2009, 11-03 Permit App: 09003423 Patio CoverProject Number: 09003423 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information: .. ,aaaa., ... .. ..,«
Permit Use: CONSTRUCT 11 X 18 PATIO COVER ATTACHED Contact: DEXTER, SCOTT D & MICHELLE L
TO RESIDENCE Address: 8521 E KNOX AVE
C - S - Z: SPOKANE VALLEY, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 926-0662
Group Name:
Date: 11/3/2009 Page 1 of 2
Site Information:
Plat Key: 000000 Name: Range
Project Name: PATIO COVER
District: Nort
Parcel Number: 45074.0241 Block:
SiteAddress: 8521 E KNOX AVE
Location:: CSV
Lot:
Owner: Name: DEXTER, SCOTT D & MICHELLE
Address: 8521 E KNOX AVE
SPOKANE VALLEY, WA 99212
Zoning: UNKN Unknown
Water District: Hold: ❑
Area: 10,566 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:Aeg . ro., .,rampuo z .. _;
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
Permits:
11/3/2009 By: tmelbourn
Released By:
The site is located within the Horizontal Zone of the Airport Hazard Overlay Zone. The site elevation is
approximatley 1972' above sea level, and the airport elevation is at 1952 above sea level. The horizontal
zone is established at 2102' above selevel
Originally Released: 10/23/2009 By: lbarlow
Operator: MT Printed By: jmm
Print Date: 11/3/2009
Project Number: 09003423 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 11/3/2009
Contractor: OWNER
Total Area
Description
COV DECK
198
Building Permit
Page 2 of 2
Firm: OWNER
Phone: (000) 000-0000
Building Characteristics
Type
R-3 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Notes
PATIO
COVER
This Application:
Sq Ft Valuation
198 $2,970.00
Total Project:
Sq Ft Valuation
198 $2,970.00
Totals: 198
Units Unit Desc
SELECT
SELECT
SELECT
$2,970.00
Permit Total Fees:
198 $2,970.00
Fee Amount
$83.25
$20.81
$4.50
$108.56
Notice is herin provided that this property is located within the Airport Hazard Overlay zone of the City
of Spokane Valley, Washington and is subject to restriction on height and use pursuant to SVMC
19.110.030 as it may be amended.
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount
$108.56 $108.56
$108.56 $108.56
Amount Paid
$20.81
Amount Owing
$87.75
$20.81
$87.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: MT Printed By: jmm Print Date: 11/3/2009
Spokane
_Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
SITE ADDRES
PERMIT NUMBER: (,
PERMIT FEE:
New Construction
Accessory Bldg
n Addition/Remodel Deck
Other: ?41- o c tier -
17, '
f%vj�brC—
o , t) L/ i
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name: �Q.,, rr , /%=')C
7,/L
Address: Slte (
f=i.,} ox
City:,
t
StateLJ..
zip:�qZ%
Spokane
_.. Valley®
For City Use Only -
PLUS Project Number 10 . J t't
Project Address
1 ! ,� ;
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is L
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
Contractor:
/
_j_
1-���t-----�-rr-r--+
||
`- --- n
-�-'-------F---�'------f--`-� '-�`-------- !� '4
r
^/
�
—1 /
|
__�_..�
1 i1
'^ � �� � - �~' |
- |
+ / � |
_ ,---_^ ^ ~_ ' ~ _ ___ -1--- .
� /' / | | . | /
� . . .
- - - / -I 1
' ^ + � ' ' |
/- ~ -t + ! L~.
~� i | 1 ^ . / r r , / i
-^ | |
L • - / � �� , ,_L ,4 + [ -��- ]-� + ! !
` . . .
' | 4j 1 /
�` / ! / | | | |l
. ' ` `
�� ��- J| '-� +�}��_1r T� -,- 1 '~
� � ` 1|W� ' / ~ ' i �
| + , ` |
III /| | � I|/ /
� 1 ` [ � � - � / r- /
| | f / T , '� t
� | --~ � � ^ ` r �' + / -
4-
..., . . ^"". '
� , i ^ ^1 ��- ^ ^
�� , L - � , ��' � f ^ /
| � - '� / ^ i
| l |
'1 | 1 | ! � � f ' ` / � t ' / r-�- �
. . �_/ �-�- �
| i
r1 ' f � | --1.
'-- ,` r r r �-� - 1 | ' ^ -i [` -�-T-
� +� I-
1 � r l-- |--1 1 | - � .L .1.
� --~' r + --L--'---L- 4 . [ - -- � ]
'' . //
/
[t |---- ----1--- ' ------'�'
__-- +__-�___--__-__ .41 -_- --_ /
� ' / ./ /
^ ` . + / . � ��-^----�-�'- |wr-'-`-f
� � --' / | -- 7 L '---4.-
4
-| IF I- /4.4'|
^ --~ --- / -----�'�---r ' ' L
/ / / /
� - ---, -- -~------ ---r- - .- ,
4-- -�---�-------_-|-�-� ~
| | | �, / /
| | / [
������������������ � � ����
� � ` ' ' ���
��v��`� 1-/` | | | � ! ��
~
—1
|
�
T
-4
i
/
--------T---T -17-7----
+ 4-� t
� / �
/ f -�� [- /
� 1 r� ++ �� /+
/- | i
-1 + t -r - . -
/t r `
Spo'liane
OValley®
11703 E Sprague Ave Suite B-3• Spokane Valley WA 99206
♦509.688.0036 ♦ Fax: 509.688.0037 •
Scott & Michelle Dexter
8521 E. Knox Ave.
Spokane Valley, WA 99212
Re: Project No. 09-003423
The fastening of the patio cover rafters to the existing rafters or trusses is not allowed
without engineering. The patio cover rafters must be fastened to the existing residence
and garage walls. A generic detail with four options is provided.
In addition, the patio cover rafters, if extended back to the wall, would cause the
proposed rafters of 2x6 @ 24"oc to be over spanned. The following options would be
allowed: 2x6 @ 12"oc, 2x8 @ 16"oc, or 2x10 @ 24"oc for a 12' span. The maximum
span for the (2) 2x8 beam is only 8' 1" between posts. It may be necessary to utilize a
larger beam or set the posts at that distance.
The maximum height of the posts is not listed, but must be less than 10 feet. The
common sizes for felt underlayment are15 psf and 30 psf. It is also unclear if the house
is attached to the garage or if there is a connecting breezeway. Please clarify the sizes
of beams or walls if applicable. A fire rated wall on the garage side may be required.
If you have any questions please feel free to contact me at (509)688-0044 or
tmelbournaspokanevalley.orq
Tom Melbourn, Plans Examiner
1
Architect:
Contractor:
Q
c65 ��
/ e-�
/ i
-r-
-
-1.1--- 1 -
_
-
_ i--,-
-
+
Mme
NM
-
JJ-
- _
E---1-
if
_�.
i.1-
I
I
!
I
T
I
i 1
-
-
�-
r
- I
{ -� -
--r--
--
---I-4--
-
-
j
1--.J,
11
I j
i
T
J.
i
�_-
-�-_fit
---1L
Li
1
} TI
I
NI
H
f 1
____
_
_i.
I }
--
- �------
- --
----
1
- -I -----I
r'i%
-
Pi
OP
-----J--
-I----�----
I
---
---
-�-`-
----
------
I
-
--
►
�,
—
A.
-
r-
- -
_
---
_.�4►3 •&
-�/� o,
-
-
-
jam.
-.
-
-
1111■
1
I
T
I
I
if
sis
1 la
[
'- _'-
-
-
_ ___
-----
,
_
:
I. i
I-
-I-
1111
._
■
}I
■
1
-L-
- r
1
1
--r
jr
Li_
1L-t�
L- r_1__.___iJ-L1
r