2010, 01-13 Permit App: 09003901 Fire Damage Repair (2)Project Number: 09003901 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 1/13/2010 Page 1 of 2
Project Information:
Permit Use: REPAIR FIRE DAMAGE OF HOME Contact: KLEIN'S HOME IMPROVEMENTS
Address: PO BOX 3002
C - S - Z: HAYDEN, ID 83835
Setbacks: Front Left: Right: Rear: Phone: (208) 772-7734
Group Name:
Site Information: Project Name:
Plat Key: 999999 Name: Range
District: Nort
Parcel Number: 45074.9028 Block:
SiteAddress: 8407 E KNOX AVE
Location:: CSV
Lot:
Owner: Name: RUGER, BEN F
Address: 8407 E KNOX AVE
SPOKANE VALLEY, WA 99212-234
Zoning: R-3 SF Res District
Water District: 098 SPO CO WATER DIST#1 Hold: ❑
Area: .27 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review
Building Plan Review
Permits:
Released By:
Originally Released: 1/13/2010 By: tmelbourn
Building Permit
Contractor: KLEIN'S HOME IMPROVEMENT Firm: KLEIN'S HOME IMPROVEMENT
Address: PO BOX 3002 Phone: (208) 772-7734
HAYDEN ID 83835
This Application: Total Project:
Description Gtr Type Notes Sa Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB REPAIR 0 $115,000.00 0 $115,000.00
FIRE DMG
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $115,000.00 0 $115,000.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$1,077.75
$4.50
$431.10
Permit Total Fees: $1,513.35
Operator: jmm Printed By: jmm Print Date: 1/13/2010
Project Number: 09003901 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 1/13/2010 Page 2 of 2
Payment Summary: :.,.... ,r,.,.. a.. .:. iZI... : ,....
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid
$1,513.35 $1,513.35 $431.10
Amount Owing
$1,082.25
$1,513.35 $1,513.35
$431.10 $1,082.25
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 1/13/2010
SPou'kane
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206 C C
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@spokanevalley.orq I�
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION
0 DECK
❑ ADDITION/REMODEL 0 ACCESSORY BUILDING
® OTHER
SITE ADDRESS:8407 E. KNox AVE.
ASSESSORS PARCEL NO.:45074.9028
LEGAL DESCRIPTION:
BUILDING OWNER NAME:BEN RUGER
NAME:BEN RUGER
ADDRESS:8407 E. KNOX AVE.
CITY:SPOKANE VALLEY
STATE:WA ZIP:99212
PHONE:
FAX: CELL:
CONTACT NAME:
PHONE:
FAX: CELL:
CONTRACTOR NAM E:KLEIN'S DISASTER KLEENUP
MAILING ADDRESS:P.O. Box 3002
CITY:HAYDEN
STATE:ID ZIP:83835
PHONE:208-772-7734
FAX:208-772-6250 CELL:
CONTRACTOR LICENSE No.:RCE-747 EXPIRES:14/08 /J D CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
REPAIR FIRE DAMAGE
PROPOSED USE:
Effective October 28, 2007 Page 1 of 2
hKn. //......... ne.nl.nnn..ell........../..wl..n.l../r`nev.m..na.• nn..vineseve....rtnnr..mnnFr/C.e.v.../O..:III:.+n to..n:.l..nr:..l /^..nna...• ...Fines n.....":r
****YOU MUST COMPLETE THE FOLLOWING****
Height to Peak:
T 9 "
Dimensions:35 x 57
No. of Stories:1.5
Total Habitable
Space:
Main Floor SQ
FT:1338
Upper Floor SQ
FT:835
Unfinished Basement
SQ FT:1144
Finished Basement
SQ FT: ji/4
Garage SQ FT:
/\) A-
Deck/Covered Patio
SQ FT:564
Impervious Surface
Area:
30% Slopes on
Property
No. of Bedrooms:3
Construction
Type:
Heat Source:
Sewer or
Septic:
TOTAL COST OF PROJECT: $ i/5 o00 Oft"
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submif ed and subsequently approved before this application can be processed.
Signature
Method of payment: D Cash 0 Check
Bankcard #:
Date: /1 -
0 Visa 0 Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
1-e......ii....... n....l..,...... n... .. n...i.....l, n......i.....,.....1.11.1.............+..ic...... /13..:1.4iss /D..•••:.i....4:r......,r.....+:..., n0....,..:4.
Spokane
jUalley�
For City Use Qnly
PLUS Project Number
Project Address ,':,(-7,-%
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07