Loading...
2010, 10-04 Permit App: 10003225 RemodelProject Number: 10003225 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/4/2010 Page 1 of 2 Proiect Information: Permit Use: BASEMENT BATHROOM Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Name: Range Contact: SCHOENBERG, CHAD M & ADRIENNE Address: 7 S HOLIDAY RD C - S - Z: GREENACRES, WA 99016 Phone: (509) 327-4376 Group Name: Project Name: District: East Parcel Number: 55202.2317 Block: SiteAddress: 7 S HOLIDAY RD Location:: CSV Lot: Owner: Name: SCHOENBERG, CHAD M & ADRIE Address: 7 S HOLIDAY RD GREENACRES, WA 99016 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 9,062 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Permits: Released By: Originally Released: 10/4/2010 By: tmelbourn Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Gin Tips Notes Sq Ft Valuation Sq Ft Valuation BASEMENT R R-3 VB BATHROO 0 $4,000.00 0 $4,000.00 M Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $4,000.00 0 $4,000.00 Units Unit Desc Fee Amount 1 SELECT $97.25 1 SELECT $4.50 1 SELECT $38.90 Permit Total Fees: $140.65 Operator: JD Printed By: jmm Print Date: 10/4/2010 Project Number: 10003225 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/4/2010 Page 2 of 2 Contractor: NOBLEMAN'S PLUMBING Address: 25721 N DALTON RD DEER PARK, WA 99006 Contractor: NOBLEMAN'S PLUMBING Address: 25721 N DALTON RD DEER PARK, WA 99006 Item Description TOILETSBIDETS SINKS SHOWERS FLOOR DRAINS WATER PIPING - DWV Notes: Payment Summarv: Permit Type Building Permit Plumbing Permit Mechanical Permit Units 1 1 1 1 1 Fee Amount $140.65 $30.00 Firm: NOBLEMAN'S PLUMBING Phone: (509) 276-8985 Plumbing Permit Firm: NOBLEMAN'S PLUMBING Phone: (509) 276-8985 Unit Desc NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Invoice Amount $140.65 $30.00 Fee Amount $6.00 $6.00 $6.00 $6.00 $6.00 Amount Paid $38.90 $0.00 $30.00 Amount Owing $101.75 $30.00 $170.65 $170.65 $38.90 $131.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 10/4/2010 Spokane alley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spoka nevallev.orq (Staff Use Only) PERMIT NUMBER: *U PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ❑ NEW CONSTRUCTION .ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ DECK ❑ OTHER SITE ADDRESS: '7 SHol I �(a ( fill,'` FSCYell CL, q`n 't U0/(0ASSESSORS PARCEL NO.: SSLaZ , 23 �/ LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: Sp)oe-' bial ADDRESS: 7 V ! V 4(144CITY: I ,�*I[aliNolL�`,i3,l3 J PHONE: 5-bct 32-1 -y / /n CONTACT NAME: e r 'l.Y� FAX: �� STATE: (A...41 - FAX: \urn3Sn2t PHONE: CONTRACTOR NAME: 01_1 ,m(Ns.s CELL: zip: q D / to 50°1 615-1/ P-19to CELL: Sbq 96-z1eyq(o MAILING ADDRESS: P. 0 - j30). 3 -7 CITY:q�i 1L n PHONE: (50c) rX /U` 6SP-S CONTRACTOR LICENSE No.: 1Q0&„. *out/ CS STATE: (4 FAX: CELL: ZIP: qc cot, EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: �1�1��('Y�(iw 1 �ur►m3;N1, Ain 'i-rvsWl„v;4 t4 TN ou,L 1-711/e, tA- �,M.S �Oi gyp.vz! �S11t)uen 4r.11t. 14,4_ 1y A -{A GJ( . �0 i) A ,o,LS L iP kiAt I Sits - bi;rs d'n)iS ik�1 Som-hrne ****YOU MUST COMPLETE THE FOLLOWING**** Height to Peak: p N J r , Dimensions: �o f T X �' r No. of Stories:Total � %� Habitable ( L Space: `I lei t� Main Floor SQ FT: N Upper Floor SQ FT: Ntit Unfinished Basement SQ FT: Low Finished Basement SQ FT: Nt Garage SQ FT: a I A Deck/Covered Patio S (\ FT: ^) \ Impervious Surface Area: 30% SI pes on Property: I //6. No. of Bedrooms: (q 1 rf Construction Type: Heat Source: Cia,S Sewer or Septic: IS SPA TOTAL COST OF PROJECT: $ LI 000 1 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Effective October 28, 2007 `Pae 1 of 2 P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction PerrnPt App 10.28.07.doc Signature Date: Method of payment: D Cash 0 Check 0 Visa 0 Mastercard Bankcard #:EXP: VIN#: Authorized Signature: C.,1 SG,"�.ii371.{ effective October 28, 2007 Page 2 of 2 P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc ❑n 11 kane Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 perm itcenter(a spokaneval Icy.org Community Development Plumbing Permit Application SITE ADDRESS: 7 PERMIT NUMBER: PERMIT FEE: ❑ Commercial [ Residential bciat ru-na treA 1 - G1 c)0 f Building Owner `J Name: Phone: Fax: Chid' rj ern i Sal 1� S`D9�2� -q37(� Address: "7S // r/a J City: ��Q Y tQ State: e i y!�_ Zip: /.. L( (��� r GY Contractor Name: ma Phone: Fax: Address: '1�• 0 • \-101637 City: t 702._1L State: LOC) Zip: q0() 1.e License No:1\703Lt • oo -s City Business Lic: Contact/Project Manager: Name: Phone: # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS URINALS TUBS SHOWERS (per trap) 1 SINKS CLav/BasrnBar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat I DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate 1 ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals 1 WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ['CASH 0 CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: C171As\ SGC�01�31,t2�, P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Plumbing Permit Application 04-03-09 dg.doc jMi1ley Community Development Mechanical Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 perm itcenterlcispokaneval ley-org PERMIT NUMBER: PERMIT FEE: ❑ Commercial IN1 Residential SITE ADDRESS: / t3 1-101101 LO)1 cj 901& Building Owner t�l /1 Name:O 4 -tad V— .moi ries ZZ�►�t = � Address: l 3 ttv /'c 3 Contractor Phone: 3.2 7 _7� City:6re2 crRo Fax: State: Wit v],q_. Zip: 9, q` j j „ Name: NI o13lt mi $ Address: • .o.3ox 3) Phone@ -r e \ rr) (P _6 U S Fax: City: State: W 0 Zip: % 1oo V LicenseNoi1/4.10;1 Lk.r * no19 C S Contact/Project Manager: City Business Lic: Name: Phone: ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE VIN: P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Mechanical Permit Application 04-03-09 dg.doc #UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM q tet. HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM (each outlet) GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp -100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 - 15 hp —100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp — 1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLIANCES Under400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type ll L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE VIN: P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Mechanical Permit Application 04-03-09 dg.doc Spokane _.. Val ley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicateeviTh he City. While the person designated as the applicants contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07