2014, 09-30 Permit App: APR-2014-0095 Approach RepairF}}
CITY OF fi"'
Spokane
.#Valley°
PROJECT ADDRESS:
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-5240
Fax: (509) 688-0037
permitcenter@snokanevalley.org
APPROACH PERMIT APPLI
`62 5 KaUK
Project # APV -20 IL -Dogs
R E(srial'€tWotyP
PERMIT 0(111
CE (]t.1
PERMIT FEE:
C3V rcnr,Alr c: 1T:n
SUB #
REV. #I—_1
START DATE: 9 ( 3D / r ti ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME: Fnv krnr
/0/2/1 `f
DIALLING ADDRESS:
CITY:
STATE:
ZiP:
CONTACT PERSON NAME:
CLriS firrrdo
PIIONE:
FAX:
CELL: SO - 9 -.7 a -o
CONTRACTOR NAME: II --F wrojo (,..rn C „au,
MAILING ADDRESS: (OL2 j4zs-orN
STATE: 01/4)&5 In op
cox: pint r Le foliS
PIIONE:
ZiP:
FAX: CELL:
CONTRACTOR LICENSE #: CC.C2Iru-Cc reort. EXPIRES: CITY BUSINESS LICENSE #:
Residential Driveway
❑ Existing Curb & Gutter
❑ Culvert Installation
❑ Other Conditions:
PROJECT DESCRIPTION (Please Provide Site Sketch)
❑
Commercial/Industrial Driveway
❑ Rural Road Section
9 Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved
before this application can be processed.
Signature
DE -001: V-1
Date: 2A 0/ Ll
Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
['Sidewalk
ft wide
ft from back of curb
❑Streetside Swale
['Drainage Ditch
❑Drywell (show location on sketch)
❑Other (please describe below)
wI
z'
ai
at
a,
oCC;
ai
DISTANCE FROM
NEAREST PROPERTY LINE
(MAYBE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
CURB
I~4'4—THROAT WIDTH UJFT 4' I N
NIF CORNER LOT,
DISTANCE FROM
CURB RETURN
In FT (SEE TABLE)
WING (SEE TABLE)
STREET NAME
EDGE OF _/
ASPHALT
WINO
4-0 uV�
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
I—THROAT WIDTH In FT
(SEE TABLE)
STREET NAME
CURB
RETURN
STREET WITH ASPHALT EDGE
rRADIUS
RETURN
\I F CORNER LOT,
DISTANCE FROM
RADIUS RETURN
Q FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage: one on arterials
• Total width of' approaches not to exceed 50% of frontage width.
DE -00I: V -I
Page 2 of 2
Residential Approaches
Commercial
Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured from centerline to centerline of
each approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min , 40' max
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line (u r/w)
5.0'
5.0'
Minimum Distance from Crosswalk -
5'
5'
DE -00I: V -I
Page 2 of 2