2009, 06-25 Permit App: 09001871 Finish BasementProject Number: 09001871 Inv: 1
Application
THIS IS NOT A PERIVIIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: INSTALL EGRESS WINDOW, AND BUILD Contact: BEE, ROBERT S & BONNIE E
BEDROOM IN BASEMENT Address: 12512 E HOUK AVE
C - S - Z: SPOKANE VALLEY, WA 99216
Setbacks: Front Left: Right: Rear: Phone: (509) 928-9607
Group Name:
Site Information: Project Name:
Date: 6/25/2009 Page 1 of 2
Plat Key: 001220 Name: HILLCREST PARK ADD District: Sout
Parcel Number: 45272.0724 Block:
SiteAddress: 12512 E HOUK RD
Location:: CSV
Zoning: R-3 SF Res District
Water District: 011 MODERN
Area: 13,985 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Lot:
Owner: Name: BEE, ROBERT S & BONNIE E
Address: 12512 E HOUK AVE
SPOKANE VALLEY, WA 99216
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Permits:
Released By:
Originally Released: 6/25/2009 By: tmelbourn
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Gro Type Notes Sq Ft Valuation So Ft Valuation
1&2 FAMILY R-3 VB WINDOWS 0 $1,300.00 0 $1,300.00
EDROOM
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $1,300.00 0 $1,300.00
Units Unit Desc
1 SELECT
I SELECT
1 SELECT
Operator: jmm Printed By: jmm
Fee Amount
$69.25
$4.50
$27.70
Permit Total Fees: 5101.45
Print Date: 6/25/2009
Project Number: 09001871 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/25/2009 Page 2 of 2
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $101.45 $101.45 $27.70 $73.75
$101.45 $101.45
$27.70 $73.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 6/25/2009
Spikane
Valley.
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite
Spokane Valley, WA 99206
(509)688-0036 FAX: (5
www. spokaneva I ley. ore
°ENO 81 Lev
1OF SPO
8
_01UN 2
mot CENTER
onstruction
ddition/Remodel
Other:
PERMIT NUMBER: (A/87/
PERMIT FEE:
Accessory Bldg
Deck
SITE ADDRESS: ��
ASSESSORS PARCEL NO: LEGAL DESCRIPTIONS/�.7 7` /e/ /,%t.cs p .
/2 S 5 /V0be L ,0/ J`oo . l/G./%% /,t/4 , 7i -z/
Burldmg Owner::T''"`,« A. r .. .y,` x ». ` z:�
'CO° „.----
'Conti-actor '... : v h h spa
Name: /�Zoni A r. to
Name:
Address:/A5/.7,_ E 7),(, el A /eel .
Address:
City3-a . //n r �
// Stat, Zip:wy/4
City: State: Zip:
,�OO
Phondr�o 92 /96 F Fax:
T
Phone: Fax:
J
Contractor Lic No: Exp Date:
_Contac&Person'. '-
CONSTRUCTION TYPE:
rrrncc%%%meg .
City Business Lic. No:
SEWER OR SEPTIC?
�
s_‘.4..)e /----
Name: /Sony? /r /4i'r •
Phone: (SO 9)
999- of92`/ .
Describe the scope of work in detail:
60
Cost of Project: $ /360 0!'-
/ ..1 yr s5 a)/h /-e_i ,3 /ct,/0/ `,c A,,rn
Proposed Use:
**************The followint? MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/V//q
The
DIMENSIONS:
1/7/q
# OF STORIES: /
TOTAN� I ABLE SPACE:
A./7/15
MAIN FLOOR TO SQ.
FTG: 1 /
2"D FLOOR SQ. FTG: �1
x///qri/d/PP7A/
UNFIN BASEMENT SQ. FTG:
//t1
IMPERVIOUS SURFACE
AREA: /1.//�
SQ I FTG: //EK�T
GARAGE SQ. FTG:
DECKA//P 10 SQ. FTG:
PROPERTY: 0% SLOPES ON /1//
# OF BEDROOMS:
CONSTRUCTION TYPE:
rrrncc%%%meg .
HEATS UR :
D, / / r.7a7'p .
SEWER OR SEPTIC?
�
s_‘.4..)e /----
The permitee verifies, acknowledges and agrees bgfheir signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be pr.. - ed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15107
Check
DATE: /a
❑ Mastercard ❑ VISA
Expires: VIN#:
',t fa, .rte _>,'r o-° , d't •..
Spokane
. Valley°
.1) 21;? -;;be" -1;`4;"
For City Use Only
PLUS Project Number L% /,�Q/7/
Project Address /�Sa TVIl{L/� ,
11703 E Sprague Ave Suite B-3 • Spokane Valley.WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter®pokanevalley.org
As part of our on-going commitment to customer service during the review, process. of •your; project
application, we are providing you'with a TARGET DATE for the initial technical application reView. If for
any reason we cannot meet this date, we will contact you with a revised target date..
Your application review TARGET DATE is / .� /C, 53
The TARGET DATE is the dafe we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance. .
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents. , -'
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or reviser/ information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City ion he changed, one individual with the
expertise fa- dealing with reviewer comments would be the best choice for the entire review process.
i Call staff regarding the status of your project only after the target date shown at the top of the page..
Although you should he contacted on or by the target date, please feel free to contact us if you haven't heard from ns
by vour target date. Staff may contact you hefbre the target date if the initial review is complete..By following this
procedure, you will save time and allow the reviewers'to complete the work snore expeditiously.
Steps in the Permit Process ;
1. Counter -Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have - been "approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical, staff from completing the technical review once it is started.. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete; including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received,.a Permit Specialist will process the application and contact the 'person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07