Loading...
2009, 01-21 Permit App: 09000116 RemodelProject Number: 09000116 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 1/21/2009 Page 1 of 2 Project Information: Permit Use: BASEMENT FINISH Setbacks: Front Left: Right: Rear: Site Information: Plat Key: Name: Range Parcel Number: 55202.2314 SiteAddress: 21 S HOLIDAY RD Location:: CSV Block: Contact: MCDONALD, MATTHEW W & SHALLA Address: 21 S HOLIDAY RD C - S - Z: SPOKANE VALLEY, WA 99016 Phone: (605) 516-8423 Group Name: Project Name: District: East Lot: Owner: Name: MCDONALD, MATTHEW W & SH Address: 21 S HOLIDAY RD SPOKANE VALLEY, WA 99016 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Area: 7,952 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Hold: ❑ Depth: 0 Right Of Way (ft): 0 FReleased By: Originally Released: 1/20/2009 By: tmelbourn Permits: Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation BASEMENT F R-3 VB BASEMENT 0 $7,500.00 0 $7,500.00 FINISH Totals: 0 $7,500.00 0 $7,500.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $153.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW < 7999 SQ FT 1 SELECT $61.30 Operator: jmm Printed By: jmm Permit Total Fees: $219.05 Print Date: 1/21/2009 Project Number: 09000116 Notes: ,.. �,. Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 1/21/2009 Page 2 of 2 Payment Summary: Permit Type Building Permit Fee Amount $219.05 $219.05 Invoice Amount $219.05 $219.05 Amount Paid Amount Owing $0.00 $219.05 $0.00 $219.05 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 1/21/2009 Spokane jValley� Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org SITE ADDRESS: H6t PERMIT NUMBER: V C 4•-•; PERMIT FEE: `— ' New Construction Accessory Bldg Addition/Remodel Deck Other: t 1 o i h 1 vi :i '1� ,c7f Sp6YK. V ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: I . ) 1._ .- S'.,-1. I, .� (I, A (1) eh,. ( d Address: 2. I s (-io I' .J & y 2d City: ,SJ7t /6,c ,,Le Vc (l eti State:kiu Zip: 11 c i (G Phone: C 10,50- 5 i (G - 4 2...0S`^ : ( Zo%-"i-tc(-L(4 Z)3 \^�.:. Contact Person Name: Phone: CO 1 - I - 2 ti Describe the scope of work in detail: Contractor: DIMENSIONS: K1k # OF STORIES: IV ( 6 Name: DO, 1 q weTKk curs-e/17rS 2NU FLOOR SQ. FTG: LiA Address: J IMPERVIOUS SURFACE AREA: FINISHED BASE ESN 033! SQ. FTG: N I City: State: Zip: Phone: Fax: HEAT SOURCE: ,'ell-i-za k)14 Gtla-f- Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ 0 f fY1( 5111 d1q (it 1(1 vt(c KKcc cvr 3 brdi-oorvts ( I bdl roorvv 1 GVi flk ✓'ooy‘ Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: NII1, DIMENSIONS: K1k # OF STORIES: IV ( 6 TOTAL HABITABLE SPACE: tv/ MAIN FLOOR TO SQ. FTG: • �� r 2NU FLOOR SQ. FTG: LiA UNFIN BASEMENT SQ. FTG: 'j36O IMPERVIOUS SURFACE AREA: FINISHED BASE ESN 033! SQ. FTG: N I GARAGE SQ. FTG: I DECK/COV.�PATIO SQ. FTG: 30% SLOPES ON NI A # OF BEDROOMS: f I - CONSTRUCTION TYPE: hclownkr- res,,it,:rl-ta,l HEAT SOURCE: ,'ell-i-za k)14 Gtla-f- SEWER OR SEPTIC? cvi� --ewer The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: /•—%0 ❑ VISA VIN#: o-1 e .000 Valley Community Development Plumbing Permit SITE ADDRESS: Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.snokanevallev.org. Application ❑ Commercial PERMIT NUMBER: PERMIT FEE: Residential zs-Ho/Ida-4i Building Owner Name: Phone: Fax: Address: City: State: Zip: Contractor Name: Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact Name: Phone: DESCRIPTION OF WORK # OF UNITS X COST TOTAL AMOUNT 1 TOILETS WATER CLOSET, BIDETS l X $6.00 2 URINALS X $6.00 3 TUBS X $6.00 4 SHOWERS (PER TRAP) BATH, STALL, ON-SITE BUILT X $6.00 5 SINKS LAVS/BASINS, BAR, FLOOR, KITCHEN, LAUNDRY, UTILITY, JANITOR, PHOTO, X-RAY, FOOD, PREP/CULINARY MEAT I X $6.00 6 DISHWASHER X $6.00 7 CLOTHES WASHER X $6.00 8 GARBAGE DISPOSAL X $6.00 9 WATER SOFTENER X $6.00 10 ELECTRIC WATER HEATER NOTE: IF GAS, SEE MECHANICAL x $6.00 11 FLOOR DRAINS AREA, CASE, COIL, TRENCH, CONDENSATE X $6.00 12 ROOF DRAINS/OVERFLOW DRAINS X $6.00 13 FOUNTAINS, DRINKING X $6.00 14 WATER PIPING/DRAIN-IN WASTE, VENT, PLUMBING, REVERSAL NSTALLATION, ALTERATION, REPAIR, REVERSALS X $6.00 15 SEWAGE EJECTOR GRINDER, SUMP PUMP X $6.00 16 WATER USING DEVICE ICE AN/OR COFFEE MAKER, HOSE BIB, STEAMER PROOFER, CARBONATOR, SWAMP COOLER X $6.00 17 CROSS CONNECTION DEVICE VACUUM BREAKER, CHECK VALVE, AND R.P.B.P.D. FOR: VATS, TANKS, BOILERS X $6.00 18 INTERCEPTORS GREASE TRAP, SAND TRAP, CHEMICAL HOLDING TANK X $6.00 19 MEDICAL GAS (per outlet) NITROUS, OXYGEN X $6.00 20 MISCELLANEOUS PLUMBING FIXTURE X $6.00 21 PRIVATE SEWAGE DISPOSAL/SYS X $20.00 22 INDUSTRIAL WASTE INTERCEPTOR X $15.00 METHOD OF PAYMENT: ❑CASH ❑ CHECK ❑ VISA ❑ MC Card# AUTHORIZED SIGNATURE: REVISED 8/26/05 EXPIRES: VIN: SUBTOTAL PROCESSING FEE $35.00 TOTAL PERMIT FEE DUE: Spokane For City Use Only PLUS Project Number (r 0 /1 Project Address :9 { _ 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. ,f:) Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Spokane j1/alley Site Address: 21 S HOLIDAY RD Parcel Number: 55202.2314 Zoning: R-3 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project El Previous pre -app meeting D Plan revisions ❑ Transmittal Date: Tuesday, January 20, 2009 Project Number: Water District: CONSOLIDATED ID #19 09000116 Applicant: MCDONALD, MATTHEW W & SHAL 21 S HOLIDAY RD SPOKANE VALLEY, WA 99016 (605) 516-8423 e-mail: Contact: MCDONALD, MATTHEW W & SHAL 21 S HOLIDAY RD SPOKANE VALLEY, WA 99016 (605) 516-8423 e-mail: Contractor: OWNER ( ) - 0 Owner: MCDONALD, MATTHEW W & SHAL 21 S HOLIDAY RD SPOKANE VALLEY, WA 99016 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Project BASEMENT FINISH Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO N l CONSTRUCTION PLAN TD Please send all plan review and project comments via e-mail to the highlighted individuals.