealing with rerieirer comments.would be the best choice Jou the entire r'es lett process:
Call staff regarding the status bf your project only after the target date shown at the'top of the_ page., ;
•
Although you should he contacted on 61. by the target date, please Jeel,free to eoniact rte .11: J.611 Haven't he.ai•d.fivnii us.
by tour huge/ dare. Staff may comae; ion before the' tat gel date if i/o Miiial review is coinplete.'Bi /bllouing'thi.r ,
procedure, rat will sen -c time and'allnw the reviewers to complete the work /770/e' ecpeditioush_.;,:_ ,. ;: - ' '
Steps in the Permit Process
1, Counter Complete, .Your application has been' accepted : as' counter. cotilpletci This ineans all of the required.
documents, as indicated on your Pre -Application C'hecklisrhave.been'subniitted•or,:haNre been„approved •.for, .deferred
submittal. This does not prevent technical staff from requesting' additional information as.a result 01 their technical res iehv:
2, Quality Check, The next step in the process,is a quality check to make.siuc that theeapplication,is restt.ss ble and free' .
from substantive flaws that would prevent technical staff from completing the techincal'rcviesi once it is started:, When
this step is complete: your: -be routed to the appropriate'sthlf•arid,remain in their reoieW queue until it:
conte', up 1or.review. .
3, Technical Compliance: Once .an applicatipti is administratively complete; it is routed to technical staff• tor',coinpliaticc
review. Depending on' the type', of project, technical,staff May include;innItiplc•reviewers:.You should be contacted by.
phone, fax, entail, or mail•by your TARGET DATE once,the initial technical compliance'review is cote' plete, • -
4, Permit Issuance, When the technical compliance review'of the application, is complete; ineluding'any subsequent re-
subntinals, each reviewer will approve their section of the application and ro,ute•i1 to the Permit Center:.Wher all sections
of the application are received, a Permit Specialist s��ill process the application int contact the' person_specilied on yOur
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be, prihvided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE '
REV 9/07
/-tovK- &St
•
l j l (beet !TNA L
VY\ LT E
,pcDHES it1c5c b
i jys, e.:r cNI sv C
•
19-ID.0204/94
0
PLANNING DEPT. APPROVED
BYArli1 all .0 a_daw
DATE• 69)71 10
Lie Z
900-46t
RECEIVED
•CSV PERMIT CENTER
Project #.
Name
Submittal #
4
1n