Loading...
2011, 10-14 Permit App: 11003247 GarageProject Number: 11003247 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: CONSTRUCT 2 -CAR 720 SF DETACHED GARAGE Contact: STATUS BUILDERS Address: 4010 E 19TH AVE C - S - Z: SPOKANE WA 99223 Setbacks: Front Left: Right: Rear: Phone: (509) 535-8169 Group Name: Site Information: Project Name: Date: 10/14/2011 Page 1 of 2 Plat Key: 000915 Name: GAILS PARK EST District: Sout Parcel Number: 45273.3501 Block: SiteAddress: 2405 S HOUK RD Location:: SPO Lot: Owner: Name: MCLAUGHLIN, JEFF Address: 2405 S HOUK RD SPOKANE, WA 99206 Zoning: R-2 SF Res Suburban District Water District: 100 SPO CO WATER DIST#3A Hold: ❑ Area: .00 Acres Width: 100 Depth: 125 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Other Reviews Originally Released: 10/13/2011 By: tmelbourn Released By: CITY LICENSE NEEDED & CERTIFICATE OF LIABILITY INSURANCE Landuse/Zoning/HE Conditions Released By: Driveway/Approach Permits: Originally Released: 10/12/2011 By: mharnois Released By: Originally Released: 10/14/2011 By: RPEGRAM Operator: MBB Printed By: JD Print Date: 10/14/2011 Project Number: 11003247 _ Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/14/2011 Page 2 of 2 Approach Contractor: STATUS BUILDERS INC Firm: STATUS BUILDERS INC Address: 4010 E 19TH AVE Phone: (509) 535-8180 SPOKANE WA 99223 Building Permit Contractor: STATUS BUILDERS INC Firm: STATUS BUILDERS INC Address: 4010 E 19TH AVE Phone: (509) 535-8180 SPOKANE WA 99223 This Application: Total Project: Description Grp Type Notes So Ft Valuation Sq Ft Valuation GAR WOOD U-1 VB 720 $13,680.00 720 $13,680.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 720 $13,680.00 720 $13,680.00 Units Unit Desc Fee Amount 1 SELECT $237.25 I SELECT $59.31 1 SELECT $4.50 Permit Total Fees: $301.06 Notes: * Saw cutting of existing curbto create an approach is not allowed within the City's jurisdiction. Driveway is to be inspected buy the City's ROW Inspector prior to concrete placement. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $301.06 $301.06 $59.31 $241.75 $301.06 $301.06 $59.31 $241.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: MBB Printed By: 3D Print Date: 10/14/2011 Spokane .FValley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.org (Staff Use Only) l PERMIT NUMBER: / -3 z-1 PERMIT FEE: 3 RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION E? ADDITION/REMODEL /.' ACCESSORY BUILDING ® DECK 0 OTHER SITE ADDRESS: Z0-() 5 Hou K St ASSESSORS PARCEL NO.: 442:13 , p LEGAL DESCRIPTION:6-Ai lrc; Pi -2k ,k L1- Usr ) BUILDING OWNER NAME: fit h r Q c y M G( A_i 64.1 1 N( NAME: 1_11.E.rC-I-1 -i 1.\.( ADDRESS: CITY. ) kiS.Y \}' 33At_L .S= Q PHONE: 5 89 o 9 ._. 1 0'7 op, FAX: G I _95)3 ,../ L/ 2_ CELL: CONTACT;NAME: ALL NS DiAe(Lo b -p STATE: WA( ZIp: 99 2-t PHONE: FAX: CELL: CONTRACTOR NAME: P*ALkJb rL t{�- MAILING ADDRESS: TlJ 1 0 E , . Ht 1'h- CITY: cSPn k1].VJ e PHONE: S(�(3/ — �j 3 ,j •— S 1 tcl� STATE: CAD at, ZIP: -al t t 2_2_3 _ _SAO p Q •-tel r FAX: � � _c3.5-_ AO CELL: 3 / ^ ('i / -'7 /D CONTRACTOR LICENSE No.: �`('A,-r-'R 1ty-,0 C EXPIRES: 7._is CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: C At2� �rAi2c-�Y� ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to t T b Dimensions: -g No. of Stories: / Total Habitable n i/Il Space: T1 f -i Main Floor Sg : V, / Upper Floor SQ FT: Unfinishec(B�aassement SQ FT: I� / Fi ished,BafAment SQ / 4- i-• Garage SQ FT: 7 z 0 Dr- Deck/Covered Patio SQ FT: a / �l Impervious Surface Area: C 70 30% Slopes on 7 Property: A/ �f, No. of, Bedrooms: /.l /4 Construction Type: Wly° Heat Source: g -L Sewer or Septic: gY,-1, TOTAL COST OF PROJECT: $ I31coo DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of Spokane valley Development code. Referen -. codes are avai able for review at the City of Spokane Valley Permit Center. 5) The City of Spokane VaileXpermit is not a permi r approve .r any violet on of federal, state or local laws, codes or ordinances. 6) Plans or additional information may eguired to pesubmi and sub :.uently a proved before this application can be processed. p_ignatlire4 ,. Date:Y 10//z /I -- Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc Si ollane 0 Valley® Target Date sheet • For City Use Only PLUS Project 1 1 " . Z tri Project Address 2t-V0C 5. 1e 54. 11703 E Sprague Ave Suite 8-3 • Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is ( d — (Zff ).' 1 i The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete, accurate plans and documents. Extra time may he required for re -submittals as project application reviewers work on multiple applications and it may he several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed. one individual with the expertise for dealing with reviewer comments would be the hest choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date Ville initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should he contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Inforination regarding fees and pre -construction meetings (if required) will he provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page I of I • Spokane e #valley - Community Development, Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spoka nevalley.o rq (Staff Use Only) PERMIT NUMBER: ( 1 —3L47 PERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: L>� (� S . J<-,(1 k /? START DATE: / v/ j q / j / ANTICIPATED COMPLETION DATE: '/I j _ ( l _ / / c l BUILDING OWNER NAME: (-_ �� p_ F-/ NV: L/�-(,(/, �. L L A MAILING ADDRESS: 211 R S . /4o CITYf ?tI \AA V al_cl STATE: LJ-) CONTACT PERSON NAME: ZIP: -J 24 L PHONE: £j0`/ — 3 c—' j i0 9 FAX.( $1- 3s^ &) CELL: 5O9-.939-070) CONTRACTOR NAME: S% f fl. S -j ti l In F'«. MAILING ADDRESS: II- CD / b t , / 9 -/-b AUe CITY: STATE: Liu 4.. ZIP: 9 9 zz3 PHONE: so`7-6-35-Oi co / FAX:SO`]^ lee CELL: c0 9- -/37-U7Ci1 CONTRACTOR LICENSE NO.:SVA-rt,l(>0`'f-a•1C, EXPIRES: 7 -i - I Z CITY BUSINESS LICENSE NO.: ._ PROJECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway Commercial/Industrial Driveway Existing Curb & Gutter El Rural Road Section C1 Culvert Installation Q Other Conditions: El Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit o proval fo any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information macbe requi ed to uubmitte nd subtkquently approved before this application can be processed. Date: / 1 1/13/,J RECEIVED CSV PERMIT CENTER QCT 1 2011 Project `12--1 Name Submittal # Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide _ ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) zI a 21 Tri Wj ZI DISTANCE FROM NEAREST PROPERTY LINE (MAY_BE LEFT OR RIGHT SIDE) I IUI FT (SEE TABLE) CONCRETE APPROACH 1-4'--{--THROATWIDTH FT WING (SEE TABU STREET NAME WING 24-4+ AUJc STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE (MAY BE LEFT OR RIGHT SIDE) EC FT (SEE TABLE) ASPHALT APPROACH CURB RETURN \IF CORNER LOT, DISTANCE FROM CURB RETURN 9 FT (SEE TABLE) 5' RADIUS EDGE OF ASPHALT I—THROAT WIDTH nFT -1 (SEE TABLE) STREET NAME STREET WITH ASPHALT EDGE RADIUS RETURN NNE CORNER LOT, DISTANCE FROM RADIUS RETURN FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) - 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' Development Engineering Valley 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 • Fax: 509.921.1008 ♦ cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 2405 S. Houk Project.No: 11-3247 Accepted Not Accepted Approach xX Building Location Paved Access Notes: Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. rho Iz51 CURS 1+_:14- _AV./',Y /Opz/ii DATE: -o L 0 PARcE a_'s' 4523 -- GAOLS ?AR K ESTI, 5L-OCk b Let LOT SIma. _I _,°4 3